船舶专业英语

2024-04-27

船舶专业英语(共6篇)

篇1:船舶专业英语

1.您好!(第一次见面)How do you do?

2.您好!见到您很高兴。How do you do? I’m very glad to meet you.3.

让我来介绍一下在座的各位先生。林先生,我们厂的厂长;王先生,厂长总工;吴先生,船体车间主任。Let me introduce the gentlemen present here.This is Mr.Lin, our shipyard manager;Mr.Wang, our chief engineer.Mr.Wu, director of the hull shop.4.

欢迎您到我们船厂来!welcome to our shipyard!

5.请坐!Sit down please.6.

好的,谢谢!Thank you.7.

请喝茶。Please have a cup of tea.8.

喂,您好吗?(熟人之间)Hi, how are you?

9.很好,谢谢。您好吗?Fine, thank you, and how are you?

10.很好,谢谢!Very well, thanks.11.

我们现在就开始工作好吗?Shall we start our work now?

12.好的。OK.13.

请这边走。This way, please.14.

我可以进来吗?May I come in?

15.请进!Yes, please.16.

早晨好,女士。Good morning, ma’am(Madam).17.

早晨好,布莱克先生。请坐。Good morning, Mr.Blake.take a seat, please.18.

谢谢!Thank you, ma’am.19.

请问您有什么事和我商讨?What business would you like to talk with me about?

20.船东想在船上做些变化。The ship owner wants to make some changes in the hull.21.

这样的事,我只能晚些时候回答您。In that case, I need to answer you later.22.

好的。如果你做出了决定,请尽快告诉我。OK.If you make the decision, please tell me soon.23.

没有问题,再见!No problem.Good bye.24.

再见!Good bye.25.

下午好!Good afternoon!

26.下午好!Good afternoon!

27.有一个舱口盖有点问题,我想和你谈谈。There is something wrong with the hatch cover.I would like to discuss it with you.28.

对不起,我听不懂您讲话,您能说得慢一点吗?I’m sorry.I can’t follow you.Can you speak slowly?

29.我的意思是我想和您谈一谈舱口盖的问题。I mean I want to talk with you about the hatch cover.30.

噢,我懂了。到我办公室去详谈。Oh, I see.Let’s go to my office and talk it cover in detail.31.

那再好不过了。That couldn’t be better.32.

我想要一份这种图纸。I would like a copy of this drawing.33.

对不起,我帮不了这个忙。您可以到技术科去要。I’m sorry.I can’t help you.You may ask the technical department for it.34.

您知道电话号码?Do you know the telephone number?

35.分机号是4557。It’s 4557 extension.36.

谢谢!Thank you.37.

非常愿意帮助您!My pleasure!

38.你们船厂造什么船?What ships do you build?

39.集装箱船,散装船,还有一些驳船。Container ships, bulk carriers, and some barges.40.

你厂吊车最大起重能力是多少?How much is the maximum lifting capacity in your shipyard?

41.300吨,是船台用起重机,跨度72m。300 tons, it is a berth derrick, the span being 72m.42.

在这里,你们怎么样对钢板进行预处理?Here, how do you pre-treat(prepare)the steel plates?

43.我们用抛丸(喷沙)的方法。We call it short-blasting(sand-blasting).44.

抛丸后还要将钢板涂漆吗?After short-blasting, do you paint the steel plates?

45.是的,我们称之为车间底漆。Yes, we do.And we call it priming paint.46.

钢板移动的速度是多少?How fast is the plate moving?

47.大约每分钟5米。About 5m a minute.48.

你们怎样切割钢板?How do you cut a steel plate?

49.小于10mm的钢板,用机械切割法。For plates has than 10mm,we use mechanical cutting method.50.

那么大于10mm的呢?How about the plates over 10mm(thicker plates)?

51.我们用火焰切割法。一般这些切割都是数控的。We use the flame cutting method.Most of the cutting is done by number control(N/C).52.

怎样将钢板加工成不同的形状呢?How do you make the steel plate into different shapes? 53.

我们有不同种类的冲、压机械。可滚压,弯制和折边。We use different kinds of press machines.We can roll, bend, or flange a plate.54.

型材怎样加工呢,像球扁钢,角钢和一些加强材?How do you shape the different sections, such as, bulb plates, angle bars, and other stiffeners.55.

用同样的方法。但我们也用水火弯板法;该法主要用于加工不规则形状,像球鼻艏。By the same method, but we also use the line-heating methods.This can shape irregular parts, such as bulbous bow.56.

你怎样知道弯制合格了呢?How do you know the bending is good?

57.我们用样板来检验。We will check it with templates.58.

在焊接钢板,肋骨,甲板横梁时,你们用什么焊接方法?What welding methods do you use in connecting the plates, frames, and beams?

59.对于长直接板缝,我们用埋弧焊或二氧化碳气体保护焊;拐角处和小地方,还用手工焊。For straight seams, we use submerged arc welding or carbon dioxide welding;for some corners and small areas, we still use manual welding.60.

就水密舱壁而言,怎样检查其水密性?For watertight bulkheads, how do you check the watertightness?

61.靠压缩空气或水压力。By compressed air or by water pressure.62.

双层底分段是在胎架上造的吗?Is the double bottom block built on pin jigs?

63.是的,里面的一些管件也已经装好了。Yes, some pipes in it have also been fitted.64.

分段大合龙在哪里进行?Where is the grand-block joining done?

65.在船台上。On the building berth.66.

在你们船厂船舶怎样下水?How is a ship launched in your shipyard?

67.我们通常采用纵向下水方式。We usually launch a ship by end launching.68.

船台和下水支架有什么区别?What’s the difference between building-berth and launching-cradle?

69.

船台是固定的地面支撑,下水支架仅用于下水时用。后者在下水时与船体一起滑入水中。Building berth is the fixed ground support and launching-cradle is only used before launching.The latter will be sliding together with the ship into the water.70.

舾装工作包括哪些?What work does the outfitting include? 71.

除了船壳结构外所有的部分,像管子,(甲板)起重机,桅杆,索具,主机,机械设备,电缆和居住舱室的装饰。All the parts except the hull structure, such as pipes, derricks, masts, rigging, main engines, machinery, electrical cables, and accommodation services etc.72.

一般情况下你们什么时候开始舾装工作?When do you begin the outfitting generally?

73.

有些管路舾装在制造小分段时就开始了,也叫做分段预舾装;其它的在船舶下水后进行。Some piping outfitting is done when building sub-blocks, that is, on-block outfitting;others are done after launching.74.

有怎么多加工好的管子!可是怎样才能找到你所需要的管件呢?T here are so many fabricated pipes!How can you find the pipe piece you need?

75.

对每个管件我们都编了号,并且将所有的管件存放在不同的托盘中。We give each pipe a coded number, and we store all the pipe pieces in different pallets.76.

机舱中有许多管系,像燃油系统,冷却系统,滑油系统,消防系统,怎样识别它们?There are many piping systems in the engine room, such as fuel oil system, cooling system, lubricating system, fire-fighting system.How do you identify them?

77.

靠不同的颜色条。例如,蓝色表示冷却水,红色表示消防用水,黄色表示润滑油。By different color tapes.For example, blue means cooling water, red for fire fighting, yellow for lubricating oil etc.78.

当安装一管件时,你怎样决定管件在船上的确切位置?When fitting a piece of pipe, how do you determine the exact position on board a ship?

79.

看图纸,图纸上清楚地表明了管件的三维尺寸。We do it with the help of drawings.The drawing shows clearly the three dimensional position of a certain pipe.80.

怎样打开舱口盖?How can you lift the hatch cover?

81.

使用液压系统。We lift the hatch cover by hydraulic system.82.

怎样保证舱口盖水密?How is the hatch cover kept watertight?

83.

借助于橡胶密封条,将其安装在舱口围板四周。By rubber strips.We’ve installed the strips along the hatch coamings.84.

甲板上的舾装包括哪些?What outfitting should be done on deck? 85.

包括以下部件的安装:锚机,绞车,带缆桩,导缆孔,桅杆,甲板起重机,通风口和各种索具。That includes the installation of windlasses, winches, bollards, masts, deck cranes, vent pipes and different kinds of rigging.86.

有这么多的舾装工作要做,你们将工程分包出去吗?There is so much outfitting work.Do you subcontract some of them?

87.

时的,我们把所有的细木工舾装都分包出去。这将节约我们很多的时间。Yes, we subcontract almost all the joiner work.This will save us lots of time.88.

居住舱室有哪些舾装工作?What outfitting is include in the living quarters?

89.

主要指门窗的安装,地板的铺设,内置式家具的安装和油漆。It refers to installing doors, windows, laying floor covering, fitting built-in furniture, and painting.90.

位了防止腐蚀,油漆是很重要的,对吗?I n order to prevent hull corrosion, painting is very important, isn’t it?

91.

是的,有很多油漆,有的合适船体水上部分,有的适合于水下部分。Quite right, there are many kinds of paint, and some are suitable for above-water use, and some are for underwater.92.

油漆的涂层有多厚?How thick is the coating film?

93.

这取决于不同种类的油漆。涂层的厚度可能是30,75或者145微米。That depends on the different paint types.The film thickness may be 30μm, 75μm, or 145μm.(micron meters).94.

喷漆时对温度有要求吗?Are there any requirements for the temperature when painting?

95.

有。通常温度应介于-10ºC到40ºC之间,相对湿度应介于50%-80%。也要有好的通风。Sure usually the temperature should be from(minus)-10ºC to 40ºC(Celsius),and the relative humidity should be between 50% and 80%.Good ventilation is also quite necessary.96.

怎样知道面漆涂层质量是好的?How do you know the finish coating is of good quality?

97.

您可以靠肉眼观察。如果表面光滑,无裂纹,不起跑,一般说是好的。但必须得到检查人员或船东的许可。You can check the surface by your eyes.If the surface is smooth and there is no crack is no blisters on it, usually the painting is good.But it must be approved by the painting surveyor or the ship owner.98.

交船前怎样对船体外板进行油漆?Before delivering the ship to the owner, how do you paint the shell plating?

99.

一般在干船坞中进行。We will do this in a drydock.100. 机舱位于什么部位?Where is the main engine located?

101. 通常在船艉。Usually at the stern of the ship.102. 这条船上有多少台发电机。How many generators are there are there on board the ship?

103. 四台。其中一台是应急发电机。There are four.One of them is an emergency generator.104. 这间舱室有怎么多的泵,用在什么上的?There are so many pumps in this room, what are they used for?

105. 它们是燃油泵,润滑油泵,压载水泵,淡水泵,海水泵,和舭部液舱泵等。They are F.O.pumps, ballast pumps, fresh water pumps, sea water pumps, and bilge pumps.106. 泵有几种?How many types of pumps are there?

107. 通常有两种:往复式和离心式。Usually there are two types.One is called the displacement pump and the other is called the centrifugal pump.108. 为什么需要压缩空气?Why do we need compressed air?

109. 在船上主要用于启动主机。It is mainly used on board ship for staring main engines.110.

111. 油水分离器也是必要的,是吗?Oil/water separators are necessary, aren’t they?

112. 是的。它们可以使油水分开,从而使排放的水保持清洁。Yes, they can keep oil and water apart and keep the discharged water clean.113. 热交换器是用于冷却的吗?Are the heat exchangers used for cooling?

114. 是的,它们用于冷却空气,水和润滑油等。Yes, they are used for cooling air, water, lubricating oil etc.115. 轴的对中任务完成了吗?Has the shaft alignment been finished?

116. 还没有。这需要反复的测量和计算,经验也很重要。Not yet, it needs repeated measuring and calculation, and some experience is also very important.117. 轴的尾轴承安装顺序如何? How do you install the afterward bearing of the shaft?

118. 首先要镗孔,然后安装尾轴管,接下来装炮铜或白合金制的轴承套,也叫轴承。First you need the boring for the shaft, then install the stern tube into the stern frame, next fit the gun-metal or white-metal bush.119. 你的意思是轴会与轴承套直接摩擦吗?Do you mean the shaft will run against the bush?

120. 不,在轴承内侧有一些槽,槽中嵌着橡皮条。这些橡皮条支撑着尾轴。No, inside the bush, some rubber strips are pressed into the grooves.These strips support the shaft.121. 怎样安装螺旋桨?How do you install the propeller?

122. 现在许多螺旋桨都是无键的,用液压来拆装。Now many propellers are kevless, so we install or remove a propeller by hydraulic pressure.123. 我想船上会有越来越多的电器安装,你这样认为吗?I think that there are more and more electrical installations on board ships.Do you think so?

124. 是的。特别是机舱控制,货物吊运和电子设备。Of course, especially the main engine room control, cargo handing, and electronic systems.125. 我想主机控制是最复杂的。I think the main engine control is the most complicated.126. 你说得对。因为主配电板安装在这里。You are quite right, since main switchboards are located there.127. 主配电板能控制什么?What can the main switchboards consist of several panels: group starter panels, consumer panels, lighting panel, diesel generator panels etc.128. 主配电板通常包括几个控制面板:组合启动面板,用户板,照明面板,菜油发电机面板等。Usually the main switchboards consist of several panels: group starter panels, consumer panels, lighting panel, diesel generator panels etc.129. 报警系统包括在上面的面板中吗?The alarm system is also included in the above panels?

130. 是的。主配电板中也可进行岸电和船电的切换和控制。Yes, and there can also be the power interchange between shore supply and ship supply.131. 一些控制可以自动完成吗?Can some controlling be done automatically?

132. 当然。有两种方式可供选择:自动和手动。Certainly, there are two modes for your selection: automatic mode and manual mode.133. 船上电缆的铺设是由你们船厂的电工人员完成的吗?Are the electric cables laid out by your shipyard electricians?

134. 说得对。而且对电缆铺设还有些要求。电缆端部要配接头。That’s right.And there are some requirements for the cable laying.Moreover, all cable ends must be fitted with connectors.135. 怎样固定电缆?How do you fix a cable?

136. 单根电缆可用焊在结构上的电缆夹头;成组电缆用金属电缆悬挂架。Single cables may be fixed by clips welded to structures;cables in groups are supported by metal cable hangers.137. 电缆穿过水密舱壁怎么办?What do you do if a cable passes through a watertight bulkhead?

138. 那样的话,需要安装专用的密封过管来确保水密。In that case, special stuffing tube will be used to keep the watertightness.139. 一般来说,怎样保护电缆免受破坏?Generally, how are the cables protected from damage?

140. 在舱口及露天甲板处,用可拆卸的金属盖板:在一些高温和冷冻区,我们都将电缆进行绝热、防冷等保护。In places such as hatches, and open decks, we use removable metal coverings, in some hot or refrigerated places, we use insulated cables.

篇2:船舶专业英语

船体结构

scantling 船材尺度

2外板和甲板板

外板shell plate

端接缝(横向接缝)butt 边接缝(纵向接缝)seam 船底板(bottom plate):平板龙骨bottom plate 舭列板bilge strake

舷侧外板side plate 舷顶列板sheer strake 垫板 insert plate

外板承受如下各种力的作用:(1)总纵弯曲(2)横向载荷(3)动力载荷(4)偶然性载荷

3船底结构

单底 single bottom 双层底 double bottom 内龙骨 center keelson 旁内龙骨 side keelson 肋板floor T型材 T-bar 球扁钢 bulb plate 腹板 web 面板 face plate 折边 flange 肘板bracket 舭肘板bilge bracket

中/旁底桁bottom center/side girder

内底纵骨 inner bottom longitudinal 外底纵骨bottom longitudinal 人孔manhole

减轻孔 lightening hole

横骨架式双层底肋板三种形式: 主肋板solid floor

水密肋板 watertight floor 框架肋板bracket floor

加强筋stiffener

不等边角钢angle bar

内底板inner bottom plate 边板margin plate

圆舭easy bilge

折角形舭sharp cornered bilge

4舷侧结构

肋骨frame:

(1)主肋骨main frame

(2)甲板间肋骨tweendeck frame(3)中间肋骨intermediate frame 强肋骨side transverse(web frame)舷侧纵桁side stringer 护舷材fender

5甲板结构

weather deck露天甲板 甲板骨架deck framing 横梁beam

强横梁deck transverse(web beam)甲板纵桁deck girder

甲板纵骨deck longitudinal(船舷上的)排水孔scupper grillage beam 交叉梁系;板架

6舱壁结构

舱壁bulkhead 水密舱壁watertight bulkhead 纵舱壁longitudinal bulkhead 横舱壁transverse bulkhead 垂直/水平扶强材vertical/horizontal stiffener 竖/水平桁vertical/horizontal girder

8上层建筑和机舱棚结构

上层建筑superstructure包括船楼和甲板室。船楼的两舷伸至船的两舷,或距舷边的距离小于船宽的4%

甲板室deck house 首楼forecastle 驾驶楼navigating bridge 桥楼bridge 尾楼poop

舱室compartment

居住舱accommodation 燃料舱 bunker fore/aft peak tank 首/尾尖舱 coffendams隔离空舱

船舶设备

derrick 起重机 crane大型起重机 winch绞盘 mast 桅杆

fork lift truck叉式装卸车 steering gear操舵装置 rudder舵

rudder pintals舵销 grab抓斗

其它

tripping bracket 防倾肘板

bow and stern transom plate 首尾封板

transom 结构中横向构件

hawse 锚链孔, 停泊时船首与锚间的水平距离

striking plate 垫板

tripping bracket 防倾肘板 stiffening 扶强材

hatch ways 舱口(门)hatch coamings 舱口围板 strut 撑杆

船舶类型

warship(cargo/passenger/merchant)ship 军船(货/客/商)船

shelter deck ships遮蔽式甲板船 liquefied gas carrier 液化气船 liquid natural gases ships LNGs bulk carrier 散货船

OBOs bulk carrier which can carry Ore(矿石),other bulk cargoes and Oil.Refrigerated cargo ships

container ship集装箱运货船 full scantling ship 全尺寸船 three island ship 三岛式船(1)merchant:(1.1)cargo:

bulk carriers,OBOs,LNGs,oiltanker, Oretanker,liquefied gas carrier, RGs,dry cargo carriers, liquid cargo carriers, shelterdeck,3 island, full scantling ship,tramp(1.2)passenger ship:

cross channel,oceangoing lifeboat ferry 渡船

tourist ship游船(1.3)intermediate: passenger cargo liners(1.4)others trawlers拖网渔船

(2)special designed ships hovercraft 全升式气垫船 sidewall craft侧壁式气垫船 air cushion craft气垫船 hydrofoil boats 水翼艇 ,multi-hull ship多体船 catamaran 双体船

SWATH(small waterline area twin-hull ships)小水线面双体船 Tug 拖船 pusher推船

Fishing ship,fire ship消防船 Dredger 挖泥船(3)warship submarine , aircraft carrier 航母 cruiser 巡洋舰 patrol sloop护卫舰

码头

quay[ki:] 贴岸码头 pier 凸式码头;防波堤

船舶原理

towing tank 拖曳水池 calibrate 标定、标准

transversely framed ship 横骨架式船 span thickness ratio 跨距厚度比 principal主尺度

general arrangement总布置图 Port and starboard 左舷和右舷 freeboard 干舷 bilge舭部

fore and aft船首与船尾 amid ship船中

form coefficients 船型参数 gunwale 船舷上缘 perpendicular 垂线

aft ~ 艉垂线 fore~艏垂线

the length between perpendiculars(l.b.p)the length overall(l.o.a)the length on the waterline(l.w.l)breadth moulded/molded 型宽 depth~型深 stern 船尾 stem船首

sheer舷弧

forward sheer首舷弧

camber(round of beam)梁拱 bulbous bow球鼻首 dock船坞

ratio of breadth to draught 船宽吃水比 dead weight 载重 resistance船舶阻力 maneuver 操纵 propulsion推进 twin screw双桨

bow thrusters 船首加速器

weather load风雨载荷

turn round of ships船进港、装卸及出港的过程

buoyancy浮力

reserve buoyancy 储备浮力 stability稳性 trim纵倾

surging纵荡(沿x轴)swaying横荡(沿y轴)heaving升沉(沿z轴)

heel 横倾 trim 纵倾 yaw 首摇

drift漂移,偏航

rolling横摇(绕x轴)pitching纵摇(绕y轴)yawing首摇(绕z轴)?

