船舶制造英语日常用语 一.

船体

1.You must weld and grind this area before painting.在油漆之前你必须把这个地方电焊修补、打磨好。

2.This welding line should be gouged and welded again before tightness inspection.这条焊缝在密性检查前要碳刨、再焊。

3.The structure of the starboard side is different from the port side.右舷的结构跟左舷的不一样。

4.We should reinforce the downside of the windlass.我们应该在锚机的反面加强。

5.The navigation deck is not plain, we will fair the deck by hot working.驾驶甲板不平,我们要火工校正。

6.There are two pieces of stiffeners and brackets must be replaced.有两块加强筋和肘板要换新。

7.Two more footrests and handgrips should be installed at the entrance of the small hatchcover.在小舱口盖的进口处再安装两只踏步和拉手。

8.Checking the joint accuracy and structure integrity between No.8 and No.9 block after closed.No.8 与No9分段合拢后大接头装配精确性和结构完整性检查。

9.Checking structure integrity of superstructure(deckhouse)after welding.上层建筑焊后结构完整性检查。

10.Inspecting fitting accuracy of hatch coaming on board.货舱口围板船上安装精度检查。

11.Inspection air pressure test(with water head)for No1.water ballast tank(No15 block).No1压载水舱(No.15分段)气压试验(压头试验)检查。12.

Inspection hosing test for upper deck.上甲板冲水试验检查。

13.Measuring hull’s main dimensions: length overall(LOA.),length between perpendiculars(LPP.),breath molded(B.),depth molded(D.)and deflection before launching.下水前测量船体主尺度:总长、两柱间长、型宽、型深、基线挠度。

14.Inspection distance between draught marks and keel plate after marking out.划线后检查吃水标尺至平板龙骨之间的距离。

15.Inspecting fitting accuracy of draught mark(loading line mark).吃水标志(载重线标志)安装精确性检查。

16.Inspection welding seam and dimension of cargo hatch cover.货舱舱口盖焊缝和尺度检查。二.

轮机

船舶制造英语日常用语

1.Inspection machining dimension of propeller shaft(intermediate shaft or counter shaft).螺旋桨轴(中间轴)机加工尺寸检查。

2.Check for surface contact area(metallic contact)between stern shaft and propeller hub tapers.检查螺旋桨轴与螺旋桨锥度接触面。

3.Inspection machining dimension of rudder stock.舵杆机加工尺寸检查。

4.Inspection rudder carrier after assembly.上舵承组装后检查。

5.Inspection machining dimension of rudder pintle.舵销机加工尺寸检查。

6.Inspection alignment of stock, rudder blade and pintle.舵杆、舵叶、舵销连接后中心线检查。7.

Lowering test and tension test of anchor.锚投掷试验和拉力试验。

8.Measuring dimension of shaft coupling bolts and reamer hole.轴系连接螺栓和钻孔尺寸测量。

9.Inspection installation correctness of ship’s name plate(funnel mark).船名牌(烟囱标志)安装正确性检查。

10.Flexibility and hosing test for small water tight hatch cover(water tight door and window).水密小舱口盖(水密门、窗)启闭灵活性、冲水检查。

11.Tightness test(opening and closing test,emergency opening and closing test)for cargo hatch cover.货舱舱口盖密性试验(启闭试验、应急启闭试验)。12.

Inspecting anchor throwing away appliance.弃锚装置检查。

13.Inspecting centerline positioning for shaft system and rudder system before boring.轴、舵系镗孔前中心线定位检查。

14.Optical aligned check for shaft system after boring.轴系镗孔后光学校中检查。

15.Hydraulic test for L.O.pipe for stern tube.艉轴管滑油液压试验。

16.Measuring diameter of fore and aft stern tube bearing and bushes.艉轴管前、后轴承与衬套直径测量。

17.Inspection push-up load for fore and aft stern tube bushes.艉轴管前、后衬套压入检查。

18.Measuring clearance between propeller shaft & bearing.螺旋桨轴与轴承间隙测量。

19.Flushing L.O.system of stern tube.艉轴管滑油系统的投油清洗。

20.Inspecting zero(datum)position of rudder blade.舵叶0位检查。

21.Measuring clearance of rudder jumping stopper.船舶制造英语日常用语

舵止跳块的间隙测量。

22.Inspecting integrity of steering gear.操舵装置完整性检查。

23.Measuring installation clearance of rudder bearing.舵轴承安装间隙测量。

24.Flushing of piping system for steering gear.舵机管路系统的投油清洗。

25.Mooring test of steering gear.舵机系泊试验。

26.Manoeuving test of steering gear during sea trial.舵机航行中操舵试验。

27.Emergency manoeuving test of steering gear.舵机应急操舵试验。

28.Installation and alignment inspection of windlass.锚机安装与校中检查。

29.Anchoring and weighing test of windlass on sea trial.锚机航行中抛起锚试验。

30.Adjusting safety device for hydraulic system of steering gear(windlass、mooring winch).舵机(锚机、绞缆机)液压系统安全装置调整。