阻力

wave_making resistance 兴波阻力 viscous resistance 粘性阻力 frictional resistance

摩擦阻力 eddy_making resistance 兴涡阻力 residuary resistance 剩余阻力 viscous_pressure drag resistance 粘性压差阻力 效率

propulsive efficiency 推进效率 hull efficiency

船身效率 relative rotative efficiency 相对转动效率

optimum efficiency 最佳效率 propeller efficiency

螺旋桨敞水效率

angle of incidence攻角 interference effect干涉效应

金属

copper 铜 manganese 锰 silicon 硅

magnesium 镁 aluminium 铝 carbon 碳 iron 铁 nickel 镍

mild steel 低碳钢

力学相关

section modulus 截面模数 W=I/z radius of gyration of the section 截面的回转(惯性)半径

modulus of elasticity 弹性模量 Young’s modulus 扬氏模量 a bar of uniform 等断面梁 circular shaft 圆轴

slanderous ratio 细长比 hollow box girder 箱形梁 longitudinal girder 纵桁 web 腹板 flange 翼板 buckling屈曲 compressive 压缩 tensive 拉伸

ultimate strength 极限强度

ultimate tensile strength 极限拉伸强度 yield stress屈服应力

allowable stress 许用应力 permanent set永久变形

critical load临界载荷 necking down 颈缩

ratio of elongation伸长比 the gauge length标距 ductility韧性

standard notched specimen标准切口试件

tensile test 拉伸试验 eccentric load偏心载荷 instability 失稳

fixing condition 固定条件(边界条件)the rate of loading 载荷密度 concentrated reaction 集中力 weight per unit volume比重 degree of fixity固定程度 rigidity 刚度

fictitious 虚假的、编造的、虚构的(fiction小说)shear flow剪流 corner 角隅

correction factor 修正系数 constant of integration 积分常数 strip theory 切片理论

statistical strain gauges 统计应变仪 response amplitude operator 响应振幅算子

oblique(倾)斜的

strain energy method应变能方法 theorem of least work 最小功原理 moment distribution弯矩分配法

the plane frame approach平面刚架法 bottom shell plating 船底外板

the finite element method有限元法 mesh, network 网格 node节点

displacement位移 local failure局部破损 cracking破(断)裂 brittle脆性断裂 corrosion腐蚀

数学运算相关

less 减去 times 乘以

divided by 除以 1/2 half 1/3 one third + plus-minus × times(multiplied by)÷ divided by ≤ less than or equal to(not great than)<< much less than = equals(be equal to)≡ identical with 恒等于 ~similar to ≈ approximate equal to 约等于 ∝ vary as/proportional to随…变化 ∞ infinite x square root of x 3x cube root of x dx differential of x ux partial derivative u with respect to x dudx derivative u with respective to x integral baintegral between a and b line integral around close path summation of f(x)function of x a

a prime a

a double prime a

a triple prime ax a sub(subscript)x x2 x squared

x3 x cubed

xn x to the power of n xabc a equals a plus b on the top of c

la(n1)d l equals a plus open

bracket n minus 1 close bracket

xp1xp

x to the power of minus p

equals one over x to the power of p

x2a2(xa)(xa)x squared

minus a squared equals x minus a times x plus a

A2R2d2cRcRc4 capital A

equals two pi capital R subscript small c open squared bracket capital R subscript small c minus square root of open bracket capital R subscript c squared minus small d squared over 4 close bracket ,close squared bracket

histogram form 直方图 logarithm 对数

probability density 概率密度 standard derivation 标准差 probalistic 概率方法 deterministic 解析方法

linear simultaneous equation 齐次线性代数方程组 elliptical椭圆的 parabolic 抛物线的

calm of slight(无)微风 moderate 和风 rough强风 very rough烈风

extremely rough 狂风

以下摘自“正方翻译网”

http:// dugout 独木舟 barge 驳船

kayak(爱斯基摩人的)木排 outrigger 桨叉架船

rowing boat 划艇(美作:rowboat)gondola(意大利的)长平底船 whale mother ship 捕鲸母船 hydrofoil 水翼船 catamarans 双体船 dredger 挖泥船 boat 船

brig, brigantine 双桅船 canoe 小船,独木舟 caravel 快帆船 cargo boat 货船

coaster近海贸易货船 cod-fishing boat 捕鳕鱼船 whaler 捕鲸船 collier 运煤船 battleship 战船 shallop 小型战船

coastguard cutter, coastguard vessel 巡逻艇,缉私艇

revenue cutter 缉私船 patrol boat 巡逻艇 minelayer 布雷艇 minesweeper 扫雷艇 torpedo boat 鱼雷艇 frigate 轻护航舰 gunboat 炮舰

submarine 潜水艇 destroyer 驱逐舰 corvette 轻巡洋舰 cruiser 巡洋舰

aircraft carrier 航空母舰 ferry, ferryboat 渡船,渡轮 fishing boat 渔船 freighter 货船 galleon 大型帆船 galley 大划桨船 hovercraft 气垫船 icebreaker 破冰船 launch 艇

lifeboat 救生艇 lighter 驳船

liner, ocean liner 远洋班轮

merchant ship, merchantman 商船 motorboat 摩托艇

outboard 尾部装有马达的小艇 paddle steamer, paddle boat 明轮船passenger boat 客船 piragua, pirogue 独木舟 raft 木筏

rowing boat 划艇

sailing boat, sailing ship 帆船 schooner 纵帆船 ship 船 skiff 小艇 sloop 单桅船

steamer, steamship 汽轮 tanker 油轮

篇3:船舶专业英语

一高职英语能力本位教学模式研究背景

能力本位教育 (CBE, 即Competence-Based Education) 是20世纪60年代发展起来的世界范围内的教育培训思潮, 是一种国际上流行的职业教育体系, 也是目前国际上职业教育改革的发展方向, 在20世纪80年代迅速发展, 对职业教育和培训产生着深远的影响。能力本位重视以教育对象的能力为基础, 强化学生职业技能为主要教学内容, 以培养学生职业素质和岗位技能为目标, 培养学生为社会服务的能力。CBE理论引导者职业教育, 项目化教学起源于美国, 盛行于德国, 项目化教学是以建构主义学习理论为基础的探究性学习模式。项目教学与建构主义学习理论均强调活动建构性, 强调师生应在合作中学习, 在不断解决疑难问题中完成对知识的意义建构。近些年来, 项目化教学在我国发展迅速, 项目化教学改革在很多职业院校正大力推广。

近年来, 我国的许多高职院校开展了基于能力本位导向下的高职英语项目化教学实践, 取得了一定的成绩。然而, 基于能力导向下的高职专业英语项目化教学仍然存在很多问题: (1) 项目化教学的实施者是教师, 很多学校并没有重视教师的培养和管理, 导致项目改革空有虚名。 (2) 项目化教学缺乏合理、科学的规划与设想。 (3) 项目化教学中工学结合的深度不够, 大多只限于理论层面。 (4) 项目化教学中学生的专业技能与英语能力未能很好结合, 学生的英语综合能力未得到明显提高, 能力本位教育未能充分体现。

虽然基于能力本位高职英语项目化教学不够成熟与完善, 但构建新的教学体系, 探索新的教学方法仍然是高职英语教学的核心目标。并且, 经过多年的探索, 基于能力本位的高职英语项目化越来越受到各高职院校的重视。如何改革高职基础英语及专业英语教学模式, 能力本位的教育为此指明了方向, 项目化教学模式为此提供了一种实现的途径。

二船舶高职院项目化英语教学模式研究

1. 船舶高职院专业英语教学改革背景研究

第一, 政策导向。高职教育培养目标要求高职英语教学应该融入职业元素, 体现职业教育的本质特征。

第二, 经过紧张的高考进入大学后, 不少学生产生了喘口气、歇歇脚、放松的想法。因此, 学习热情下降, 学习注意力不集中, 课堂上不专心听讲, 看小说, 睡觉, 不积极思考, 另外高职院校学生英语基础薄弱, 成绩太低, “基础差”成为学生不学习的借口。

第三, 高职院校学生就业质量低。

第四, 高职院学生英语应用能力远远低于用人单位要求。

2. 高职院校英语课程教学现状及出现的问题

第一, 高职院校英语教学未能充分体现高职教育的培养目标及本质特征, 偏离职业能力要求, 不能满足社会与职场需求, 学生不能有效利用所学知识, 英语作为交流工具没有得到发挥。

第二, 课程设置不合理。重视EGP课程, ESP课程缺失。EGP与ESP不能合理过渡与衔接。主要表现为课程设置忽视社会需求变化, 与社会脱节, 缺乏社会指导。据调查统计, 41%的高职院校至今仍未开设专业英语课程, 有些院校即便开设了专业英语课程, 也普遍存在基础英语与行业英语不能合理过渡与衔接等问题。

3. 体现职业教育特色的船舶高职院专业英语课程教学改革实践研究

第一, 高职英语课程的教学目标、教学要求及教学内容重新定位, 目的在于培养学生职场环境下的语言交际能力。

第二, 教学模式的改革。应体现以学生为中心, 融“教、学、做”为一体的教学理念, 注重培养学生的语言应用能力。

第三, 教学评估的改革。根据职业院校的特点应结合形成性评估和终结性评估。这两种评估相互结合, 以评价学生实际应用英语的能力为目标。

第四, 渤海船舶职业学院高职英语课程体系构建。第一、二学期:基础英语, 目的在于帮助学生打好语言基础。第三学期, 行业英语。目的在于处理好船舶专业理论知识与英语表达的衔接;处理好基础英语与专业英语的课程衔接。第四学期:专业英语, 目的在于了解各行业知识, 发展语言技能。听说为主的《朗文交互英语》为职场英语, 贯穿第一至第四学期, 目的在于在真实语境中发展学生的听说技能。

三船舶高职院专业英语项目化教学模式研究的内容

1. 基于能力本位的高职英语教学模式背景研究

第一, 国际上高等职业教育大体上都实行能力本位 (Competency-Based) 的教学模式, 研究证明, 能力本位的教育思想是高等职业教育的改革发展方向。

第二, 传统的高职英语教学模式与教学要求和形势发展不相适应的趋势, 必须进行改革。传统的高职英语教学模式只注重基础, 忽视行业英语与专业英语教学, 导致学生的综合能力与职业能力较低。

2. 专业英语课程设置与教学内容研究

第一, 选用实用性和应用性强的基础英语教材, 注重学生基础知识, 为专业学习打下基础。

第二, 深入企业, 进行调研, 编写侧重实践应用能力的行业英语与专业英语教材。

第三, 建设局域网络听说自主学习环境, 开发“视听说”自主学习模式。

第四, 建立基础英语+职场英语+行业英语+专业英语的课程体系。

3. 专业英语项目化教学模式理论研究

专业英语项目化教学模式打破以知识传授为特征的传统高职英语教学模式, 探索以职业目标为任务导向、以职场交际应用为项目模块、以工作过程为主线的船舶工程专业英语教学新模式, 针对职业岗位英语能力需求, 使“职业性”成为英语教学改革核心, 融入行业要素、实践要素和岗位要素。让学生在完成项目任务的过程中, 构建行业英语知识, 提高英语应用能力和综合职业素质。

4. 专业英语项目化教学模式实践探索研究

第一, 与传统的英语教学模式不同, 以船舶专业为背景, 以学生为主体, 通过创设工作情境、模拟真实职场环境, 将学生分成小组, 采取项目化教学模式。

第二, 确定专业英语教学项目模块内容。根据岗位需求, 基础英语、行业英语和专业英语分为若干个教学项目。如将专业英语中的船舶对话、船舶资料翻译、船舶介绍等为教学项目, 让学生在模拟的工作环境中学习, 在教师的指导下, 直接参与教学。

第三, 确定专业英语项目化教学模式。根据船舶岗位特色, 分为基础理论知识、实训操练和职业岗位实践三个层次, 构成立体化英语课程体系。

第四, 利用实训基地, 加强实践教学环节。

5. 专业英语项目化教学模式改革策略研究

第一, 项目化教学模式, 教师是关键。英语教师需要具备相应的英语工作岗位能力和经验, 积极创造条件, 与行业、企业合作打造“双师结构”教学团队, 鼓励教师假期到企业挂职锻炼。

第二, 明确教学目标制定、教学计划设置、单元方案设计, 更新教学观念, 整合课程内容体系。

第三, 构建新的教学评价体系, 将实训操练和职业岗位实践评价纳入到最终的成绩评定, 建立多元化的评价体系。

四船舶高职院专业英语项目化教学模式研究的目标

高职英语教学模式研究应紧紧围绕《高职高专教育英语课程教学教学要求》、高职教育理念以及高职船舶工程专业英语人才培养方案, 以职业目标为导向, 以职业能力为本位, 以岗位需求和职业标准为依据, 培养学生的综合职业素质。渤海船舶职业学院专业英语项目化教学预期达到以下目标: (1) 以职业目标为导向设定课程内容, 尝试应用校企合作、工学结合的人才培养机制。 (2) 确立项目化教学模块内容。 (3) 以项目化教学为核心优化教学方法, 探索适合专业英语的教学方法。 (4) 以项目化教学为核心, 尽可能使用多媒体教室、语音室, 并探索网络环境下外语的“视听说”自主学习模式。 (5) 以项目化教学为平台, 培养一支结构合理的专业英语教师。目前的英语教师很难胜任专业性很强的专业英语教学, 对这些教师进行相关专业知识培训相当必要。 (6) 提高学生行业英语应用能力和综合职业素质, 增强学生就业竞争力。

五船舶专业外语师资队伍建设研究

教师素质与能力是专业英语课程教学成功与否的重要因素, 教学理念的更新是促使教学方法和教学手段改革的保证。教师是专业英语教学改革的主体, 也是改革成败的关键。目前, 渤海船舶职业学院的专业英语教师由两部分组成: (1) 基础英语教师, 他们英语基础扎实, 但缺乏专业知识; (2) 专业课教师, 他们专业知识牢固, 但在英语基础知识部分欠缺。因此, 专业外语教师队伍的建设极为重要, 为了培养学生在职场中灵活运用英语的能力, 英语教师必须具有扎实的英语功底和良好的专业知识和丰富的职业实践经验。学校应积极创造条件, 与行业、企业合作打造“双师结构”教学团队, 鼓励教师假期到企业挂职锻炼。

总之, 渤海船舶职业学院根据专业特点, 以学生的职业需求和发展为本位, 制定不同的教学要求, 为学生提供多种学习选择, 充分体现分类指导、因材施教的原则。贯彻以职业理念为导向, 以专业人才培养目标为依据, 以提升学生英语应用能力为目标, 以听说先行为手段, 构建职场基础英语+行业英语的课程体系, 提升学生就业竞争力和可持续发展的能力, 践行专业教学改革。通过专业英语教学改革, 使得学生真正掌握英语, 熟练应用英语, 处理好船舶专业理论知识和英语表达的衔接, 为他们提升就业竞争力及今后的可持续发展打下良好的基础。

参考文献

[1]教育部高等教育司.高职高专教育英语课程教学基本要求[M].北京:高等教育出版社, 2000

[2]雷术海.基于工作过程的高职英语课程项目化教学研究[J].张家口职业技术学院学报, 2009 (2) :47~48

[3]秦美娟.以能力本位教育思想设计高职英语课程体系[J].武汉船舶职业技术学院学报, 2010 (3) :92~93

[4]李海彦、刘珍龙.基于职业目标的高职英语教学模式研究——以机电英语项目化教学为例[J].继续教育研究, 2013 (3) :125~126

篇4:卓越船舶专业课程教学模式探讨

[关键词]船舶专业卓越计划教学改革

[中图分类号]G642.0[文献标识码]A[文章编号]2095-3437(2013)08-0111-02

卓越船舶工程师不仅要掌握扎实的船舶与海洋工程理论知识,还要初步具有丰富的工程设计、施工建造以及管理运营等方面的工程实践经验。理论与实践紧密结合的要求,给各门专业课程的授课老师提出了新的挑战。教师应该根据课程性质,适当增加案例讨论、课程设计以及企业实习的比重,尤其是增加短期企业实习与案例讨论等。在教学方法方面,要鼓励自主探究与自主发现的学习方式,使学生自己去体会学习,激发其对所学内容的兴趣。卓越型教学以理论学习、工程实践、再理论学习的模式,来培养学生的学习意识与探索精神,这种教学模式可以培养出符合市场需求的学生。让他们具有足够的“本领”去准备迎接毕业后的学习和工作。

一、卓越工程师培养计划的概述

从2010年6月开始,教育部先后批准462个试点班加入“卓越工程师教育培养计划” ,拟通过在试点高校及专业实施卓越计划,探索建立具有中国特色的工程教育模式,以迎合我国对人才的需求,其中船舶专业有5所高校。据麦肯锡季刊的一项分析报告指出,在中国160万名青年工程师中,只有16万名能胜任跨国公司的工作,能达到跨国公司用人标准的合格毕业生比例不到工科毕业生的10%,与印度的25%、马来西亚的35%、波兰的50%、比利时的80%以及其他发达国家差距甚大。为此,教育部推出卓越工程师教育培养计划,坚持面向工业界、面向世界、面向未来培养卓越工程师后备人才。上海海事大学船舶与海洋工程在与大型国企进行“3+1”联合培养教育的同时,正在积极实施教育部的卓越船舶工程师培养。各门课程均有针对性进行了卓越型教学的改革。下文主要针对船体结构与制图的卓越教学改革实践与所遇问题进行探讨。

二、船体结构与制图卓越型教学改革实践

为了使学生更好地掌握船体结构与制图相关知识,提高学生分析问题、解决问题的能力,我们在该课程中运用了卓越型教学模式,从培养目的、培养方式、教学内容等方面进行转变,进而推动学生学习方式的改变,提高他们理论与实践相结合的能力,将来成为一名合格的卓越工程师。

(一)培养目的的转变

在卓越型教学中,大学生的身份理应由最初的理论学习者逐步成为一个既学习理论又学习工程实践的卓越工程师。在这个过程中,学生不仅能够掌握课程知识,还能够理解理论与实践之间的联系,进而解决实际工程中碰到的问题。在与这些未来的卓越工程师的交流中,教师也应更新自己的知识视野、扩展自己的实践经验,实现更好的理论与实践的结合。

船体结构与制图课程的教学目的是让学生掌握船体结构的知识与船体制图的基本技能,并在此基础上进行实际船体结构基本图样的绘制和识读。要达到这一目的,必须要具备以下两方面的知识,一是要透彻地掌握工程实际中各种船体的构造与实际生产部门所要求的船体结构图样的基本组成,二是能够熟练利用现代制图工具进行船体图纸的绘制。 船舶专业前期课程船舶与海洋工程概论和画法几何与机械制图的开设可以很好地帮助本课程教学目的的改变。

(二)培养方式的转变

卓越型教学应该强调实践教学与课堂教学之间的平等关系,突破以课堂教学为中心的传统观念。课堂教学和实践教学的结合,避免了只重理论不重实践的满堂灌、一言堂,理论严重脱节或滞后于实践的传统教学方法。这样,学生通过理论学习、实践学习、理论再学习这一螺旋上升过程既学到了理论知识也学到了实践应用,从而达到了学以致用的目的,也更容易培养学生在实践中学习,在实践中探索的卓越工程师精神。针对理论与实践融合难的问题,分析其原因,是教学中只重理论不重实践或基本无实践造成的,所以教师在教学方式上要为理论与实践的融合创造一切可能的机会。

在船体结构与制图授课过程中,授课教师首先在备课期间针对“船体结构”部分在船厂进行了大量相关图片与音像的摄制,然后在授课时首先让学生观看相关音像资料,引导学生从船体结构的知识出发,自己提出问题发现问题,然后再讲述理论知识,最后再一次讨论学习所摄制的各种资料。在“船体制图”部分,首先让学生读识收集到的部分图纸,然后带着问题讲授制图的相关理论内容,最后进行相关图纸的绘制。在课程中或课程结束后,学生集中进入船厂和设计院进行实践学习。上述教学方式,可以帮助学生在学习过程中不断地思考,不断地理论联系实际,进而提高了学生解决具体问题的能力,也可以更好地促使他们形成积极的学习态度和良好的学习策略。

(三)教学内容的转变

随着船舶与海洋工程技术的进步,新结构、新材料、新工艺,特别是计算机技术在船舶设计与制造上的广泛应用,以及船舶行业规范标准的陆续修订更新,专业课程的授课内容也要求及时进行相应更新。教师也应及时更新自己的知识、扩展自己的实践,实现更好的理论与实践的结合。

在船体结构与制图的授课过程中,课程的教学内容不断更新,在原有理论知识的基础上,增添了大量实践性的教学内容,力求把传授理论知识和培养实践能力结合起来。例如:在船体制图方面,将线型的绘制、图纸的选择、绘图比例的确定等方面的内容弱化,重点介绍图样的组成内容以及对图纸的识读和绘制方法上。同时不断更新船舶规范方面新增的相关内容,尽可能让学生学到最先进的船体结构与制图知识。

三、船体结构与制图卓越型教学实施过程中面临的困难

“船体结构与制图”是船舶与海洋工程本科生的一门重要的专业课,实践性较强,涉及船体结构构件的基本知识,船体结构布置的基本内容和船体制图的基本规则与制图的基本方法,以及制图工具CAD的初步应用等。课程内容是学生日后从事船舶制造和船舶设计的基础也是其他课程的基础。

船体结构与制图卓越型教学模式在上海海事大学船舶与海洋工程专业试行以来,教学效果良好,但在具体的实施过程中存在如下几点困难。

(一)理论教学与企业实践融合难度大

卓越型教学模式引领学生在学习理论的同时要与实践紧密结合,理论教学要与实践教学环环相扣。每节课老师讲授理论知识之后,学生应进入企业进行参观实习,或者进入企业发现问题之后老师针对所发现的问题进行理论简答,然后再进入下一个内容的学习与讲授过程。在此基础上,结合当前最新的造船工艺和设计理念,教会学生如何把所学的知识应用到实际中去。但同学们进入企业实习的内容往往受到企业工程进度和安全因素的制约,实践内容难以覆盖理论知识。此外,部分同学进入企业前没有对理论中存在的问题进行分析总结,所以很难在较短的时间内将理论与实践连接在一起,更难以在企业中发现问题,进而将问题带到课堂,形成理论与实践的有机结合。

(二)实践与教学不能交叉安排,理论与实践结合的效果降低

卓越型教学模式引导学生走一条理论学习、工程实践、理论再学习的螺旋式学习道路,课堂教学的工作不仅是传授知识而且也要让学生发现问题甚至让学生解决问题,而企业实践也不是一项独立的教学内容,是带着问题的实践,是发现问题的实践,是巩固理论知识的实践。但现在所有学校往往都将实践实习内容集中安排,不能零散地穿插在理论教学中,在实践实习过程中很多学生可能已将课堂讲授内容遗忘,实习结束后本门课程的理论学习也随之结束。所以实践与教学无法交叉安排的结果将降低理论与实践相结合的效果。

四、结语

卓越型教学模式提倡学生理论学习与实践应用的结合,以培养既懂理论又熟悉实践的卓越工程师为目的。在卓越型教学模式的实施过程中会遇到困难、会走弯路,而且每门课程中理论与实践的结合点不同,理论与实践相结合的方法也不同,所以不同课程应设置相应的教学方法与教学内容,并且应该结合教学效果对教学方法和教学内容做相应的调整。总体来说,卓越型教学模式中理论与实践结合的精神应得到更多体现,在实践中学习,在学习中实践,是这一培养模式的核心。

[参考文献]

[1]教育部.卓越工程师教育培养计划[Z].2010.

[2] 教育部. 关于实施卓越工程师教育培养计划的若干意见[Z].2011.

[3]白正仙,刘学春。面向卓越工程师培养计划的本科钢结构课程教学改革探讨[J].探索与实践,2008,(4):231-232.

[4]万超嵇,春艳,管义锋,赵洪江. 船舶类高校“卓越工程师”培养计划的研究与进展[J].科技文汇,2010 ,( 10 ):36-37.

[责任编辑:碧瑶]

篇5:船舶与海洋工程专业英语

目录

Part 1.船舶与海洋工程英语

1.The Naval Architect…………………………………………….……….….....1 2.Definitions, Principal Dimensions……………………………….….………....3 3.Merchant ship Types………………………………………………..…………10 4.Ship Design…………………………………………………………………16 5.General Arrangement……………………………………………………....…20 6.Ship Lines……………………………………………………..…………...…25 7.Ship Equilibrium, Stability and Trim………………………………………..28 8.Estimating Power Requirements………………………………………….….33 9.Ship Motions, Maneuverability………………………………………………37 10.The Function of Ship Structural Components……………………………………….....40 11.Structural Design, Ship Stresses…………………………………………………….......43 12.Classification Societies…………………………………………………...…48 13.Shipyard, Organization, Layout…………………………………..….....…..53 14.Planning, From Contract to Working Plans……………………………...….56 15.Lines Plan and Fairing, Fabrication and Assembly………………………....58 16.Launching and Outfitting…………………………………………………....61 17.Sea Trials……………………………………………………………………64 18.Marine Engines………………………………………………………………………...66 19.Marine Electrical Equipment…………………………………………..……71 20.Unattended Machinery Spaces……………………………………….……..76 21.Mobile Drilling Platforms……………………………………………………………...81 22.Examples of Offshore Structures……………………………………….…..85 23.Oceanographic Submersibles…………………………………………….…91 24.Application of Engineering Economics to Ship Design……………..……..94 25.Computer Development and the Naval Architect………………………..…98 Part2.26.船舶英语实用词汇手册……………………………………………………………..101 27.船舶英语缩略语…………………………………………………………………...…129

Lesson One

The Naval Architect A naval architect asked to design a ship may receive his instructions in a form ranging from such simple requirements as ―an oil tanker to carry 100 000 tons deadweight at 15 knots‖ to a fully detailed specification of precisely planned requirements.He is usually required to prepare a design for a vessel that must carry a certain weight of cargo(or number of passengers)at a specified speed with particular reference to trade requirement;high-density cargoes, such as machinery, require little hold capacity, while the reverse is true for low-density cargoes, such as grain.Deadweight is defined as weight of cargo plus fuel and consumable stores, and lightweight as the weight of the hull, including machinery and equipment.The designer must choose dimensions such that the displacement of the vessel is equal to the sum of the dead weight and the lightweight tonnages.The fineness of the hull must be appropriate to the speed.The draft------which is governed by freeboard rules------enables the depth to be determined to a first approximation.After selecting tentative values of length, breadth, depth, draft, and displacement, the designer must achieve a weight balance.He must also select a moment balance because centres of gravity in both longitudinal and vertical directions must provide satisfactory trim and stability.Additionally, he must estimate the shaft horsepower required for the specified speed;this determines the weight of machinery.The strength of the hull must be adequate for the service intended, detailed scantlings(frame dimensions and plate thicknesses)can be obtained from the rules of the classification society.These scantings determine the requisite weight of hull steel.The vessel should possess satisfactory steering characteristics, freedom from troublesome vibration, and should comply with the many varied requirements of international regulations.Possessing an attractive appearance, the ship should have the minimum net register tonnage, the factor on which harbour and other dues are based.(The gross tonnage represents the volume of all closed-in spaces above the inner bottom.The net tonnage is the gross tonnage minus certain deductible spaces that do not produce revenue.Net tonnage can therefore be regarded as a measure of the earning capacity of the ship, hence its use as a basis for harbour and docking charges.)Passenger vessels must satisfy a standard of bulkhead subdivision that will ensure adequate stability under specified conditions if the hull is pierced accidentally or through collision.Compromise plays a considerable part in producing a satisfactory design.A naval architect must be a master of approximations.If the required design closely resembles that of a ship already built for which full information is available, the designer can calculate the effects of differences between this ship and the projected ship.If, however, this information is not available, he must first produce coefficients based upon experience and, after refining them, check the results by calculation.Training

There are four major requirements for a good naval architect.The first is a clear understanding of the fundamental principles of applied science, particularly those aspects of science that have direct application to ships------mathematics, physics, mechanics, fluid mechanics, materials, structural strength, stability, resistance, and propulsion.The second is a detailed knowledge of past and present practice in shipbuilding.The third is personal experience of accepted methods in the design, construction, and operation of ships;and the fourth, and perhaps most important, is an aptitude for tackling new technical problems and of devising practical solutions.The professional training of naval architects differs widely in the various maritime countries.Unimany universities and polytechnic schools;such academic training must be supplemented by practical experience in a shipyard.Trends in design The introduction of calculating machines and computers has facilitated the complex calculations required in naval architecture and has also introduced new concepts in design.There are many combinations of length, breadth, and draft that will give a required displacement.Electronic computers make it possible to prepare series of designs for a vessel to operate in a particular service and to assess the economic returns to the shipowner for each separate design.Such a procedure is best carried out as a joint exercise by owner and builder.As ships increase in size and cost, such combined technical and economic studies can be expected to become more common.(From ―Encyclopedia Britannica‖, Vol.16, 1980)

Technical terms

1.naval architect 造船工程(设计)师 32.scantling 结构(件)尺寸

naval architecture造船(工程)学 33.frame 肋骨 2.instruction 任务书、指导书 34.classification society 船级社 3.oil tanker 油轮 35.steering 操舵、驾驶 4.deadweight 载重量 36.vibration 振动 5.knot 节 37.net register tonnage 净登记吨位 6.specification 规格书,设计任务书 38.harbour 港口 7.vessel 船舶 39.dues 税收 8.cargo 货物 40.gross tonnage 总吨位 9.passenger 旅客 41.deductible space 扣除空间 10.trade 贸易 42.revenue 收入 11.machinery 机械、机器 43.docking 进坞 12.hold capacity 舱容 44.charge 费用、电荷 13.consumable store 消耗物品 45.bulkhead 舱壁 14.light weight 轻载重量、空船重量 46.subdivision分舱(隔)、细分 15.hull 船体 47.collision 碰撞 16.dimension 尺度、量纲、维(数)48.compromise 折衷、调和 17.displacement 排水量、位移、置换 49.coefficient 系数 18.tonnage 吨位 50.training 培训 19.fineness 纤瘦度 51.fluid mechanics 流体力学 20.draft 吃水 52.structural strength 结构强度 21.breadth 船宽 53.resistance 阻力 22.freeboard 干舷 54.propulsion 推进 23.rule 规范 55.shipbuilding 造船 24.tentative 试用(暂行)的 56.aptitude(特殊)才能,适应性 25.longitudinal direction 纵向 57.maritime 航运,海运 26.vertical direction 垂向 58.polytechnical school 工艺(科技)学校 27.trim 纵倾 59.academic 学术的 28.stability 稳性 60.shipyard 造船厂 29.shaft horse power 轴马力 61.electronic computer 电子计算机 30.strength 强度 62.owner 船主,物主 31.service 航区、服务 63.encyclop(a)edia 百科全书

Additional Terms and Expressions 1.the Chinese Society of Naval Architecture and Marine Engineering(CSNAME)中国造船工程学会

the Chinese Society of Navigation中国航海学会

“Shipbuilding of China‖ 中国造船 Ship Engineering 船舶工程

“Naval 安定Merchant Ships” 舰船知识

China State Shipbuilding Corporation(CSSC)中国船舶工业总公司

China offshore Platform Engineering Corporation(COPECO)中国海洋石油平台工程公司

Royal Institution of Naval Architects(RINA)英国皇家造船工程师学会

Society of Naval Architects and Marine Engineers(SNAME)美国造船师与轮机工程师协会

10.Principle of naval architecture 造船原理 11.ship statics(or statics of naval

architecture)造船静力学 12.ship dynamics 船舶动力学

13.ship resistance and propulsion 船舶阻力

和推进

14.ship rolling and pitching 船舶摇摆 15.ship manoeuvrability 船舶操纵性 16.ship construction 船舶结构

17.ship structural mechanics 船舶结构力学 18.ship strength and structural design 船舶

强度和结构设计

19.ship design 船舶设计

20.shipbuilding technology 造船工艺

21.marine(or ocean)engineering 海洋工程 2.3.4.5.6.7.8.9.Note to the Text

1.range from A to B 的意思为“从A到B的范围内”,翻译时,根据这个基本意思可以按汉语习惯译成中文。例:

Lathe sizes range from very little lathes with the length of the bed in several inches to very large ones turning a work many feet in length.车床有大有小,小的车床其车身只有几英寸,大的车床能车削数英尺长的工件。

2.Such that 可以认为是such a kind/value 等的缩写,意思为“这样的类别/值等……以至于……”。译成中文是,可根据具体情况加以意译。例:

The depth of the chain locker is such that the cable is easily stowed.锚链舱的深度应该使锚链容易存储。

Possessing an attractive appearance, the ship should have the minimum net register tonnage,the factor on which harbour and oyher dues are based.Possessing an attractive appearance现在分词短语,用作表示条件的状语,意译成“船舶除有一个漂亮的外形……”。一般说,如分词短语谓语句首,通常表示时间、条件、原因等。

The factor on which…are based中的the factor是前面the minimum net register tonnage的铜谓语,而on which…are based是定语从句,修饰the factor。

4.Electronic computers make it possible to prepare series id designs for a vessel to operate in a particular service and to assess the economic returns to the shipowner for each separate design.句中的it是形式宾语,实际宾语为不定式短语 to prepare series of designs …和to assess the economic returns …

Lesson Two

Definitions, Principal Dimensions Before studying in detail the various technical branches of naval architecture it is important to define chapters.The purpose of this chapter is to explain these terms and to familiarise the reader with them.In the first place the dimensions by which the size of a ship is measured will be considered;they are referred to as ‗principal dimensions‘.The ship, like any solid body, requires three dimensions to define its size, and these are a length, a breadth and a depth.Each of these will be considered in turn.Principal dimensions Length There are various ways of defining the length of a ship, but first the length between perpendiculars will be considered.The length between perpendiculars is the distance measured parallel to the base at the level of the summer load waterline from the after perpendicular to the forward perpendicular.The after perpendicular is taken as the after side of the rudder post where there is such a post, and the forward perpendicular is the vertical line drawn through the intersection of the stem with summer load waterline.In ships where there is no rudder post the after perpendicular is taken as the line passing through the centre line of the rudder pintals.The perpendiculars and the length between perpendiculars are shown in Figure 1.The length between perpendiculars(LBP)is used for calculation purposes as will be seen later, but it will be obvious from Figure 1 that this does not represent the greatest length of the ship.For many purposes, such as the docking of a ship, it is necessary to know what the greatest length of the ship is.This length is known as the length of the extreme point at the after end to a similar point at the forward end.This can be clearly seen by referring again to Figure 1.In most ships the length overall will exceed by a considerable amount the length between perpendiculars.The excess will include the overhang of the stern and also that of the stem where the stem is raked forward.In modern ships having large bulbous bows the length overall LOA may have to be measured to the extreme point of the bulb.A third length which is often used, particularly when dealing with ship resistance, is the length on the waterline LWL.This is the distance measured on the waterline at which the ship is floating from the intersection of the stern with the waterline to the length is not a fixed quantity for a particular ship, as it will depend upon the waterline at which the ship is floating and upon the trim of the ship.This length is also shown in Figure 1.6 Breadth The mid point of the length between perpendiculars is called ‗amidships‘and the ship is usually broadest at this point.The breadth is measured at this position and the breadth most commonly used is called the ‗breadth moulded‘.It may be defined simply as the distance from the inside of plating on one side to a similar point on the other side measured at the broadest part of the ship.As is the case in the length between perpendiculars, the breadth moulded dose not represent the greatest breadth the breadth extreme is required(see Figure 2).In many ships the breadth extreme is the breadth moulded plus the thickness of the shell plating where the strakes of shell plating were overlapped the breadth extreme was equal to the breadth moulded plus four thicknesses of shell plating, but in the case of modern welded ships the extra breadth consists of two thicknesses of shell plating only.The breadth extreme may be much greater than this in some ships, since it is the distance from the extreme overhang on one side of the ship to a similar point on the other side.This distance would include the overhang of decks, a feature which is sometimes found in passenger ships in order to provide additional deck area.It would be measured over fenders, which are sometimes fitted to ships such as cross channel vessels which have to operate in and out of port under their own power and have fenders provided to protect the sides of the ships when coming alongside quays.Depth The third principal dimension is depth, which varies along the length of the ship but is usually measured ant amidships.This depth is known as the ‗depth moulded and is measured from the underside of the plating of the deck at side amidships to the base line.It is shown in Figure 2(a).It is sometimes quoted as a ‗depth moulded to upper deck‘ or ‗depth moulded to second deck‘, etc.Where no deck is specified it can be taken the depth is measured to the uppermost continuous deck.In some modern ships there is a rounded gunwale as shown in Figure 2(b).In such cases the depth moulded is measured from the intersection of the deck line continued with the breadth moulded line.Other features

The three principal dimensions give a general idea of the size of a ship but there are several other features which have to be considered and which could be different in two ships having the same length, breadth and depth.The more important of these will now be defined.Sheer Sheer is the height of the deck at side above a line drawn parallel to the base and tangent to the length of the ship and is usually greatest at the ends.In modern ships the deck line at side often has a variety of shapes: it may be flat with zero sheer over some distance on either side of amidships and then rise as a straight line towards the ends;on the other hand there may be no sheer at all on the deck, which will then be parallel to the base over the entire length.In older ships the deck at side line was parabolic in profile and the sheer was quoted as its value on the forward and after perpendiculars as shown in Figure 1.So called ‗standard‘ sheer was given by the formulae:

Sheer forward(in)=0.2Lft+20 Sheer aft

(in)=0.1Lft+10 These two formulae in terms of metric units would give:

Sheer forward

(cm)=1.666Lm+50.8 Sheer aft

(cm)=0.833Lm+25.4 It will be seen that the sheer forward is twice as much as the sheer aft in these standard formulae.It was often the case, however, that considerable variation was made from these standard values.Sometimes the sheer forward was increased while the sheer after was reduced.Occasionally the lowest point of the upper deck was some distance aft of amidships and sometimes departures were made from the parabolic sheer profile.The value of sheer and particularly the sheer forward was to increase the height of the deck above water(the ‗height of platform‘ as it was called)and this helped to prevent water being shipped when the vessel was moving through rough sea.The reason for the abolition of sheer in some modern ships is that their depths are so great that additional height of the deck above water at the fore end is unnecessary from a seakeeping point of view.Deletion of sheer also tends to make the ship easier to construct, but on the other hand it could be said that the appearance of the ship suffers in consequence.Camber Camber or round of beam is beam is defined as the rise of the deck of the ship in going from the side to the centre as shown in Figure 3(a).The camber curve used to be parabolic but here again often nowadays straight line camber curves are used or there may be no camber at all on decks.Camber is useful on the weather deck of a ship from a drainage point of view, but this may not be very important since the ship is very rarely upright and at rest.Often, if the weather deck of a ship is cambered, the lower decks particularly in passenger ships may have no camber at all, as this makes for horizontal decks in accommodation which is an advantage.Camber is usually stated as its value on the moulded breadth of the ship and standard camber was taken as one-fiftieth of the breadth.The camber on the deck diminishes towards the ends of the ship as the deck breadths become smaller.Bilge radius An outline of the midship section of a ship is shown in Figure 3(a).In many ‗full‘ cargo ships the section is virtually a rectangle with the lower corners rounded off.This part of the section is referred to as the ‗bilge‘ and the shape is often circular at this position.The radius of the circular arc forming the bilge is called the ‗bilge radius‘.Some designers prefer to make the section some curve other than a circle in way of the bilge.The curve would have a radius of curvature which increases as it approaches the straight parts of the section with which it has to link up.Rise of floor The bottom of a ship at amidships is usually flat but is not necessarily horizontal.If the line of the flat bottom is continued outwards it will intersect the breadth moulded line as shown in Figure 3(a).The height of this intersection above base is called the ‗rise of floor ‘.The rise of floor is very much dependent on the ship form.In ships of full form such as cargo ships the rise of floor may only be a few centimeters or may be eliminated altogether.In fine form ships much bigger rise of floor would be adopted in association with a larger bilge radius.Flat of keel

A feature which was common in the days of riveted ships what was known as ‗flat of keel ‘ or ‗flat of bottom ‘.Where there is no rise of floor, of course, the bottom is flat from the centre line to the point where the curve of the bilge starts.If there was a rise of floor it was customary for the line of the bottom to intersect the base line some distance from the centre line so that on either side of the centre line there was a small portion of the bottom which was horizontal, as shown in Figure 3(a).this was known as the ‗flat of bottom‘ and its value lay in the fact that a rightangle connection could be made between the flat plate keel and the vertical centre girder and this connection could be accomplished without having to bevel the connecting angle bars.Tumble home Another feature of the midship section of a ship which was at one time quite common but has now almost completely disappeared is what was called ‗tumble home‘.This is the amount which the side of the ship falls in from the breadth moulded line, as shown in Figure 3(b).Tumble home was a usual feature in sailing ships and often appeared in steel merchant ships before World War II.Ships of the present day rarely employ this feature since its elimination makes for ease of production and it is of doubtful value.Rake of stem In ships which have straight stems formed by a stem bar or a plate the inclination of the stem to the vertical is called the ‗rake‘.It may be defined either by the angle to the vertical or the distance between the intersection of the stem produced with the base line and the forward perpendicular.When ships have curved stems in profile, and especially where they also have bulbous bows, stem rake cannot be simply defined and it would be necessary to define the stem profile by a number of ordinates at different waterlines.In the case of a simple straight stem the stem line is usually joined up with the base line by a circular are, but sometimes a curve of some other form is used, in which case several ordinates are required to define its shape.Draught and trim The draught at which a ship floats is simply the distance from the bottom of the ship to the waterline.If the waterline is parallel to the keel the ship is said to be floating on an even keel, but if the waterline is not parallel then the ship is said to be trimmed.If the draught at the after end is greater than that at the fore end the ship is trimmed by the stern and if the converse is the case it is trimmed by the bow or by the head.The draught can be measured in two ways, either as a moulded draught which is the distance from the base line to the waterline, or as an extreme draught which is the distance from the bottom of the ship to the waterline.In the modern welded merchant ship to the waterline.In the modern welded merchant ship these two draughts differ only by one thickness of plating, but in certain types of ships where, say, a bar keel is fitted the extreme draught would be measured to the underside of the keel and may exceed the moulded draught of by 15-23cm(6-9in).It is important to know the draught of a ship, or how much water the ship is ‗drawing‘, and so that the draught may be readily obtained draught marks are cut in the stem and the stern.These are 6 in high with a space of 6in between the top of one figure and the bottom of the next one.When the water level is up to the bottom of a particular figure the draught in feet has the value of that figure.If metric units are used then the figures would probably be 10 cm high with a 10 cm spacing.In many large vessels the structure bends in the longitudinal vertical plane even in still water, with the result that the base line or the keel does not remain a straight line.The mean draught at which the vessel is floating is not then simply obtained by taking half the sum of the forward and after draughts.To ascertain how much the vessel is hogging or sagging a set of draught marks is placed amidships so that if da, d and df are the draughts at the after end amidships and the forward end respectively then

Hog or sag=

dadf-d

2When use is made of amidship draughts it is necessary to measure the draught on both sides of the ship and take the mean of the two readings in case the ship should be heeled one side or the other.The difference between the forward and after draughts of s ship is called the ‗trim‘, so that trim T=da-df, and as previously stated the ship will the said to be trimming by the stern or the bow according as the draught aft or the draught forward is in excess.For a given total load on the ship the draught will have its least value when the ship is on an even keel.This is an important point when a ship is navigating in restricted depth of water or when entering a dry dock.Usually a ship should be designed to float on an even keel in the fully loaded condition, and if this is not attainable a small trim by the stern is aimed at.Trim by the bow is not considered desirable and should be avoided as it reduces the ‗height of platform‘ forward and increases the liability to take water on board in rough seas.Freeboard Freeboard may be defined as the distance which the ship projects above the surface of the water or the distance measured downwards from the deck to the waterline.The freeboard to the weather deck, for example, will vary along the length of the ship because of the sheer of the deck and will also be affected by the trim, if any.Usually the freeboard will be a minimum at amidships and will increase towards the ends.Freeboard has an important influence on the seaworthiness of a ship.The greater the freeboard the greater is the above water volume, and this volume provides reserve buoyancy, assisting the ship to rise when it goes through waves.The above water volume can also help the ship to remain afloat in the event of damage.It will be seen later that freeboard has an important influence on the range of stability.Minimum freeboards are laid down for ships under International Law in the form of Load Line Regulations.(from ―Naval Architecture for Marine Engineers‖ by W.Muckle, 1975)

Technical Terms

1.principal dimension 主要尺度

2.naval architecture 造船(工程)学 3.造船工程(设计)师

4.length between perpendiculars(LBP)垂线间长 5.summer load waterline 夏季载重水线 6.forward/after perpendicular 首/尾垂线 7.rudder post 尾柱 8.stem 首柱

9.rudder pintle 舵销

10.length over all(LOA)总长

11.overhang(水线以上)悬伸部分 12.bulbous bow 球鼻艏

13.length on the waterline(LWL)水线长 14.amidship 船中

15.breath moulded 型宽 16.breath extreme 最大船宽 17.shell plating 船壳板 18.rivet 铆接 19.weld 焊接

20.strake(船壳板)列板 21.fender 护舷木

22.deck area 甲板面积(区域)23.cross channel vessel 海峡船 24.port 港口,船的左舷 25.side 舷侧(边)26.quay 码头

27.depth moulded 型深 28.plating of deck 甲板板 29.base line 基线 30.upper deck 上甲板 31.second deck 第二甲板

32.the uppermost continuous deck 最上层连续甲板 33.rounded gunwale 圆弧舷边顶部 34.moulded line 型线 35.sheer 舷弧 36.ends 船端

37.deck line at side 甲板边线 deck at side line 甲板边线 deck at side

甲板边线 38.profile

纵剖面(图),轮廓 39.sheer forward/aft 首/尾舷 40.platform

平台

41.rough sea

强浪,汹涛海面 42.seakeeping

耐波性

43.appearance

外形(观),出现 44.camber

梁拱

round of beam 梁拱 45.weather deck 露天甲板 46.drainage 排水

47.upright 正浮,直立 48.at rest 在静水中

49.accommodation 居住舱,适应 50.bilge radius

舭(部)半径 5.1 midship section 船中剖面 52.bilge

舭(部)53.rise of floor 船底升高 54.flat of keel 龙骨宽 55.flat plate keel平板龙骨 56.vertical center girder 中桁材

57.bevel

折射角,将直角钢改为斜角 58.connecting angle 联接角钢

59.tumble home 内倾 60.sailing ship 帆船

61.steel merchant ship 钢质商船 62.bar 棒,巴(气压单位)63.rake 倾斜

64.draught 吃水,草图,通风 65.even keel 等吃水,正浮

66.trimmed by the stern/bow 尾/首倾 67.moulded draught 型吃水 68.extreme draught 最大吃水 69.bar keel 棒龙骨 70.‖drawing‖“吃水” 71.draught marks 吃水标志 72.imperial unit 英制单位 73.metric unit 公制单位 74.spacing 间距 75.hogging 中拱 76.sagging 中垂 77.heel

横倾 78.dry dock 干船坞

79.fully loaded condition 满载标志 80.freeboard 干舷

81.seaworthiness 适航性

82.reserve buoyancy 储备浮力 83.range of stability 稳性范围

84.Load Line Regulations 载重线规范

Additional Terms and Expressions

1.form coefficients 船型系数 2.block coefficient 方型系数 3.prismatic coefficient 棱型系数

4.midship area coefficient 船中横剖面面积系数

5.waterplane area coefficient 水线面面积系数

6.vertical prismatic coefficient 竖向棱型系数 7.body section of U-form U形横剖面 8.V-shaped section V形横剖面

9.geometrically similar ships 几何相似船 10.base plane 基平面

11.center plane 中线面 12.midstation plane 中站面 13.moulded base line 基线 14.length breadth ratio 长度比 15.cruiser stern 巡洋舰型尾

16.principal coordinate planes 主坐标面 17.transom 方尾 18.soft chine 圆舭 19.hard chine 尖舭 20.counter 尾伸部 21.forefoot 首踵 22.aftfoot 尾踵

23.deadwood 尾鳍(呆木)

Notes to the Text

1.as will be seen later 和as is the case in the length between perpendiculars 中as 引出的从句为非限制性定语从句。关系代词as代替整个主句,并在从主语中作主语。as 也可在从句中作宾语,表语用。

2.A third length 序数字前面,一般用定冠词“the”,但当作者心目中对事物总数还不明确,或还不足以形成一个明确的序列时,序数字前面用不定冠词“a”。例:

will they have to modify the design a fourth time?(它们的设计究竟要修改多少次,心中无数,但依次下来已是第四次,所以用不定冠词“a”。)3.This is the distance measured on the waterline at which the ship is floating from the intersection of the stern with the waterline to the intersection of the stem with the waterline.这是一个符合据。其中at which the ship is floating 为定语从句,修饰the waterline.from the intersection of the stern(with the waterline为intersection 所要求的介词短语)to the intersection of the stern(with the waterline 为第二个intersection 所要求的介词短语)都属于介词短语,作状语用,说明测量的范围。

4.参见第一课注3.中的第二部分说明 5.quay 一般指与海岸平行的码头

pier 系指与海岸或呈直角面突出的码头

wharf 一般用于的码头

6.the deck line continued 和the stern produced 为过去分词作后置定语,分别修饰“the deck line 和the stern.都可译成“延长时”。

considerable variation was made from these standard values 和departures were made from the parabolic sheer profile 和(when)use is made of amidship draughts 这三句都属于主语的成分被位于动词隔离成两部分。这是英语句子结构平衡的需要中带有这种情况,阅读和翻译时需加以注意。

7.considerable variation was made from these standard values 和departures were made from the parabolic sheer profile 和(when)use is made of amidship draughts 这三句都属于主语的成分被位于动词隔离成两部分。这是英语句子结构平衡的需要中带有这种情况,阅读和翻译时需加以注意。Lesson Three

Merchant ship Types Break-bulk cargo ships

The inboard space in break bulk cargo ships is divided longitudinally by transverse bulkheads, spaced 40-70 ft apart, into a series of cargo compartments of approximately equal volume, generally seven for a ship of about 500 ft Lap.Vertically, the bulkheads are divided by one or two decks below the uppermost, continuous deck(main or strength deck).The space between the inner bottom and the lowest deck, called the hold, is limited to a height of about 18 ft(5.5m)to minimize damage to cargo through crushing.Usually the height of each space between decks termed between deck space)is 9-10ft(2.7-3.0m).In addition to the previously mentioned double-bottom tanks, the most break-bulk cargo ships have deep tanks used for fuel oil, water ballast, or liquid cargoes such as latex, coconut oil, or edible oils.The cargo is handled through large rectangular deck openings(hatches)over each cargo space.Mechanically operated hatch covers are used to close the openings.The hatch covers in the tween decks are strong enough to support cargo stowed on them.The topside hatch covers are watertight.The tween deck space is generally suitable for break-bulk or palletized cargo holds have had one hatch per deck, with of 35-50% the ship‘s breath and a length of 50-60% the hold length.The trend is toward widen hatches or multiple hatches abreast and often longer hatches, to increase cargo handling speed.A multiple hatch arrangement(triple hatch, for instance)is efficiently used for a partial load of containers stowed under deck.Break-bulk cargo handling between pier and ship is done usually by means of cargo booms installed on board.The booms are raised or lowered by adjustable wire rigging led from the mast or king post to the boom ends.A wire rope leads over sheaves from a winch to the outer end of each boom and terminates in a cargo hook.Cargo can be hoisted using one boom(customarily for very heavy loads of cargo, 10 tons or over)or for faster handling, by a pair of married booms, with one boom end over the hatch and the other over the pier.This cargo handling operation, called burtoning, is customary for loads up to 10 tons.Most break-bulk cargo ships fitted with booms have a pair of booms at each hatch end to expedite cargo handling.The cargo is often piled together in a large net which is emptied and returned for the next load.Packaged cargo of nearly uniform dimensions may be stacked on pallets which are hoisted aboard individually.The sling load is landed through the hatch opening.The pallets or nets are then unloaded, and each item is individually stowed by the hold gang.Any cargo stowed in the wings of the hold is manhandled unless it is on pallets and handled by a forklift truck.The use of forklift trucks is becoming common practice, and a number of these trucks may be carried on board if they are not available at cargo terminals.The amount of cargo which is manhandled onboard determines largely the ship turnaround and port expenses, and, the profitability of the transportation system.Most break-bulk cargo ships have provisions for a heavy lift boom of 30-100-metric ton capacity for occasional units of heavy cargo.An increasing number of break-bulk cargo ships are being fitted with revolving deck cargo cranes instead of masts, booms and winches.Container ships

Container ships are replacing the conventional break-bulk cargo ship in trade routes where rapid cargo handling is essential.Containers are weatherproof boxes(usually metal)strengthened withstand stacking and motion at sea.Containers are of standard size, the largest ones weighing up to about 30 metric tons when loaded.The use of standard containers facilitates ship-board stowage, land or waterway transportation, and rental or lease.A large container ship may be loaded or unloaded completely in about half a day, compared to several days for the same amount of cargo in break-bulk cargo ship.Generally, the shipper places the cargo in the container and,except for custom inspection, it is delivered unopened to the consignee.Highway trailers(most commonly), railroad cars, or barges transport containers to and from their land destination and are therefore apart of the same transportation system.For a given payload cargo capacity, container ships are larger and more costly to build than the traditional cargo ship, but both the cargo handling cost and the idle ship time in port are reduced considerably.Although in some ships containers are moved horizontally for loading and unloading, the predominant arrangement is that illustrated in Fig.1 where containers are stowed in vertical cells and moved vertically in and out of the vessel.Roll-on/Roll-off ships

With a broad interpretation all ships that are designed to handle cargo by rolling it on wheels can be considered under this heading.This would include trailer ships;sea trains(carrying railroad cars or entire carriers: ships carrying pallets handled by forklift trucks from and to shore;and so on, the following is a description of a ship of this type, which is intended primarily to operate as a trailer ship, although it may handle several types of wheeled vehicles.Roll-on/Roll-off ships require a high proportion of cubic capacity relative to the amount of cargo and are particularly suited to services with short runs and frequent loading and unloading.They need even shorter port time than container ships but their building cost is higher.Because fully loaded toll-on/roll-off ships can not carry enough cargo to immerse them deeply, their large freeboard allows the fitting of side ports above the waterline for handling of cargo on wheels by means of ramps.Usually, ships of this type have a transom stern(a square-shaped stern like that of a motorboat)fitted with doors for handling wheeled vehicles on an aft ramp.Roll-on/Roll-off ships have several decks, and the cargo is handled on wheels from the loading deck to other decks by elevators or sloping ramps.Both internal elevators and ramps occupy substantial volume in the ship.The need for clear decks, without interruption by transverse bulkheads, and tween decks for vehicle parking results in a unique structural arrangement.Barge-carrying ships

This type of ship represents a hold step in the trend toward cargo containerization and port time reductions.Cargo is carried in barges or lighters each weighing up to 1000 metric tons when loaded.The lighters are carried below and above deck and handled by gantry cranes or elevator platforms.These are among the fastest, largest, and costest ships for the carriage of general cargo.For their size, their payload capacity is less than that of the conventional break-bulk cargo ship.However, they can be loaded and unloaded much faster and with a considerable saving in man-hours.Because the lighters can be waterborne and operated as regular barges, these large ships can serve undeveloped ports advantageously.Using portable fixtures that can be erected quickly, barge-carrying ships can be adapted for the transport of varying amounts of standard containers in addition to or in plane of lighters.Bulk cargo ships

A large proportion of ocean transportation is effected by bulk cargo ships.Dry bulk cargo includes products such as iron ore, coal, limestone, grain, cement, bauxite gypsum, and sugar.Most oceangoing dry bulk carriers are loaded and unloaded using shore side installations.Many dry bulk carriers operating in the Great Lakes have shipboard equipment for the handling of cargo(self-unloaders), and an increasing number of oceangoing ships carrying this type of cargo are being fitted with self-unloading gear.By far the largest amount of liquid bulk cargo consists of petroleum products, but ocean transportation of other bulk liquid products is increasing in importance;for example, various chemicals, vegetable oils, molasses, latex, liquefied gases, molten sulfur, and even wine and fruit juices.Practically all liquid bulk carriers have pumps for unloading the cargo, usually have ship board pumps for unloading liquids.Practically all bulk carriers have the machinery compartment, crew accommodations, and conning stations located aft.An exception is the Great Lakes self-unloader with crew accommodations and bridge forward.The tendency in bulk carriers is toward larger ships, with speeds remaining about constant at moderate level(16-18 knots or 30-33 km/h for oceangoing ships, lower for Great Lakes vessels).The oceangoing ore carrier is characterized by a high double bottom and small volume of cargo hold because of the high density of the ore.Storing the cargo high in the ship decreases stability and prevents excessively quick rolling.The oceangoing combination bulk carrier permits low-cost transportation because of its flexibility.It is able to carry many types of bulk cargoes over a variety of sea lanes.This type of ship carries bulk cargoes, such as petroleum product, coal, grain, and ore.The double bottom in bulk carriers is shallow and the volume of cargo holds is large compared to the size of the ship.The tanker is the characteristic, and by far the most important, liquid bulk carrier both in numbers and tonnage.Tankers carry petroleum products almost exclusively.The very large tankers are used almost entirely for the transport of crude oil.A few tankers are built especially for the transportation of chemical products, and others are prepared for alter native loads of grain.Bulk liquid carriers, with standing, rectangular, cylindrical, or spherical cargo tanks separated from the hull, are used for the transportation of molten sulfur and liquefied gases, such as anhydrous ammonia and natural gas.Liquefied natural gas(LNG)is also carried in ships with membrane tanks, i.e., where a thin metallic linear is fitted into a tank composed of ship structural and load-bearing insulation.The transportation of molten surfur and liquefied gases requires special consideration regarding insulation and high structural soundness of cargo tanks, including the use of high grade, costly materials for their construction.(From ―McGraw-Hill Encyclopedia of Science and Technology‖, Vol.8.1982).Passenger-cargo ships

The accommodations for passengers in this type of ship are located to assure maximum comfort.Generally a passenger-cargo ship serves ports that have an appeal for the tourist trade and where rather special, high freight-rate cargo is handled.Because of the service needs of passengers, a ship of this type requires a much larger crew than a merchant ship of comparable size engaged exclusively in the carriage of cargo.The living accommodations for passengers consist of staterooms with 1-4 berths, each room with bath and toilet.A few rooms may be connected and suites may include a living room, dressing room, and even a private outdoor veranda.Public rooms for passenger use may include dining room, lounge, cocktail room, card and game room, library, shops, and swimming pool.Ships carrying more than 12 passengers must comply with the SOLAS regulations.These regulations deal with ship characteristics related to items such as the following:(1)lessening the risk of foundering or capsizing due to hull damage,(2)preventing the start and spread of fires aboard, and(3)increasing the possibility and safety of abandoning ship in emergencies.The ship in Fig.2 is an interesting example of a departure from the traditional break-bulk cargo ship in which cargo is handled almost exclusively by means of a ship board installation of masts and booms.This ship is provided with gantry cranes to handle containers, vehicles, and large pallets.The containers may be stored in cargo holds equipped with container cells or on deck.Large-size pallets and vehicles may be handled through side ports by means of an athwart-ship gear called a siporter.Wheeled vehicles can also be rolled on and off the ship through the side ports.Cargo may be carried to and from lower decks by cargo elevators, and, in addition, there are vertical conveyors for handling cargo such as bananas.The horizontal conveyors shown in the typical section receive cargo automatically, mostly on pallets, from the cargo elevators.This cargo is then stowed by manually controlled, battery operated pallet loaders.Cargo for the forward hold is handled by a 5-ton burtoning cargo gear and transferred to lower levels by a cargo elevator.(From ―McGraw – Hill Encyclopedia of Science and Technology‖, Vol.12, 1977)

Technical Terms

1.break-bulk cargo ship 件杂货船 26.king post 吊杆柱,起重柱 2.inboard 船内 27.wire rope 钢丝绳 3.compartment 舱室 28.sheave

滑轮 4.transverse bulkhead 横舱壁 29.winch 绞车 5.main deck 主甲板 30.cargo hook 吊货钩 6.strength deck 强力甲板 31.married booms 联合吊杆 7.inner bottom 内底 32.burtoning 双杆操作 8.hold(cargo hold)货舱 33.cargo handling 货物装卸 9.tween deck space 甲板间舱 34.packaged cargo 包装货 10.double bottom 双层底 35.pallet 货盘 11.deep tank 深舱 36.sling load

悬吊荷重 12.water ballast 水压载 37.hold gang 货舱理货组 13.latex 胶乳 38.wings 货舱两侧 14.coconut oil 椰子油 39.forklift truck 铲车 15.edible oil 食用油 40.terminal 码头,终端 17.hatch 舱口 41.turnaround 周转期 18.hatch cover 舱口盖 42.profitability 利益 19.palletized cargo 货盘运货 43.container ship 集装箱船 20.multiple hatch 多舱口 44.trade route 贸易航线 21.abreast 并排 45.weather proof 风雨密 22.container 集装箱 46.stacking 堆压 23.pier 码头 47.stowage 装载,贮藏 24.cargo boom 吊货杆 48.waterway 水路 25.wire rigging 钢索索具 49.rental 出租(费)50.lease 租借 51.shipper 货运主 52.custom 海关

53.consignee 收货人

54.highway trailer 公路拖车

55.payload 净载重量,有效载荷 56.cell 格栅,电池,元件 57.roll-on/roll-off ship 滚装船 58.heading 标题,航向 59.trailer ships 拖车运输船

60.sea trains ferry 海上火车渡船 61.truck 卡车 62.trailer 拖车

63.military vehicle carriers 军用车辆运输船

64.cubic capacity 舱容 65.ramp 跳板,坡道 66.transom stern 方尾

67.motor boat 机动艇,汽艇 68.clear deck 畅通甲板 69.parking 停车(场)

70.barge-carrying ship 载驳船 71.lighter 港驳船 72.barge 驳船

73.portable fixture 轻便固定装置

74.bulk cargo ship/bulk carrier 散装货船 75.dry bulk cargo 散装干货 76.limestone 石灰石 77.bauxite 矾土 78.gypsum 石膏

79.Great Lakes(美国)大湖 80.petroleum 石油

81.chemicals 化学制(产)品 82.molasses 糖浆

83.liquefied gas 液化气体 84.molten sulfur 熔态硫 85.conning station 驾驶室

86.ore hold 矿砂舱 87.空

88.engine room 机舱

89.liquid bulk carrier 液体散货船

90.combination bulk carrier 混装散货船 91.ocean-going ore carrier 远洋矿砂船 92.lane 航道(线)93.tanker 油船 94.crude oil 原油

95.anhydrous ammonia 无水氨 96.natural gas 天然气

97.passenger-cargo ship 客货船 98.tourist 旅游者 99.freight-rate 运费率

100.carriage 装(载)运,车辆 101.stateroom 客舱 102.suite 套间

103.living room 卧室 104.veranda 阳台 105.lounge 休息室

106.cocktail room 酒吧间

107.card and game room 牌戏娱乐室 108.foundering 沉没 109.capsizing 倾覆 110.abandoning 弃船 111.emergency 应急

112.installation 装置,运载工具 113.vehicle 车辆,运载工具 114.gantry crane 门式起重机 115.container cell 集装箱格栅 116.siporter 横向装卸机

117.rolled on and off 滚进滚出 118.side port 舷门

119.cargo elevator 运货升降机 120.conveyor 输送机

Additional Terms and Expressions 1.2.3.4.transport ship 运输船 general cargo ship 杂货船 liquid cargo ship 液货船 refrigerated ship 冷藏船

5.6.7.8.working ship 工程船

ocean development ship 海洋开发船 dredger 挖泥船

floating crane/derrick boat 起重船 9.salvage vessel 救捞船 10.submersible 潜水器 11.ice-breaker 破冰船 12.fisheries vessel 渔业船 13.trawler 拖网渔船

seine netter 围网渔船 14.harbour boat 港务船 15.supply ship 供应船 16.pleasure yacht 游艇

17.hydrofoil craft 水翼艇 18.air-cushion vehicle 气垫船

hovercraft 全垫升气垫船 19.catamaran 双体船 20.concrete ship 水泥船

21.fiberglass reinforced plastic boat 玻璃钢

Notes to the Text

1.unless 连接词,作“如果不”,“除非”解释,例如:

An object remain at rest or moves in a straight line unless a force acts upon it.一个物体如无外力作用,它将继续保持静止或作直线运动。

In this book the word is used in its original sense unless(it is)otherwise sated.本书内,这个词按其意采用,除非另有说明。2.“to and from 名词”或“from and to +名词” 后面的名词委前面两个介词公用,可译作“来回于(名词)之间”。

3.with a broad interpretation 具有广泛的意思

under this heading 属于这个范畴

4.barge 和lighter 一般都可以译作驳船,但barge 往往指货物经过较长距离运输到达某一目的地,故译作“驳船”,而lighter 旨在港口或近距离内起到装卸货物的联络作用,故译作“驳船”。

5.in additional to or in place of lighters 是in addition to lighters or in place of lighters 的省略形式,翻译成中文时,不一定能省略。

6.“by far +形容词(或副词)的最高级或比较及”具有“远远,非常,最„,或„得多”的意思。例:

by far the fastest 最快的

by far faster than A 远比A快(比A 快得多)

By far the most common type of fixed offshore structure in existence today is the template, or jacket, structure illustrated in Fig 1.1.现今最普遍采用的固定平台型式是图1.1所示的导管架平台。

7.the SOLAS regulations 系指国际海上人命安全公约规则,几乎所有海运国家都要遵守这些规则。其中的“SOLAS”为“International Convention for the Safety Of Life At Sea‖的缩写。Lesson Four

Ship Design

The design of a ship involves a selection of the features of form, size, proportions, and other factors which are open to choice, in combination with those features which are imposed by circumstances beyond the control of the design naval architect.Each new ship should do some things better than any other ship.This superiority must be developed in the evolution of the design, in the use of the most suitable materials, to the application of the best workmanship, and in the application of the basic fundamentals of naval architecture and marine engineering.As sips have increased in size and complexity, plans for building them have became mare detailed and more varied.The intensive research since the period just prior to World War 2 has brought about many technical advances in the design of ships.These changes have been brought about principally by the development of new welding techniques, developments in main propulsion plants, advances in electronics, and changes in materials and methods of construction.All ships have many requirements which are common to all types, whether they are naval, merchant, or special-purpose ships.The first of such requirements is that the ship must be capable of floating when carrying the load for which it was designed.A ship floats because as it sinks into the water it displaces an equal weight of water, and the pressure of the water produces an upward force, which is called the buoyancy force is equal to the weight of the water displaced by the ship and is called the displacement.Displacement is equal to the underwater volume of the ship multiplied by the density of the water in which it is gloating.When floating in still water, the weight of the ship, including everything it carries, is equal to the buoyancy or displacement.The weight of the ship itself is called the light weight.This weight includes the weight of the hull structure, fittings, equipment, propulsion machinery, piping and ventilation, cargo-handling equipment and other items required for the efficient operation of the ship.The load which the ship carries in addition to its own weight is called the deadweight.This includes cargo, passengers, crew and effects, stores, fresh water, feed water for the boilers incase of steam propelling machinery, and other weights which may be part of the ships international load.The sum of all these weights plus the lightweight of the ship gives the total displacement;that is

Displacement = lightweight + deadweight

One of the first things which a designer must do is to determine the weight and size of the ship and decide upon a suitable hull form to provide the necessary buoyancy to support the weight that has been chosen.Owner’s requirements

Ships are designed, built, and operated to fulfill, the requirements and limitations specified by the operator and owner.These owner‘s requirements denote the essential considerations which are to form the basis for the design.They may be generally stated as(1)a specified minimum deadweight carrying capacity,(2)a specified measurement tonnage limit,(3)a selected speed at sea, or a maximum speed on trial, and(4)maximum draft combined with other draft limitations.In addition to these general requirements, there may be a specified distance of travel without refueling and maximum fuel consumption per shaft horsepower hour limitation, as well as other items which will influence the basic design.Apart from these requirements, the ship owner expects the designer to provide a thoroughly efficient ship.Such expectations include(1)minimum displacement on a specified deadweight carrying capacity,(2)maximum cargo capacity on a minimum gross tonnage,(3)appropriate strength of construction,(4)the most efficient type of propelling machinery with due consideration to weight, initial cast, and cost of operation,(5)stability and general seaworthiness, and(6)the best loading and unloading facilities and ample accommodations for stowage.Design procedure

From the specified requirements, an approach is made to the selection of the dimensions, weight, and displacement of the new design.This is a detailed operation, but some rather direct approximations can be made to start the design process.This is usually done by analyzing data available from an existing ship which is closely similar.For example, the design displacement can be approximated from the similar ship‘s known deadweight of, say, 11790 tons and the known design displacement of 17600 tons.From these figures, a deadweight-displacement ratio of 0.67 is obtained.Thus, if the deadweight for the new design is, for example, 10000 tons, then the approximate design displacement will 10,000/0.67 or 15000 tons.This provides a starting point for the first set of length, beam, and draft dimensions, after due consideration to other requirements such as speed, stability, and strength.Beam is defined as the extreme breath of a ship at its widest part, while draft is the depth of the lowest part of the ship below the waterline.Length and speed These factors are related to the hull form, the propulsion machinery, and the propeller design.The hull form is the direct concern of the naval architect, which the propulsion machinery and propeller design are concern.The naval architect has considerable influence on the final decisions regarding the efficiency, weight, and size of the propeller, as both greatly influence the design of the hull form.Speed has an important influence on the length selected for the ship.The speed of the ship is related to the length in term of the ratio V/

L, where V is the speed in knots and L is the effective waterline length of the ship.As the speed-length ratio increases, the resistance of the ship increases.Therefore, in order to obtain an efficient hull form from a resistance standpoint, a suitable length must be selected for minimum resistance.Length in relation to the cross-sectional area of the underwater form(the prismatic coefficient), is also very important insofar as resistance is concerned.Fast ships require fine(slender)forms or relatively low fullness coefficients as compared with relatively slow ships which may be designed with fuller hull forms.Beam and stability

A ship must be stable under all normal conditions of loading and performance at sea.This means that when the ship is inclined from the vertical by some external force, it must return to the vertical when the external force is removed.Stability may be considered in the transverse or in the longitudinal direction.In surface ship, longitudinal stability is much less concern than transverse stability.Submarines, however, are concerned with longitudinal stability in the submerged condition.The transverse stability of a surface ship must be considered in two ways, first at all small angles of inclination, called initial stability, and second at large angles of inclination.Initial stability depends upon two factors,(1)the height of the center gravity of the ship above the base line and(2)the underwater form of the ship.The center of gravity is the point at which the total weight of the ship may be considered to be concentrated.The hull form factor governing stability depends on the beam B, draft T, and the proportions of the underwater and waterline shape.For a given location of the center of gravity, the initial stability of the ship is proportional to B2/T.Beam, therefore, is a primary factor in transeverse stability.At large angles of heel(transeverse inclination)freeboard is also an important factor.Freeboard is the amount the ship projects above the waterline of the ship to certain specified decks(in this case, to the weatherdeck to which the watertight sides extend).Freeboard affects both the size of the maximum righting arm and the range of the stability, that is the angle of inclination at which the ship would capsize if it were inclined beyond that angle.5 Depth an strength

A ship at sea is subjected to many forces because of the action of the waves, the motion of the ship, and the cargo and other weights, which are distributed throughout the length of the ship.These forces produces stresses in the structure, and the structure must be of suitable strength to withstand the action.The determination of the minimum amount of material required for adequate strength is essential to attaining the minimum weight of the hull.The types of structural stress experienced by a ship riding waves at sea are caused by the unequal distribution of the weight and buoyancy throughout the length of ship.The structure as a whole bends in a longitudinal plane, with the maximum bending stresses being found in the bottom and top of the hull girder.Therefore, depth is important because as it is increased, less material is required in the deck and bottom shell.However, there are limits which control the maximum depth in terms of practical arrangement and efficiency of design.(From ―McGraw-Hill Encyclopedia of science and Technology‖, Vol.12, 1982)

Technical Terms

1.form 船型,形状,格式 22.distance of travel 航行距离 2.proportion 尺度比,比例 23.refueling 添加燃料 3.workmanship 工艺质量 24.consumption 消耗 4.basic fundamentals 基本原理 25.initial cost 造价 5.marine engineering 轮机工程 26.cost of operation 营运成本 6.intensive 精致的 27.unloading facility 卸货设备 7.propulsion plants 推进装置 28.cross sectional area 横剖面面积 8.naval ship 军舰 29.fineness 纤瘦度 9.special-purpose ship 特殊用途船 30.prismatic coefficient 菱形系数 10.buoyancy 浮力 31.slender 瘦长(型)11.fittings 配/附件 32.beam 船宽 12.piping 管路 33.inclined 倾斜的 13.ventilation 通风 34.external force 外力 14.cargo-handing equipment 货物装卸装35.surface ship 水面船舶

置 36.submarine 潜水艇 15.crew and effects 船员及自身物品 37.submerged condition 潜水状态 16.stores 储藏物 38.initial stability 初稳性 17.fresh water 淡水 39.weather deck 楼天甲板 18.feed water 给水 40.righting arm 复原力臂 19.boiler 锅炉 41.capsize 倾复 20.measurement(吨位)丈量,测量 42.stress 应力 21.trial 试航,试验 43.unequal distribution 分布不相等 44.longitudinal plane 纵向平面 45.hull girder 船体梁

AdditionalTerms and Expressions

1.tentative design 方案设计 2.preliminary design 初步设计 3.technical design 技术设计 4.working design 施工设计 5.basic design 基本设计

6.conceptual design 概念设计 7.inquire design 咨询设计 8.contract design 合同设计 9.detailed design 详细设计 10.finished plan 完工图

11.hull specification 船体说明书 12.general specification 全船说明书 13.steel weight 钢料重量

14.outfit weight(木作)舾装重量 15.machinery weight 机械重量 16.weight curve重量曲线

17.weight estimation 重量估计

18.cargo capacity 货舱容积

19.bale cargo capacity 包装舱容积 20.bulk cargo capacity 散装货容积 21.bunker capacity 燃料舱容积 22.capacity curve 容积曲线 23.capacity plan 容量(积)图 24.stowage factor 积载系数

25.homogenuous cargo 均质货物 26.gross tonnage 总吨位 27.net tonnage 净吨位

28.tonnage capacity 量吨容积 29.tonnage certificate 吨位证书

30.displacement length ratio 排水量长度比 31.accommodation 居住舱室 32.ice strengthening 冰区加强 33.drawing office 制图室 34.drafting room 制图室

Notes to the Text 1.A ship floats because as it sinks into the water it displace an equal weight of water, and pressure of the water produces an upward force which is called buoyancy.这是一个复合句。

从because开始至句末均属原因状语从句,它本身也是一个复合句,包含有以下从句:

as it sinks into the water 为整个原因状语从句中的时间状语从句;

it displaces an equal weight of water, and pressure of the water produces an upward 为整个原因状语从句中的两个并列的主要句子;

which is called buoyancy 为定语从句,修饰an upward force.2.In addition to 除……以外(还包括……)

例:In addition to these general requirements, … 除了这些一般要求外,还有……

而在The load which the ship carries in addition to its own weight is called the deadweight中的in addition to 应理解成“外加在它本身重量上的”,故应译为“本身重量除外(不包括本身重量)。

3.插入语,相当于 for example.一般在口语中用得比较多。

4.注意 ―ton‖, ―tonne‖, 和 ―tonnage‖ 三个词的区别。ton和tonne一般用来表示船舶的排水量和载重量,指重量单位。其中ton可分long ton(英吨)和 short ton(美吨),而tonne为公吨;tonnage 是登记吨,表征船舶容积的一种单位。

5. …the angle of inclination at which the ship would capsize if it were inclined beyond that angle.从at 开始至句末是一定语从句,修饰angle, 而该从句本身又由一个带虚拟语气的主从复合句所构成。因为假设的条件不会发生,或发生的可能性非常小,所以主句和从句中的谓语动词都采用虚拟语气。

Lesson Five

General Arrangement

1.1 Definition The general arrangement of a ship can be defined as the assignment of spaces for all the required functions and equipment, properly coordinated for location and access.Four consecutive steps characterize general arrangement;namely, allocation of main spaces, setting individual space boundaries, choosing and locating equipment and furnishing within boundaries, and providing interrelated access.These steps progress from overall to detail considerations, although there is some overlapping.Generally, particular arrangement plans are prepared for conceptual, preliminary, contract, and working plan stages.The data for early stages come into first experience, and the degree of detail increases as the design progresses.It has often been said that ship design is inevitably a compromise between various conflicting requirements, and it is in formulation of the general arrangement that most of the compromises are made.Ship design requires a melding of many arts and sciences, and most of this melding occurs in the general arrangement.The designer considers the demands for all the functions and subfunctions of the ship, balances the relative types and importance of the demands, and attempts to arrive at an optimum coordinate relationship of the space assignments within the ship hull.The general arrangement, then, represents a summary or integration of information from other divisions and specialties in the ship design, to provide all the necessary functions of the ship in the most efficient and economical way from an overall viewpoint.The efficient operation of a ship depends upon the proper arrangement of each separate space and the most effective interrelationships between all spaces.It is important that the general arrangement be functionally and economically developed with respect to factors that affect both the construction and operation cost, especially the manpower required to operate the ship.Many other divisions of ship design provide the feed-in for the general arrangement, such as structure, hull engineering(hatch covers, cargo handling, etc), scientific(weights, stability, and lines), engineering(machinery, uptakes), and specifications.1.2 Function of ship

In this chapter, consideration of ship type is restricted to those whose function is to transport something for economic profit;in other words, commercial transportation.Such ship types may be subdivided in accordance with material to be transported;e.g., general cargo, bulk cargo, vehicles, passengers, etc.General cargo ships may further be subdivided in accordance with the form in which the general cargo is transported;e.g.break-bulk, containers, standardized pallets, roll-on/roll-off, etc.Bulk cargo ships may be subdivided into liquid bulk types and solid bulk types, or combinations of these, and, of course, may be further subdivided for specific liquids and solid bulks.Vehicle ships would include ferryboats and ships for the transoceanic delivery of automobiles, trucks, etc.Passengers can be carried in ships designed primarily for that purpose, as well as in any of the aforementioned types.Therefore, even after ship types are limited to those for Commercial transportation, they can have widely diverse functions.However, the common objective of the general arrangement in each case is to fulfill the function of the ship n the most economical manner;in other words develop a ship which will transport cargo at the least unit cost.This dual aspect of function cost is actually the force which has give rise to special ship types, many of which have been created in the last few years.The reason for this may be seen in a comparative annual cost break-bulk cargo ship fleet and a container ship fleet designed to carry the same cargo ,as estimated in ref[1].Conventional

Break-bulk

container

Fleer

Ship Fleet Capital……………………………………………………………..$2,370,000….$ 2,940,000 Operating…………………………………………………………….4,550,000

3,550,000 Cargo handing………………………………………………………22,900,000

4,920,000 Terminal allocation………………………………………………….1200,000

1,200,000 Overhead and allocations……………………………………………2,20,000

2200000 Total transportation cost …………………………………………….$33,220,000 $14,810,000 Cost per long ton of cargo transported………………………………$4,920

$2,190 It is the implication of such cost figures that gave rise to a rapid growth in the container ship type.Some such similar sets of cost figures, comparing different ways to accomplish the same function, explain the growth of any special ship type.The problems of general arrangement, then, are, associated with the function of the ship and generally fifer according to ship type.The arrangements of all types, however, have certain things in common.For example, the problems of accommodation and propulsion machinery arrangements are generally similar, although the different ship types impose different limitations.1.3

Ship as a system.In analyzing any tool or implement which has a functional-economic aspect, it is convenient to consider that tool as a system made up of a group of subsystems.By this approach, each subsystem may be analyzed separately, and its components and characteristics selected for optimum function and economics;then the subsystems may be combined to form the compatible system.Of course the subsystems must be compatible and the sum of their functions must equal the complete system function, just as the sum of their cists must equal the complete system costs.A ship which is a structural-mechanical tool or implement may be considered as a system for the transportation of goods or people ,across a body of water, from one marine terminal to another.The complete system is broken down into subsystems which generally must include, as a minimum, subsystems for:

 Enclosing volume for containing cargo and other contents of ship and providing buoyancy to support cargo and other weights(hull envelope). Providing structure for maintaining watertight integrity of enclosed volume and supporting cargo and other contents of ship against static and dynamic forces and primary strength of the hull girder(structure). Transporting cargo from pier to ship and stowing it aboard ship(cargo handling and stowage). Propelling ship at various speeds(machinery and control). Controlling direction of ship(steering). Housing and supporting human components of system(accommodations).Providing safety in event of accident(watertight subdivision, fire control, etc.).The general arrangement is largely developed by consideration of the requirement of each system, which are balanced, weighed, and combined into a complete system.However, the development of the general arrangement is not completely compatible with the system approach, because a general arrangement is a diagram of space and location, which may be minor aspects of certain subsystems.For example, some sub-subsystems occupy practically no space and do not appear on a general arrangement plan.Although this chapter will not go further with the system approach than is warranted by the subject of “general arrangement‖, it should be noted that each of the foregoing subsystems may be further broken down into second-degree subsystems(or sub-subsystems)and these in turn may be further broken down.The complete ship itself is, of course, a subsystem of larger system for the transportation of goods or people from any point on earth to any other point.1.4 The Problem and the approach

The first step in solving the general arrangement problem is locating the main spaces and their boundaries within the ship hull and superstructure.They are:

Cargo spaces

Machinery spaces

Crew, passenger, and associated spaces

Tanks

Miscellaneous

At the same time, certain requirements must be met, mainly:

Watertight subdivision and integrity

Adequate stability

Structural integrity

Adequate provision for access

As stated in the foregoing, the general arrangement is evolved by a gradual progress of trial, check and improvement.As for any other problem, the first approach to a solution to the general arrangement must be based on a minimum amount of information, including:  Required volume of cargo spaces, based on type and amount of cargo. Method of stowing cargo and cargo handling system. Required volume of machinery spaces, based on type of machinery and ship. Required volume of tankage, mainly fuel and clean ballast, based on type of fuel, and cruising range. Required standard of subdivision and limitation of main transverse bulkhead spacing. Approximate principal dimensions(length, beam, depth, and draft). Preliminary lines plan.The approximate dimensions and lines plan are base on a preliminary summation of the required volumes for all the aforementioned contents of the ship, a preliminary, estimate of all the weights in the ship, a selection of the proper hull coefficients for speed and power, and adequate freeboard and margin line for subdivision and stability.From the lines plan and margin line, a curve of sectional areas along the length of the ship and a floodable length curve may be made.The first general arrangement layout to allocate the main spaces is based on the foregoing information.Peak oulkheads and inner bottom are established in accordance with regulatory body requirements.Other main transverse bulkheads are located to satisfy subdivision requirements, based on preliminary floodable length curves.Decks are located to suit the requirements.Allowance for space occupied by structure must be deducted in arriving at the resulting net usable volumes and the clear deck heights.Usually, in the first approach, several preliminary general arrangements are laid out in the form of main space allocations, boundaries, and subdivisions.These are checked for adequacy of volumes, weights and stability, and the changes to be made in the preliminary lines to make these features satisfactory.At this point, certain arrangements may be dropped, either because they are not feasible or are less efficient than other arrangements.The general arrangement process then continues into more refined stages ,simultaneously with the development of structure, machinery layout, and calculations of weights, volumes, floodable length, and stability(intact and damaged).The selection of one basic arrangement may cone early in the process, or may have to be delayed and based on a detailed comparison of ―trade-offs.‖ In any case, the selection is usually made in consultation with the owner so that consideration may be given to his more detailed knowledge of operating problems.(From “Ship Design and Construction” by D‘ Arcangelo, 1969)

Technical Terms

1.general arrangement 总布置 29.profit 利益 2.assignment 指定,分配 30.annual cost 费用 3.space 处所,空间 31.breakdown 细目 4.access 通道,入口

32.terminal allocation 码头配置费 5.allocation 分配,配置 33.overhead 管理费,杂项开支 6.furnishings 家具 34.component(组成)部分,分量 7.conceptual(design)概念(设计)35.characteristic 特性 8.preliminary(design)初步(设计)36.mechanical 机械的 9.contract(stage)合同(阶段)37.goods 货物 10.working plan 施工图 38.marine terminal 港口,码头 11.formulation 公式化,明确表达 39.enclosing volume 密(围)闭容积 12.melding 融合 40.hull envelope 船体外壳 13.optimum 最佳 41.primary strength 总强度 14.coordinate relationship 协调关系

42.stowage 配载 15.summary 综合,摘要 43.housing 容纳 16.integration 综合,积分 44.diagram 图 17.division 部分,划分 45.superstructure 上层建筑 18.efficient and economical way 有效和46.machinery space 机舱

经济的方式 47.miscellaneous(其他)杂用舱室 19.speciality 专业 48.watertight subdivision 水密分舱 20.feed-in 送进,提供 49.integrity 完整性 21.specifications 各种技术条件,说明书 50.tankage 液舱,容量(积)22.uptake 烟道 51.clean ballast 清洁压载 23.commercial transportation 商业运输 52.lines plan 型线图 24.solid(liquid)bulk type 固体(液体)53.crusing range 巡航范围

散装型 54.margine line 限界线 25.ferryboat 渡船 55.floodable length curve 可浸长度曲线 26.transoceanic 渡(远)洋的 56.layout(设计,布置)草图 27.automobile汽车 57.peak bulkhead 尖舱舱壁 28.aforementioned(a.m.)上述的 58.regulatory body 主管机构(关)59.intact stability 完整稳性 60.trade-off 权衡,折衷

61.consultation 协商

Additional Terms and Expressions

1.interior arrangement 舱室布置

2.stairway and passageway arrangement 梯道及走道布置

3.interior/exterior passageway 内/外走道 4.bridge deck 驾驶甲板 5.compass deck 罗经甲板 6.boat deck 艇甲板

7.promenda deck 游步甲板

8.accommodation deck 起居甲板 9.vehicle deck 车辆甲板

10.winch platform 起货机平台 11.wheel house 驾驶室 12.chart room 海图室 13.radio room 报务室 14.electric room 置电室 15.mast room 桅室

16.caption‘s room 船长室 17.crew‘s room 船员室 18.cabin 客舱

19.main engine control room 主机操纵室 20.auxiliary engine room 副机舱

21.boiler room 锅炉间

22.steering engine room 舵机舱 23.workshop 机修间 24.store 贮藏室

25.fore/aft peak 首/尾尖舱

26.topside/bottomside tank 顶边/底边舱 27.wing tank 边舱

28.steering gear 操舵装置

29.anchor and mooring arrangement 锚泊和

系缆设备

30.howse pipe 锚链筒 31.chain locker 锚链舱

32.closing appliances 关闭设备 33.hatch cover 舱口盖

34.lifesaving equipment/appliance 救生设备 35.mast 桅 36.rigging 索

37.bollard 双柱带缆柱 38.bitt 带缆桩 39.fairlead 导缆钩

Notes to the Text

1.It is in formulation of the general arrangement that most of the compromises are made.这是“it is … that … ”强调句型,强调in formulation of the general arrangement.in formulation of 原意为“在……的表达中”,现意译为“体现在……中”。

2.It is important that the general arrangement be functionally and economically developed…

这是虚拟语气形式的句型,在that 从句中采用原形动词。类似的句型还有:

It is desired/suggested/requested that……

It is necessary that …

有时It is essential that …也用虚拟语气。3.hull engineering 为“船舶设备”之意 4.scientific 原意为“科学的”,现根据上下文意译成“船舶性能”。5.at the least unit cost 以最小的单价 6.a long ton 一英吨(=2240磅)

a short ton 一美吨(=2000磅)

7.any tool or implement 在这里implement 和tool 基本上同义,帮or 后面的名词在翻译时可以省略不译。

8.across a body of water 穿过一段水路/一个水域

9.aboard ship和 on board ship, 以及on board a(the ship)都为“在船上”之意。

10.Although this chapter will not go further with the system approach than is warranted by the subject of ―general arrangement‖.这个让步状语从句中包含有比较状语从句。than 后面的主语(this chapter)被省略掉了。其中的is warranted 原意为“补认为是合理(或正当)的”,整个从句可翻译成:“虽然这一章只限于‘总布置’这个主题,而不再进一步讨论系统处理方法”。

Lesson Six

Ship Lines The outside surface of a ship is the surface of a solid with curvature in two directions.The curves which express this surface are not in general given by mathematical expressions, although attempts have been made from time to time to express the surface mathematically.It is necessary to have some drawing which will depict in as detailed a manner as possible the outside surface of the ship.The plan which defines the ship form is known as a ‘line plan‘.The lines plan consists of three drawings which show three sets of sections through the form obtained by the intersection of three sets of mutually orthogonal planes with the outside surface.Consider first a set of planes perpendicular to the centre line of the ship.Imagine that these planes intersect the ship form at a number of different positions in the length.The sections obtained in this way are called ‗body section‘ and are drawn in what is called the ‗body sections‘ as shown in Figure 1*.When drawing the body plan half-sections aft of amidships(the after body sections)are drawn on one side of the centre line and the sections forward of amidships(the fore body sections)are drawn on the other side of the center line.It is normal to divide the length between perpendiculars into a number of divisions of equal length(often ten)and to draw a section at each of these divisions.Additional sections are sometimes drawn near the ends where the changes in the form become more rapid.In merchant ship practice the sections are numbered from the after perpendicular to the forward perpendicular —thus a.p.is 0 and f.p.is 10 if there are ten divisions.The two divisions of length at the ends of the ship would usually be subdivided so that there would be sections numbered 1/2, 11/2, 81/2, and 91/2.Sometimes as many as 20 divisions of length are used, with possibly the two divisions at each end subdivided, but usually ten divisions are enough to portray the form with sufficient accuracy.Suppose now that a series of planes parallel to the base and at different distances above it are considered.The sections obtained by the intersections of these planes with the surface of the ship are called ‗waterlines‘ or sometimes ‗level lines‘.The lines are shown in Figure 1.The waterlines like the body sections are drawn for one side of the ship only.They are usually spaced about, 1m(3-4ft)apart, but a closer spacing is adopted near the bottom of the ship where the form is changing rapidly.Also included on the half breadth plan is the outline of the uppermost deck of the ship.A third set of sections can be obtained by considering the inter-section of a series of vertical planes parallel to the centre line of the ship with the outside surface.The resulting sections are shown in a view called the ‗sheer profile‘ see Figure 1 and are called ‗buttocks‘ in the after body and ‗bow lines‘ in the fore body or often simply ‗buttocks‘.The buttocks like the waterlines will be spaced 1m(3-4ft)apart.On the sheer profile the outline of the ship on the centre line is shown and this can be regarded as a buttock at zero distance from the centre line.The three sets of sections discussed above are obviously not independent of one another, in the sense that an alteration in one will affect the other two.Thus, if the shape of a body section is altered this will affect the shape of both the waterlines and the buttocks.It is essential when designing the form of the ship that the three sets of curves should be ‗fair‘ and their interdependence becomes important in this fairing process.What constitutes a fair curve is open to question.But formerly the fairing process was done very largely by eye.Nowadays the lines plan is often faired by some mathematical means which will almost certainly involve the use of the computer.However the fairing process is carried out the design of the lines of a ship will normally start by the development of an approximate body plan.The designer when he has such a body plan will then lift offsets for the waterlines and will run the waterlines in the half-breadth plan.This means drawing the best possible curves through the offsets which have been lifted from the sections, and this is done by means of wooden or plastics battens.If it is not possible to run the waterlines through all the points lifted from the body plan then new offsets are lifted from the waterlines and new body sections drawn.The process is then repeated until good agreement is obtained between waterlines and body sections.It is then possible to run the buttocks, and to ensure that these are fair curves it may be necessary to adjust the shape of body sections and waterlines.The process of fairing is usually done in the drawing office on a scale drawing.It is clear that a much more accurate fairing of the form is necessary for production purposes in particular, and this used to be done in the mould loft of the shipyard full size.The procedure was for the drawing office to send to the mould loft office from the lines as faired in the office and they were laid out full size on the loft floor.A contracted scale was adopted for the length dimension but waterline and section breadths and buttock heights were marked out full size.The same process of fairing was then adopted as used in the office, the fairing being done by using wood battens of about 25mm square section pinned to the loft floor by steel pins.To save space the waterlines and buttocks in the forward and after bodies were overlapped in the forward and after bodies were overlapped in the length direction.This type of full scale fairing enabled sections, waterlines and buttocks to be produced which represented the desired form with considerable accuracy.From the full scale fairing, offsets were lifted which were returned to the drawing office and made the basis of all subsequent calculations for the ship, as will be seen later.A more recent development has been the introduction of 1/10 scale lofting, which can be done in the drawing office, and the tendency has been to dispense with full scale loft work.Several methods have also been developed for the mathematical fairing of ship forms and linking this up with production processes.Discussion of these topics, however, is outside the scope of this work..The lines drawn on the lines plan representing the ship form are what are called ―moulded lines‖, which may be taken to represent the inside of the plating of the structure.The outside surface of the ship extends beyond the moulded lines by one thickness of shell plating in an all welded ship.When riveting was put on in a series of ―in‖ and ―out‖ strakes.In this case the outsides surface of the ship extended two thicknesses of plating beyond the moulded lines in way of an outside strake and one thickness beyond the moulded lines in way of an inside strake.Actually the outside surface would be rather more than one thickness or two thicknesses of plating, as the case may be beyond the moulded line in places where there is considerable curvature of the structure, as for example at the ends of the ship or below the level of the bilge.In multiple screw merchant ships it is customary to enclose the wing shafts in what is called a ―shaft bossing‖.This consists of plating, stiffened by frames and extending from the point where the shafts emerge from the ship and ending in a casting called a ―shaft bracket‖.The bossing is usually faired separately and added on to the main hull form.The bossing is treated as an appendage.In many ships of the cross section does not change for an appreciable distance on either side of amidships.This portion is called the ―parallel middle body‖ and may be of considerable extent in full slow ships but may not exist at all in fine fast ships.Forward of the parallel middle the form gradually reduces in section towards the bow and in like manner the form reduces in section abaft the after end of the parallel middle.These parts of the form are called respectively the ―entrance‖ and the ―run‖ and the points where they join up with the parallel middle are referred to as the ―forward‖ and ―after shoulders‖.(From ―Naval Architecture for Marine Engineering‖ by W.Muckle, 1975)

Technical terms

1.ship lines 船体线型 21.drawing office 制图/设计室 2.ship form 船体形状 22.mould loft 放样间 3.mathematical expressions 数学表达式 23.full size 实尺(1:1)4.drawing 图,拉延 24.loft floor 放样台 5.lines plan 型线图 25.contracted scale 缩尺 6.orthogonal plan 正交平面 26.lofting 放样 7.body section 横剖面 27.steel pin 铁钉 8.body plan 横剖线图 28.mathematical fairing of ship form 船体9.symmetry 对称 数学光顺法 10.water lines /level lines 水线,水平型线 29.screw 螺旋桨,螺钉 11.half breadth plan 半宽水线图 30.wing shaft 侧轴 12.view 视图,观察 31.shaft bossing 轴包套 13.sheer profile 侧视图,纵剖线图 32.casting 铸件 14.buttocks 后体纵剖线 33.shaft bracket 轴支架 15.bow line 前体纵剖线 34.appendage 附属体 16.after/fore body 后/前体 35.parallel middle body平行中体 17.alteration 修改,变更 36.full slow ship 丰满的低速船 18.fairing process 光顺过程 37.fine fast ship 尖瘦的快速船 19.offsets 型值 38.entrance 进流端入口

to lift offsets 量取型值 39.run 去流端,运行,流向 20.Wooden/plastics battern 木质/塑料压条 40.forward/after shoulder 前/后肩

Additional Terms and Expressions

1.grid 格子线 4.station ordinate 站线 2.ordinate station 站 5.finished/returned offsets 完工型值 3.midstation 中站 6.table of offsets 型值表 7.diagonal 斜剖线 11.preliminary offsets 原始型值 8.keel line 龙骨线 12.mathematical lines 数学型线 9.rake of keel, designed drag 龙骨设计斜13.mathematical fairing of lines 型线数学光度 顺法 10.knuckle line 折角线

Notes to the Text

1.in as detailed a manner as possible 相当于 in a manner as detailed as possible, 阅读和翻译科技原文时,应注意这类不一般的语序。

2.关系词what可引出主语从句,表语从句等。例如:…in what is called the ‘body plan’及…in what is called a ‘shaft bossing’中的what从句作为介词in的宾语从句。

What constitutes a fair curve is open to question…中的what从句为主语从句。

The lines drawn on… are what are called moulded lines 中的what 从句为表语从句。3.When drawing the body plan half-sections only are shown because of the symmetry of the ship.When drawing the body plan 是省略了主语和谓语一部分(to be)的时间装语从句,尽管从句和主句的主语并不一致。这种省略方法似乎与一般的英语语法规律有矛盾,但在科技文献中较常见,其原因是这类省略不会引起读音的误解。

4.a.p.和f.p.分别为after perpendicular(尾垂线)和forward perpendicular(首垂线)的缩写。5.Also included on the half-breadth plan is the outlines of the uppermost deck of the ship.这是依据倒装句,为了突出情调部分,此句中的also included on the half breadth plan 这部分移至句首,主语the outline of…反而置于句末。

6.on a scale of 1/4 in to 1 ft or on 1/50 scale 以一个1/4英寸代表1英尺的比例尺(即1:48)或1:50的比例尺。

7.The procedure was for the drawing office to the mould loft offsets from the lines as faired in the office and they were laid out full size on the loft floor.for the drawing office to send….是‖for+名词+不定式‖结构,在句中作表语。For后面的the drawing office 可看作不定式的逻辑主语。

Offsets 是不定式to send 的宾语。由于它后面有一个较长的介词短语from the line(其后面又有as faired in ….On the loft floor 修饰the line)加以修饰,为了句子结构平衡的需要,被移至介语短语to the mould loft(作为地点状语用)之后。8.in way of….在…部位,在….处

这一组合介词在造船和海洋工程英语中用得较普遍。例:The structural strength of a ship in way of the engine and boiler space demands special attention the designer.机炉舱部位的船体轻度要求设计人员给予特别的注意。

The thickness of upper shell plating should be increased in way of the break.船楼端部处的上层壳板厚度应该增加。/ 9.as the case may be 按情况而定。

Lesson Seven

Ship Equilibrium, Stability and Trim

The basis for ship equilibrium

Consider a ship floating upright on the surface of motionless water.In order to be at rest or in equilibrium, there must be no unbalanced forces or moments acting on it.There are two forces that maintain this equilibrium(1)the force of gravity, and(2)the force of buoyancy.When the ship is at rest, these two forces are acting in the same perpendicular line, and , in order for the ship to float in equilibrium, they must be exactly equal numerically as well as opposite in direction.The force of gravity acts at a point or center where all of the weights of the ship may be said to be concentrated: i.e.the center of gravity.Gravity always acts vertically downward.The force of buoyancy acts through the center of buoyancy, where the resultant, of all of the buoyant forces is considered to be acting.This force always acts vertically upward.When the ship is heeled, the shape of the underwater body is changed, thus moving the position of the center of buoyancy.Now, when the ship is heeled by an external inclining force and the center of buoyancy has been moved from the centerline plane of the ship, there will usually be a separation between the lines of action of the force of gravity and the force of buoyancy.This separation of the lines of action of the two equal forces, which act in opposite directions, forms a couple whose magnitude is equal to the product of one of these forces(i.e.displacement)and the distance separating them.In figure 1(a),where this moment tends to restore the ship to the upright position, the moment is called the righting moment, and the perpendicular distance between the two lines of action is the righting arm(GZ).Suppose now that the center of gravity is moved upward to such a position that when the ship is heeled slightly, the buoyant force acts in a line through the center of gravity.In the new position, there are no unbalanced forces, or, in other words, a zero moment arm and a zero moment.In figure 1(b),the ship is in neutral equilibrium, and further inclination would eventually bring about a change of the state of equilibrium.If we move the center of gravity still higher, as in figure 1(c),the separation between the lines of action of the two forces as the ship is inclined slightly is in the opposite direction from that of figure 1(a).In this case, the moment does not act in the direction that will restore the ship to the upright but will cause it to incline further.In such a situation, the ship has a negative righting moment or an upsetting moment.The arm is an upsetting arm, or negative righting arm(GZ).These three cases illustrate the forces and relative position of their lines of action in the three fundamental states of equilibrium.32

Fig.1 Stable(a), Neutral(b), and Unstable(c)

Equilibrium in the upright position

The hull is shown inclined by an outside force to demonstrate the tendency in each case(From ―Modern Ship Design ‖ Second Edition, by Thomas.C.Gillmer, 1975)Stability and trim

Figure 2 shows a transverse section of a ship floating at a waterline WL displaced from its

buoyancy

Weight of ship

Fig.2 Stability shown in a transverse section of a floating ship(see text)

original waterline WL.One condition of equilibrium has been defined above.A second condition is that the centre of gravity of a ship must be in such a position that, if the vessel is inclined, the forces of weight and buoyancy tend to restore the vessel to its former position of rest.At small angles, vertical lines through B, the centre of buoyancy when the vessel is inclined to an angle 0,intersect the center line at M, the metacentre, which means ―change

point‖.If M is above G(the centre of gravity of the ship and its contents),the vessel is in stable equilibrium, When M concides with G, there is neutral equilibrium.When M is below G, the forces of weight and buoyancy tend to increase the angle of inclination, and the equilibrium is unstable.The distance GM is termed the metacentric height and the distance GZ, measured from G perpendicular to the vertical through B, is termed the righting level or GZ value.Weight and buoyancy are equal and act through G and B, respectively, to produce a moment(tendency to produce a heeling motion)△GZ, where △ is the displacement or weight in tons.Stability at small angles, known as initial stability, depends upon the metacentric height GM.At large angle, the value of GZ affords a direct measure of stability, and it is common practice to prepare cross-curves of stability, from which a curve of GZ can be obtained for any particular draft and displacement.Transverse stability should be adequate to cover possible losses in stability that may arise from flooding, partially filled tanks, and the upward thrust of the ground or from the keelblocks when the vessel touches the bottom on being dry-docked.The case of longitudinal stability, or trim, is illustrated in Figure3.There is a direct analogy with the case of transverse stability.When a weight originally on board at position A is moved a distance d, to position B, the new waterline W1L1 intersects the original waterline WL at center of flotation(the centre of gravity of the water plane area WL),the new centre of buoyancy is B, and the new centre of gravity is G.For a small angle of trim, signified by the Greek letter theta(θ),θ=(a+f)/L wd=△GMl(a+f)/L

Changes in stern trim is x-y

Fig.3 Longitudinal section of float ship showing change in stern trim as deck load w was shifted

from position A to position B(see text)

Thus if(a+f)=1 inch =1/12 foot, wd =△GM/12L and this presents the moment to change trim one inch.The inclining experiment

A simple test called the inkling experiment provides a direct method of determining GM, the metacentric height, in any particular condition of loading, from which the designer can deduce the position of G, the ship‘s centre of gravity.If a weight w(ton)is transferred a distance d(feet)from one side of the ship to the other and thereby causes an angle of heel theta(θ)degrees,34 measured by means of a pendulum or otherwise, then GM=wd/△tanθ(see Figure 2).For any particular condition, KB and BM can be calculated, GM is found by the inclining experiment, whence KG=KM-GM.It is simple to calculate the position of G for any other condition of loading.(From ―Encyclopedia Britannica‖, Vo1.16, 1980)

Technical Terms

1.equilibrium平衡 15.stable equilibrium 稳定平衡 2.stability and trim 稳性与纵倾 16.netural equilibrium 中性平衡 3.floating upright 正浮 17.metacenter height 稳心高 4.force of gravity 重力 18.righting level 复原力臂 5.resultant 合力 19.initial stability 初稳性 6.center of buoyancy 浮力 20.cross-curves of stability 稳性横截曲线 7.couple 力偶 21.flooding 进水 8.magnitude 数值(大小)22.thrust 推力 9.displacement 排水量,位移,置换 23.keelblock 龙骨墩 10.righting moment 复原力矩 24.dry dock 干船坞 11.righting arm 复原力臂 25.center of floatation 漂心 12.upsetting moment 倾复力矩 26.Greek letter 希腊字母 13.upsetting arm 倾复力臂 27.inclining experiment 倾斜试验 14.metacentre 稳心 28.pendulum 铅锤,摆

Additional Terms and Expressions

1.lost buoyancy 损失浮力 9.stability at large angles 大倾角稳性 2.reserve buoyancy 储备浮力 10.dynamical stability 动稳性 3.locus of centers of buoyancy 浮心轨迹 11.damaged stability 破舱稳性 4.Bonjean‘s curves 邦戎曲线 12.stability criterion numeral 稳性衡准书 5.Vlasov‘s curves 符拉索夫曲线 13.lever of form stability 形状稳性臂 6.Firsov‘s diagram 菲尔索夫图谱 14.locus of metacenters 稳心曲线 7.Simpson‘s rules 辛浦生法 15.angle of vanishing stability 稳性消失角 8.trapezoidal rule 梯形法 16.free surface correction 自由液面修正

Notes to the Text

1.When the ship is at rest, these two forces are acting in same perpendicular line, and, in order for the ship to float in equilibrium, they must be exactly equal numerically as well as opposite in direction.in order for the ship to float in equilibrium 是“in order带to的不定式“结构,表示目的状语,其中for the ship中的the ship是不定式逻辑主语。

As well as是一个词组,可有几种译法,具体译成什么意思应根据上下文加以适当选择。例如:

The captain as well as the passenger was frightened.船长和旅客一样受惊。(和……一样)受惊的既有旅客又有船长。(既……又)

不仅旅客而且船长也受惊了。(不仅……而且)除旅客外,还有船长也受惊了。(除……外,还)

不管那种译法,强调的都是as well as前面的那个名次(例句中的the captain,船长),因此谓语动词的性、数也由这个名词决定。

2.thus moving the position of the center of buoyancy.由thus引出的现在分词短语用作表示结果的状语。一般来说,如分词短语位于句末,往往有结果、目的等含义。

3.suppose now that the center of gravity is moved upward to such a position that when the ship is heeled slightly, the buoyant force acts in a line through the center of gravity.Suppose now that …与now let‘s suppose that…同意,其后that 所引出的从句是suppose 的宾语从句。

to such a position that…是such…that…引导结果状语从句。但在这个从句中又包含了一个由关系副词when引导的时间状语从句。

4.Figure 2 shows a transverse section of a ship floating at a waterline WL, displaced from its original waterline WL.floating at a waterline WL 现在分词短语(含有主动态),修饰前面的名词a ship;displaced from its original waterline WL 过去分词短语(含有被动态),也是修饰前面的名词,ship,注意这里的displaced 应选择“移动位置”的词义。

5.At small angles, vertical lines through B, the center of buoyancy when the vessel is inclined at an angle θ,intersect the center line at M, the metacenter, which means ―change point‖.此句的主要成分为vertical lines intersect the center line.the center of buoyancy 是B的同位语。the metacenter 是M的同位语。

6.Tranverse stability should be adequate to cover possible losses in stability that may arise from flooding ,partically filled tanks, and the upwards thrust of the ground or from the keelblocks when the vessel touches the bottom on being dry-docked.that may arised from…the keelblocks是定语从句,修饰losses.when the vessel…on being dry-docked是时间状语从句,修饰may arise from the keelblock.on being dry-docked 中的being dry-docked是动名词的被动态,接在on之后表示(刚)进船坞的时候。

7.or otherwise意为“或相反,或其他”。例:

It can be verified by trial or otherwise.这可用试验或其他方法加以验证。

Fine or otherwise,we shall have to do this test.不管天气好不好,我们非做这个试验不可。

Lesson Eight

Estimating Power Requirements The power required to propel a new ship is subject to a formidable number of variable items.The family tree of power for propulsion(Fig.1)shows these divided into two main groups.One is concerned with the resistance to motion caused by the interaction of the hull of the ship with the surrounding water and the other concerns the efficiency with which the power developed in the engine itself can be used and converted into thrust at the propeller.Before considering the methods used for estimating their combined effect on power requirements, it is necessary to take the items in turn and discuss briefly their significance and nature.Fig.1 Power for propulsion

Ship resistance Friction at the hull surface in contact with the water is the major part of the resistance of all merchant vessels.Wave-making resistance does not assume prime importance until a speed/length ratio(V/√L)in excess of unity has been reached.The reason for surface friction is that water is far from being a perfect fluid.Its magnitude depends on the length and area of surface in contact and its degree of roughness, and it varies with the speed of the body through the fluid.By observation and experiment it can be shown that the particles of water in actual contact with the ship adhere to its surface and are carried along by it(it does not seem unreasonable to assume some interlocking of particles).There is no slip.At small distances from the body the velocity imparted to the surrounding fluid is only very small but with a noticeable degree of turbulence.The width of this belt, known as the layer increases somewhat towards the after end of the moving body.Its appearance is one of the most spectacular sights to be seen when a vessel is moving at high speed.from a practical point of view it is assumed that all the fluid shear responsible for skin friction occurs within this belt and also that outside it fluid viscosity can be disregarded.The exact width of the belt is difficult to determine, but an arbitrary assessment is usually accurate enough.If it is now considered that the effective shape of the immersed body is defined by the extremities of the boundary layer, then that body may be assumed to move without friction.However, this does not apply to the transmission of pressure.Part of the energy necessary to move a ship over the surface of the sea is expended in the form of pressure waves.This form of resistance to motion is known as residual resistance, or wave-making.Three such wave systems are created by the passage of a ship: a bow system, a stern system(both of which are divergent), and a transverse system.They occur only in the case of a body moving through two fluids simultaneously.For instance, the residuary resistance of well formed bodies like aircraft or submarines, wholly immersed, is comparatively small.Because of surface waves formed by a floating body the flow pattern varies considerably with speed, but

with an immersed body this flow pattern is the same at all speeds.For this reason the shape of a submarine or aircraft(in consideration of submerged performance only)is more easily related to the constant conditions under which it performs ,in the dynamic sense, than is the form of surface vessel.Returning to a consideration of our three wave systems, it can easily be understood that the bow system is initiated by a crest due to the build-up of pressure necessary to push the water aside and the greater the speed the greater will be the height of the crest and its distance from the bow.Conversely, the stern system is associated with a hollow due to filling-in at the stern.If a ship had a sufficient length of parallel middle body the bow wave system would die out before it reached the stern, but in practice ships are never long enough for this to obtain and interference effects have to be taken into account.The transverse wave system becomes of importance at high speeds and is responsible for the greater part of wave-making resistance.The net effect of the three systems is extremely important from a residuary resistance point of view, and it is necessary to ensure that they do not combine to produce a hollow(a through)at the stern.Of course, if the energy produced at the bow could be recovered at the stern then there would be no net energy loss.But this is not the case as energy is dissipated laterally in order to maintain a wave pattern.The more developed the wave pattern the more energy is needed to maintain it.Considerations of minimum resistance, therefore, involved a complicated assessment of the interrelation of ship-form characteristics likely to reduce wave causation.Wave-making resistance follows the laws of dynamic similarity(also known as Froude‘s Law of Comparison), which state that the resistances of geometrically ships will vary as the cube of their linear dimensions provided the speeds are in the ratio of the square root of the linear dimensions.Perhaps the law, which does not apply to frictional resistance, looks more concise if stated symbolically, namely:

RtL3V3providedrtvlL l

The most important cause of eddy-making is the ship.There is sometimes a tendency to think of eddy-making as being related only to such appendages as rudders, bilge keel, propeller bossings and the like.While it is perfectly true that badly designed appendages can have eddy-making resistances which are excessive in relation to their size and frictional resistances, the eddy-making of a ship, though relatively small, may be a very large part of the total eddy-making resistance.Eddy making is usually included with the wave-making resistance because it is impracticable to measure the one without the other.However, some distinction is helpful to an understanding of resistance phenomena.In eddy-making it is the stern of the ship which plays the influential part because of the difficulty of maintaining streamline flow even in the most easily shaped body.Propulsion

It will be obvious that the total resistance of a ship at any speed and the force necessary to propel it must be equal and opposite.The power that the ship‘s machinery is capable of developing, however, must be considerably more than this to overcome the various deficiencies inherent in the system, because engines, transmission arrangements and propellers all waste power before it becomes available as thrust.The total efficiency of propulsion therefore involves a consideration of the separate efficiencies of individual items the product of which is expressed in the form of a propulsive coefficient.The engine efficiency depends upon the type of engine employed and its loading.In the case of a reciprocating engine, either diesel or steam, the power developed in the cylinders can be calculated from the effective pressures recorded on indicator cards.This is known as indicated h.p., which is naturally more than the horsepower output when measured by means of a brake at the crankshaft coupling.The ratio b.h.p./i.b.p.is, of course the mechanical efficiency of the engine.If the power is measured on the propeller shaft aft of the thrust

block and any gearing, then this is known as shaft h.p.and in the case of a turbine is the only place at which it is practicable to measure the power output.There is no such thing as indicated or brake horsepower for a steam or gas turbine, shaft h.p.is almost the same as b.h.p.for a reciprocating engine which drives the propeller directly, but where gearing or special couplings are introduced in the case of high-speed diesel engines or turbines, the transmission losses in these items influence the s.h.p.This is, of course very necessary in order that fair comparisons between the efficiencies of different types of drives can be made.The remainder of the transmission losses are those in the stern tube.When all the engine and transmission losses have been taken into account what is left is a certain amount of the original power which is now delivered at the propeller.We have already noted that a ship in motion drags along with it a large mass of water.This ―wake‖ as it is known(not the popular interpretation of something that is left astern!)has a forward velocity in which the screw operates, so that the speed of the screw through the wake water is less than the speed of the ship.This is beneficial as it involves a gain in efficiency which is referred to as the wake gain.On the pressure distribution at the stern of the vessel which causes some augment of resistance.It is usual to consider this as a thrust deduction effect.These almost separate effects can be combined to give the effective horse-power required.The screw efficiency in the open, i.e.delivering its thrust to an imaginary vessel, is most important.It is only by considering hull resistance and propeller performance as separate entities that any proper assessment can be made of their effect when combined.The mechanism of hull resistance has been fairly well explored, but the theories of propeller action are still incomplete.Power estimates

When power estimates are required by a shipbuilder who is tendering for the construction of a new vessel, there is no time to run model tests, nor would the expense normally the justified.The naked e.h.p.is therefore estimated from a published series of methodical tests such as those of Ayre or Taylor.Percentage allowances are made to the naked e.h.p.for appendages and air resistance combined with an estimated lies in the proper selection of the QPC.There are numerous methods of estimating power, but the above is one of the most popular.Some rapid means of evaluating ship power requirements merely from a lines plan and main technical particulars has long been needed.With increasing productivity, faster construction times and fierce international competition for new orders this has become ever more pressing.Detailed power assessments for ship design proposals are needed frequently well in advance of any firm order.Statistical analysis methods are now being applied to resistance and propulsion problems to peed up the process of ship performance prediction.Performance criteria are expressed, in terms of equations based on selected parameters of hull shape, dimensions, propeller characteristics and stern conditions.Performance of a design can be assessed from these regression equations which have been derived from a large number of previous model results for the ship type under review.Comparison of a particular result with established data is obtained by minimization of the regression equations.The big advantage of doing things this way is that the coefficients of the regression equations can be fed into a high-speed digital computer.This means that in less than an hour the results of well over a dozen different combinations of hull characteristics can be calculated.This should then lead to an optimum combination of form parameters.The eventual link up with work now being done on the complete definition of hull shape in mathematical terms should take us one step nearer to the soundly based fully automated shipyard.(From ― Background to Ship Design and Shipbuilding Production‖ by J.Anthony Hind, 1965).39

Technical Terms

1.resistance 阻力 2.thrust 推力

3.propeller 推进器

4.skin friction resistance 摩擦阻力 5.wave-making resistance 兴波阻力 6.eddy-making resistance 漩涡阻力 7.appendage resistance 附体阻力 8.propulsive efficiency 推进效率 9.hull efficiency 船身效率

10.transmission efficiency 轴系效率 11.speed/length ratio 速长比 12.perfect fluid 理想流体 13.roughness 粗糙度 14.turbulence 紊动

15.boundary layer 边界层

16.spectacular sights 壮观景色 17.fluid shear 流体剪力 18.fluid viscosity 流体粘性

19.immersed body 浸没的船体部分 20.residuary resistance 剩余阻力 21.bow 船首 22.stern 船尾

23.divergent 分散的 24.submarine 潜水艇 25.aircraft 飞机 26.crest 波峰

27.hollow 凹陷,孔隙,波谷 28.parallel middle body平行中体 29.through 波谷

30.ship-form characteristics 船型特性

31.laws of dynamics similarity 动力相似定律 32.rudder 舵

33.bilge keel 舭龙骨

34.propeller bossing 推进器箍 35.streamline 流线型

36.reciprocating engine 往复式发动机 37.diesel/steam engine 柴油/蒸汽机 38.indicator card 示功图 39.indicated h.p.指示马达 40.brake 制动

41.crankshaft coupling 曲轴连轴器 42.mechanical efficiency 机械效率 43.thrust block 推力轴承 44.gearing 齿轮 45.shaft h.p.轴马达 46.brake h.p.制动马达 47.turbine 汽轮机

48.gas turbine 燃气轮机 49.stern tube 尾轴管 50.wake 伴流

51.astern 向(在)船尾 52.wake gain 伴流增益

53.thrust deduction 推力减额

54.effective horse-power(e.h.p.)有效马达

55.screw efficiency in the open(water)螺旋桨趟水效率

56.imaginary vessel 假想船

57.mechanism 作用原理(过程),机构 58.proposal 建议

59.statistical 统计分析 60.criterion 衡准

61.ship performance prediction 船舶性能预报 62.regression equation 回归方程 63.form parameter 形状参数

Additional Terms and Expression 1.2.3.4.5.6.7.service speed 服务航速 design speed 设计航速 cruising speed 巡航速度 trial speed 试航速度 endurance 续航力

admiralty coefficient/constant 海军系数 fouling 污底

8.hydrodynamics 水动力学 9.inflow 进流

10.angle of attack 攻角

11.lift 升力

12.circulation 环量

13.aspect ratio 展弦比

14.Reynolds number 雷诺数 15.Froude number 傅汝德数 16.momentum theory 动量理论 17.impulse theory 冲量理论 18.cavitation 空泡现象

19.adjustable-pitch propeller 可调螺距螺旋桨

controllable-pitch propeller 可调螺距螺旋桨 20.reversible propeller 可反转螺旋桨

21.coaxial contra-rotating propellers 对转螺旋桨 22.ducted propeller, shrouded propeller 导管螺旋桨 23.tandem propeller 串列螺旋桨

24.jet propeller 喷射推进器 25.paddle wheel 明轮

26.ship model experiment tank 船模试验水池 27.ship model towing tank 船模拖拽试验水池 28.wind tunnel 风洞

29.cavitation tunnel 空泡试验水筒 30.self propulsion test 自航试验 31.scale effect 尺度效应 32.naked model 裸体模型

1.2.3.4.5.6.Notes to the Text

the family tree of power for propulsion 推进马力族类表

For this reason the shape of a submarine or aircraft(in consideration of submerged performance only)is more easily related to the constant conditions under which it performs, in the dynamic sense, than is the form of a surface vessel.其中的主要句子the shape---is more easily---than---是一句带有比较状语从句的复合句。在than is the form of a surface vessel 中省略了 easily related to the variable conditions under which it performs,显然,to the constant conditions 和 to the variable conditions 实际上是不同的。严格说,这种省略方法是不正规的,但由于读者能从上下文联系中容易判断出种种不同,为了简便起见,作了省略。在英美科技文章中有此种现象。

the greater the speed the greater will be the height of the crest and its distance from the bow.The more developed the wave pattern the more energy is needed to maintain it.这两句都是“the+比较级---the +比较级”结构的句型。this is not the case 情况并非如此

and the like = and such like 以及诸如此类

The eventual link up with work now being done on the complete definition of hull shape in mathematical

Lesson Nine

Ship Motions, Manoeuvrability Ship motions Ship motions are defined by the movements from the equilibrium position of the ship‘s centre of gravity along the three axes shown in Figure 1 and by rotations about axes approximately parallel to these.The linear displacements along the horizontal(x), lateral(y), and veritical(z)

Fig.1 Coordinate axes of ship motions(see text)

axes are termed surge, sway, and heave, respectively.The rotations about the corresponding body axes are respectively termed roll, pitch, and yaw(veering off course).Roll, pitch, and heave are oscillatory because hydrodynamic forces and moments oppose them.Ship motions are important for many reasons.A ship should be able to survive any sea that may be Encountered and, in addition, to behave well and to respond to control.In brief, a ship should respond to the action of the sea in such a manner that the amplitudes of its motions and its position never become dangerous, and so that the accelerations it undergoes are kept within reasonable limits.Propulsive performance, or heaving.Hence these motions are made as small as possible.Ship motions are excited by waves, whose growth is governed by the wind velocity at the sea surface, the area of water, or distance, over which the wind blows(the ―fetch‖), and the length of time during which the wind has been blowing(the ―duration‖).Any seaway is always a complex mixture of waves of different lengths, as wind itself is a complex mixture of gusts.All wave components do not travel in the same direction, but the directions of most of them in a single storm lie within 30°of each other.Regular trains of waves of uniform height and length are rarely, if ever, encountered.Most seas are confused and can be considered as made up of many separate component waves that differ in height and length.Pitching, rolling, and heaving are all excited by the changing pattern of surface waves in relation to the speed and course of the ship.In practice, it is possible to damp one motion only---that of rolling.The fitting of bilge keels(finlike longitudinal projections along the part of the underwater body of a ship between the flat of the bottom and the vertical topsides)has this effect, and still more effective means are the activated for stabilizer(a device along the side of a ship activated by a gyroscope and used to keep the ship steady)and the passive or flume stabilizing tank, filled with water inside the ship.Manoeuvrability

Increases in the size and speed of ships bring problems of safe operation in congested waters and control at high speed in waves.Therefore, designs necessarily represent a compromise between manoeuvrability and course-keeping ability.Ship operators desire maximum manoeuvrability in port to minimize the need for assistance from tugs and to reduce delays in docking.They also desire a ship that can hold a steady course at sea with the minimum use of helm.These aims, however, are mutually conflicting.A ship is steered by means of one or more rudders arranged at the stern or, in rare cases, at the bow.There are many types and shapes of rudders, depending upon the type of ship, design of stern, and number of propellers.When a yaw---that is, a change of angle about a vertical axis through the centre of gravity---is started, a turning moment is set up and the ship swings off course unless the swing is corrected by rudder action.This turning effects arises because the hull′s centre of lateral resistance is much nearer the bow than the ship′s centre of gravity.Good course keeping demands directional stability.This is aided by design features that bring the centre of lateral resistance nearer to the ship′s centre of gravity.These measures, however, increase the diameter of the ship′s turning circle, requiring a design compromise.In warships, in vessels operating in confined water, and in tugs, a small turning circle is essential.In merchant ships, rapid manoeuvring is required only in port;accordingly, the everyday function of the rudder is to ensure the maintenance of a steady course with the minimum use of helm.In this sense, turning circle properties are of less practical significance than the effect of small rudder angles.(From ―Encyclopedia Britannica‖, Vol.16, 1980)

Technical Terms

1. manoeuvrability 操纵性 3. surge 纵荡 2. linear displacement 线性位移 4. sway 横荡

5. heave 垂荡 6. veer 变向

7. oscillatory 振荡

8. hydrodynamic 流体动力(学)的 9. Amplitude 振幅 10. acceleration 加速度 11. wind velocity 风速 12. fetch 风区长度,波浪形成区 13. duration 持续时间 14. seaway 航路(道)15. gusts 阵风(雨)16. storm 风暴 17. regular trains of waves 规则波系

18. damp 阻尼 19. bilge keel 舭龙骨 20. finlike 鳍状

21.projection 突出体,投影,规则

22.activated fin stabilitizer 主动式稳定(减摇)鳍 23.gyroscope(gyro)陀螺仪,回转仪 24.steady 稳定 25.flume 槽

26.congested waters 拥挤水域 27.course-keeping 保持航向 28.tug 拖船

29.docking 靠码头 30.helm 操舵,驾驶 31.swing 摆动

32.turning circle 回转圈 33.warship 军舰

34.confined water 受限制水域

Additional Terms and Expressions

1.2.3.4.5.6.7.8.9.10.11.seakeeping 耐波性 seaworthiness 适航性 course 航向 track, path 航迹 drift 横漂 side slip 横移 rudder effect 舵效 sea condition 海况 swell 涌

trochoidal wave 坦谷波 divergent wave 散波

12.13.14.15.16.17.18.natural period 固有周期 slamming 砰击

turning quality 回转性 turning circle 回转圈

turning circle test 回转试验 stopping test 停船试验

free running model test 自由自航模操纵性试验

19.rotating arm test 旋臂试验

20.planar motion mechanism平面运动机构

Notes to the Text

1.In brief, a ship should respond to the action of the sea in such a manner that the amplitudes of its motions and its position never become dangerous, and so that the accelerations it undergoes are kept within reasonable limits.in such a manner that the amplitudes---become dangerous

句为结果状语从句。原一位“以这样的方法,以至于------”,译成中文时可灵活些,例如可把前半句译为“简略说,船舶对海浪的响应方式应使其运动的幅值和所在的位置永远不处于一种危险状态”。

and so that 引出的也是结果状语从句。此句中的it undergoes 为省略了关系代词

that 的定语从句(that 在定语从句中作宾语时,让往被省略),用来修饰 the accelerations.2.of each other 中的of表示(相互间的)方位、距离。

The shipyard is within 5km of shanghai.43 这个船厂离上海5公里以内。

3.if ever 为if they are ever encountered 的简化形式。当从句内的谓语动词为to be,有其主语跟主句的主语相同时,从句中的主语和to be 就可省略。这类连接词除if外,还有when, while, once 以及as 等。

4.Most seas are confused and can be considered as made up of many separate component waves that differ in height and length。

其中的as made up of many separate component waves 是as引导的过去分词短语作为主语补足语。

that 引出的定语从句用来修饰waves.5.This turning effect arises because the hull‘s centre of lateral resistance is much nearer the bow than the ship‘s centre of gravity.because引出的原因状语从句中包含了一个比较级状语从句,than后面的从句中省略了与主句中相同的部分(is near the bow),这是科技文章中常见的情况。

6.These measures, however, increase the diameter of the ship‘s turning circle, requiring a design compromise.此句中的requiring a design compromise 为现在分词短语,作状语(表示结果)用(参见第七课注释

Lesson Ten The Function of Ship Structural Components The strength deck, bottom, and side shell of a ship act as a box girder in resisting bending and other loads imposed on the structure.The main deck, bottom, and side shell also form a tight envelope to withstand the sea locally.The remaining structure contributes either directly to these functions or indirectly by maintaining the main members in position so that they can act efficiently.The bottom plating is a principal longitudinal member providing the lower flange of hull girder.It is also part of the watertight envelope, and subject to the local water head.At the forward end, it must withstand the dynamic pressure associated with slamming and plating thickness is usually increased to provide the necessary strength.When fitted, the inner bottom also makes a significant contribution to the strength of lower flange.It usually forms a tank boundary for the double bottom tanks and is subject to the local pressure of the liquid contained therein.In addition, it must support the loads from above, usually from cargo placed in the holds.The strength deck forms the principal member of the upper flange, usually provides the upper water tight boundary, and is subject locally to water, cargo, and equipment loadings.The remaining continuous decks, depending on their distance from the neutral axis, contribute to a greater or lesser extent in resisting the longitudinal bending loads.Certain decks which are not continuous fore and aft and not contribute to the longitudinal strength.Locally internal decks are subject to the loads of cargo, equipment, stores, living spaces, and, where they form a tank boundary or barrier against progressive flooding, liquid pressure.The side shell provides the webs for the main hull girder and is an important part of the watertight envelope.It is subject to static water pressure as well as the dynamic effects of pitching, rolling, and wave action.Particularly forward, the plating must be able to withstand the impact of

the seas.Aft, extra plate thickness is beneficial in way of rudders, shaft structure and propellers for strength, panel stiffness, and reduction of vibration.Additional thickness is necessary at the waterline for navigation in ice.Bulkheads are one of the major components of internal structure.Their function in the hull girder depends on their orientation and extent.Main transverse bulkheads act as internal stiffening diaphragms for the girder and resist racking loads, but do not contribute directly to longitudinal strength.Longitudinal bulkheads, on the other hand, if extending more than about one-tenth the length of the ship, do contribute to longitudinal strength and in some ships are nearly as effective as the side shell itself.Bulkheads generally serve structural functions such as forming tank boundaries, supporting decks and load-producing equipment such as kingposts, and adding rigidity to produce vibration.In addition, transverse bulkheads provide subdivision to prevent progressive flooding.All applicable loads must be considered during design.The foregoing structural elements of a ship are basically large sheets of plate whose thicknesses are very small compared with their other dimensions, and which, in general, carry loads both in and normal to their plane.These sheets of plate may be flat or curved, but in either case they must be stiffened in order to perform their required function efficiently.The various stiffing members have several functions:(a)the beams support the deck plating;(b)the girder, in turn, support the beams, transferring the load to the stanchions or bulkheads;(c)the transverse frames support the side shell and the ends of the transverse deck beams and are, in turn, supported by decks and stringers;(d)the stiffeners support the bulkhead plating, and so on.As discussed in detail in section 4, the stiffening members are generally rolled, extruded, flanged, flat, or built-up plate sections with one edge attached to the plate they reinforced.Vertical plates often connect the bottom shell and inner bottom, stiffening both members.If oriented transversely, these plates are called floors, and if longitudinally oriented, center vertical keel or side girder, as appropriate.Stiffening members do not, of course, act independently of the plating to which they are attached.A portion of the plate serves as one flange of the stiffener, and properties such as section modulus and moment of the stiffener must reflect this.The American Bureau of Shipping(ABS)considers a width of plating equal to the stiffener spacing as effective, while Lloyd‘s Register of Shipping(LR)assumes 24 in.to be effective.Stiffening members serve two functions, depending on how they are loaded.In the cases of loads normal to the plate, such as water loading on a transverse bulkhead, the stiffeners assume the load transferred from the plate.In the case of in-plane loads, such as those included in the deck by longitudinal bending of the hull girder, the beams serve to maintain the deck plating in its designed shape.If the deck beams are longitudinally oriented, they will, of course, carry the same primary stress as the plating and may contribute substantially to the hull girder strength.Pillars are used to support deck girders, longitudinal or transverse.These supports, in addition to carrying local loads from cargo, etc, serve to keep the deck and bottom from moving toward each other as a result of longitudinal bending of the hull girder.(From ―Ship Design and Construction‖ by D‘Arcangelo, 1969)

Technical Terms 1.2.3.4.5.6.7.8.9.10.11.12.13.14.15.16.17.18.19.20.21.22.23.24.25.26.27.28.structural components 结构构件 strength deck 强力甲板 box girder 箱形梁

tight envelope 密闭外壳

longitudinal member 纵向构件 hull girder 船体梁

lower/upper flange 下/上翼缘板 forward/aft end 首/尾端

dynamic pressure 动压力 slamming 砰击 inner bottom 内底 hold 货舱

double bottom 双层底 hold 货舱

neutral axis 中和轴

longitudinal bending 纵向弯曲 longitudinal strength 总纵(纵向)强度 barrier 挡板,屏障 web 腹板

static water pressure 静水压力 impact 冲击

shaft strut 尾轴架

panel stiffness 板格刚性 vibration 振动 bulkhead舱壁 diaphragm 隔壁

racking load 横扭载荷 kingpost 起重柱

29.30.31.32.33.34.35.36.37.38.39.40.41.42.43.44.45.46.47.48.49.50.51.52.53.rigidity 刚度 subdivision 分舱 sheet 薄板 stanchion 支柱 stringer 船侧纵桁 roll 辗轧 extrude 挤压

flange 拆边,法兰

built-up plate sections 组合型材 bottom shell 外底板 floor 肋板

center vertical keel 中内龙骨,中桁材 side girder 旁桁材,旁纵桁 stiffener 扶强材

section modulus 剖面模数 moment of inertia 惯性矩

The American Bureau of Shipping(ABS)美国验船局 spacing 间距

Lloyd‘s Register of Shipping 劳氏船级社

in-plane 面内 beam 横梁

primary stress 第一类应力

pillar 支柱

deck girder 甲板纵桁 support 支柱(构件)

Additional Terms and Expressions 1.main hull 主船体 12.longitudinal framing 纵骨架式 2.superstructure 上层建筑 13.transverse framing 横骨架式 3.deckhouse 甲板室 14.flat plate keel平板龙骨 4.bridge 桥楼 15.margin plate 内底边板 5.forecastle 首楼 16.bilge bracket 舭肘板 6.poop 尾楼 17.side plate 舷(船)侧板 7.stem 首柱 18.sheer strake 舷顶列板 8.sternpost 尾柱 19.stringer plate 甲板边板 9.rudder post 舵柱 20.shell expansion plan 外板展开图 10.shaft bossing 轴包架 21.bulwark 舷墙 11.framing 骨架 22.hatch coaming 舱口围板

30.hawse pipe 锚链筒 31.bulb plate 球扁钢 32.angle section 角钢 33.T section T型材 34.face plate 面板 35.butt 对接(缝)36.seam 边接(缝)

Notes to the Text 1.The remaining structure contributes either directly to these functions or indirectly by maintaining the main members in position so that they can act efficiently.句中含有either directly---or indirectly---两个并列成分,而在indirectly 后省略了to these functions.by maintaining the main members in position so that---是用来修饰后者的;其中so that they can act efficiently 为目的状语从句。

2.be subject to(n.)受------支配(易受,须经)

be subjected to(n.)受到,经受

Ships subject to the code should survive the normal effects of flooding following assumed hull damage caused by some external force.受本规则约束的船舶应能承受在外力作用下船体遭受假定破碎后正常进水的影响。

All full penetration butt welds of the shell plating of cargo tanks should be subjected to 100 per cent radiographic inspection.液货舱壳板所有全焊透对接焊缝应进行100%的射线照相检验。

课文中的be subject to 均可作为be subjected to 理解,翻译成“承受”,“经受”。

3.to a greater or lesser extent 在较大或较小程度上

4.Locally, internal decks are subject to the loads of cargo, equipment, stores, living spaces, and, where they form a tank boundary or barrier against progressive flooding, liquid pressure.句中的where they form---flooding 为地点状语从句,然而带有条件性质,可理解为承受liquid pressure 的条件。

5.As discussed in detail in Section 4, the stiffening members are generally rolled, extruded, flanged, flat or built-up plate sections with one edge attached to the plate they reinforce.句中的rolled, extruded, flanged, flat or built-up plate 都修饰sections.with one edge attached to the plate 是 with 后带主谓关系的复合短语。they reinforce 为省略关联词(从语中作宾语)的定语从句,修饰前面的the plate.6.If oriented transversely, these plates are called floor, and if longitudinally oriented, center vertical keel or side girder, as appropriate.两个if从句中省略主语及to be,参见第九课注3.在 center vertical keel or side girder 前面省略了these plates are called.As appropriate 可理解为as is appropriate 简化形式,关系代词as代替整个主句,并在从句中作主语,as appropriate, to passenger ships carrying dangerous goods.如第54条规则的要求适合于载运危险货物的客船,应照此办理。

7.The American Bureau of Shipping(ABS)considers a width of plating equal to the stiffener spacing as effective, while Lloyd‘s Register of Shipping(LR)assumes 24 in.to be effective.While 引出并列分句,表示同时存在两种事物的对比。前句的considers… as effective 与后句的assumes… to be effective 结构相似,其中的as effective 和 to be effective 均作宾语补足语。

23.24.25.26.27.28.29.cantilever 悬臂梁

intercostal member 间断构件 cant frame 斜肋骨 pant beam 强胸横梁 lightening hole 减轻孔 bracket 肘板 bracket 肘板 Lesson Eleven

Structural Design, Ship Stresses Structural design

After having established the principal dimensions, form, and general arrangement of the ship, the designer undertakes the problem of providing a structure capable of withstanding the forces which may be imposed upon it.The hull of a steel merchant ship is a complex structure, unique in the field of engineering structures in that it is primarily a plate structure, depending for its major overall strength on the plating of the shell, decks, and in most cases, also on the inner bottom and longitudinal bulkheads.The framing members, each of which has its own function to perform, are designed primarily to maintain the plate membrances to the planned contours and their positions relative to each other when subjected to the external forces of water pressure and breaking seas, as well as to the internal forces caused by the services for which the ship is designed.Unlike most other large engineering structures, the forces supporting the ship‘s hull as well as the loads which may be imposed upon it vary considerably, and in many cases, cannot be determined accurately.As a result, those responsible for the structural design of ships must be guided by established standards.Basic considerations

The problem of the development of a satisfactory structure generally involves the following considerations:

1.It is necessary to establish the sizes of, and to combine effectively, the various component parts so that the structure, with a proper margin of safety, can resist the major overall stresses resulting from longitudinal and transverse bending.2.Each component part must be so designed that it will withstand the local loads imposed upon it from water pressure, breaking seas, the weight of cargo or passenger, and other superimpose loads such as deckhouses, heavy machinery, masts, and so on, including such additional margins as sometimes may be required to meet unusually severe conditions encountered in operation.Rules of classification societies

The various classification societies have continued to modify and improve their rules to keep pace with the records of service experience, an increasing amount of research, and the constantly growing understanding of the scientific principles involved.In the modern rules of the societies, the designer has available to him formulas and tables of scantlings, dimensions of framing shapers, and thicknesses.These are directly applicable to practically all the ordinary types of sea-going merchant vessel being built today, and contain a flexibility of application to vessels of special types.The design of structural features of a merchant ship is greatly influenced by the rules of classification societies;in fact, the principal scantlings of most merchant ships are taken directly from such rules.Scantling are defined as the dimensions and material thicknesses of frames, shell plating, deck plating, and other structures, together with the suitability of the means for protecting openings and making them sufficiently watertight or weathertight.The classification society rules contain a great deal of useful information relating to the design and construction of the various component parts of a ship‘s structure.Scantling can be determined directly from the tables given in these publications.In many cases, a good conception of the usual ―good-practice‖ construction can also be gleaned from the sketches and descriptive matter available from the classification societies.(From ―McGraw-Hill Encyclopedia of Science and Technology‖, Vol.12.1982)Ship stresses

The ship at sea or lying in still water is being constantly subjected to a wide variety of stresses and strains, which result from the action of forces from outside and within the ship.Forces within the ship result from structural weight, cargo, machinery weight and the effects of operating machinery.Exterior forces include the hydrostatic pressure of the water on the hull and the action of the wind and waves.The ship must at all times be able to resist and withstand these stresses and strains throughout its structure.It must therefore be constructed in a

manner, and of such materials, that will provide the necessary strength.The ship must also be able to function efficiently as a cargo-carrying vessel.The various forces acting on a ship are constantly varying as to their degree and frequency.For simplicity, however, they will be considered individually and the particular measures adopted to counter each type of force will be outlined.The forces may initially be classified as static and dynamic.Static forces are due to the

Fig.1 Ship movement------the six degrees of freedom differences in weight and buoyancy which occur at various points along the length of the ship.Dynamic forces result from the ship‘s motion in the action of the wind and waves.A ship is free to move with six degrees of freedom—three linear and three rotational.These motions are described by the terms shown in Figure.1.These static and dynamic forces create longitudinal, transverse and local stresses in the ship‘s structure.Longitudinal stresses are greatest in magnitude and result in bending of the ship along its length.Fig.2 Static loading of a ship‘s structure

Longitudinal stresses

Static loading

If the ship is considered floating in still water, two different forces will be acting upon it along its length.The weight of the ship and its contents will be acting vertically downwards.The buoyancy or vertical component of hydrostatic pressure will be acting upwards.In total, the two forces exactly equal and balance one another such that the ship floats at some particular draught.The centre of the buoyancy force and the centre of the weight will be vertically in line.However, at particular points along the ship‘s length the net effect may be an access of buoyancy or an excess of weight.This net effect produces a loading of the structure, as with a beam.This loading results in shearing forces and bending moments being set up in the ship‘s structure which tend to bend it.The static forces acting on a ship‘s structure are shown in Figure 2(a).This distribution of weight and buoyancy will also result in a variation of load, shear forces and bending moments along the length of the ship, as shown in Figure 2(b)-(d).Depending upon the direction in which the bending moment acts, the ship will bend in a longitudinal vertical plane.The bending moment is known as the still water bending moment(SWBM).Special terms are used to describe the two extreme cases: where the buoyancy amidships exceeds the weight, the ship is said to ―hog‖, and this condition is shown in Figure 3, where the weight amidships exceeds the buoyancy, the ship is said to ―sag‖, and this condition is shown in Figure 4.Excess of buoyancy

Fig.3 Hogging condition

Excess of weight

Fig.4 Sagging condition Dynamic loading If the ship is now considered to be moving among waves, the distribution of weight will be the same.The distribution of buoyancy, however, will vary as a result of the waves.The movement of ship will also introduce dynamic forces.The traditional approach to solving this problem is to convert this dynamic situation into an equivalent static one.To do this, the ship is assumed to be balanced on a static wave of trochoidal form and length equal to the ship.The profile of a wave at sea is considered to be a trochoid.This gives waves where the crests are sharper than the throughts.The wave crest is considered initially at midships and then at the ends of the ship.The maximum hogging and sagging moments will thus occur in the structure for the particular loaded condition considered, as shown in Figure 5.Still water

Wave trough amidships

篇6:船舶轮机专业介绍

培养目标:

课程设置:

上一篇:东园中心小学学校工作计划下一篇:帮困结对送温暖