31.Running test and loading test for 4t provision crane.4吨食物吊运转试验和吊重试验。

32.Lowering and hoisting test for life boat.救生艇收放试验。

33.Loading test of accommodation ladder(pilot ladder).舷梯(引水员梯)压重试验。

34.Checking liner of main engine(M.E.).主机垫片检查。

35.Tightening inspection for through bolts of main engine(M.E.).主机贯穿螺栓紧固度检查。

36.Aligning main engine’s crank shaft and intermediate shaft after launching.下水后主机曲轴和中间轴连接后校中。

37.Aligning intermediate shaft and propeller shaft after launching.下水后中间轴和螺旋桨连接后校中。

38.Measuring deflection of crank shaft of M.E.before starting up(after sea trial).主机动车前(航行试验后)曲轴甩档测量。

39.Flushing lubrication oil(fuel oil)system of M/E.主机滑油(燃油)管路投油清洗。

40.Alignment inspection installation of shaft generator and gear box.轴带发电机及齿轮箱安装检查。

41.Alarm testing and safety device testing of M/E.主机报警和安全装置试验。

船舶制造英语日常用语

42.Mooring test(sea trial)of M.E.and inspection attached pumps and piping system.主机系泊(航行)试验并检查其附属泵与管路。

43.Running test of shaft generator and clutching test between M.E.and shaft generator.轴带发电机运转试验及主机与轴带发电机之间的离合器的效用试验。

44.Change over test between shaft generator and diesel generator on sea trial.航行试验中轴带发电机与柴油发电机之间的换车试验。45.

Overhauling main engine after sea trial.主机航行试验后的拆检。

46.Installation inspection of main diesel generator.主柴油发电机组安装检查。

47.Safety device testing for emergency diesel generator.应急柴油发电机的安全装置试验。

48.Charging test and safety valve and automatic device adjusting for main compressor(auxiliary compressor).主(辅)空气压缩机的充气试验、安全阀和自动装置的调整。

49.Air tightness test and safety valve adjusting for main air receiver(control air receiver, air horn receiver)on board.主空气瓶(控制空气瓶、汽笛空气瓶)装船后气密试验和安全阀的调整。50.

Safety valve adjusting and accumulating test for auxiliary boiler.辅锅炉安全阀检验及蓄压试验。

51.Air tightness test for auxiliary boiler(economize boiler)on board.辅锅炉(废气锅炉)装船后气密试验。

52.Automatic controller test for auxiliary boiler.辅锅炉自动控制装置试验。

53.Function test for economizer.废气锅炉效用试验。

54.Function test and automatic controller test for ballast pump.压载泵效用试验和自动控制装置试验。

55.Function test of bilge oily water separator(sewage treatment plant, fresh water generator, incinerator).舱底水油水分离器(污水处理装置、制淡装置、焚烧炉)效用试验。三.

电气

1.Inspection main cable installation for wheel house before paneling decoration.敷板前驾驶室检查主干电缆安装.2.

Measuring insulation resistance and reliability test protection device for main switchboard(emergency switchboard).总配电板(应急配电板)绝缘电阻测量和保护装置可靠性试验。

3.Load and performance test for main generator(emergency generator).主发电机(应急发电机)负荷及特性试验。

4.Automatic governing test of voltage and frequency for main generator(emergency generator).主发电机(应急发电机)电压、频率自动调节试验。5.

Parallel-running test for main generator.主发电机并联运行试验。

6.Diesel generator voltage characteristic test.船舶制造英语日常用语

柴油发电机电压特性试验。

7.Diesel generator governor sensitivity test.柴油发电机调速特性试验。

8.Test for taking on a full load suddenly.突加负荷试验。

9.Reverse power relay trip test.逆功率脱扣试验。

10.Over-current relay test.过电流脱扣试验。

11.Under voltage tripping test.低压脱扣试验。

12.Interlocking reliability test.联锁试验。

13.Load test for shaft generator and its function test on sea trial.轴带发电机负荷试验和航行时效用试验。

14.Automatic supply test of emergency generator.应急发电机自动供电试验。

15.Calibrating rudder angle indicator.舵角指示器校准。

16.Remote starting and alarm test for steering gear motor.舵机马达遥控起动和报警试验。17.

Function test automatic pilot.自动舵效用试验。

18.Sequence starting and automatic exchange of motors for auxiliary machine and pump.辅机和泵的电动机程序起动和自动转换。

19.Charge and discharge operation test for battery and charge equipment.蓄电池和充电装置的充放电试验。

20.Operation test of emergency switching-off device for oil pump and ventilator(bilge pump)in engine room.机舱风、油(舱底泵)应急切断装置操作试验。

21.Remote control test for fire pump and emergency fire pump.消防泵、应急消防泵遥控操作试验。22.

Function test of fog horn.雾笛效用试验。

23.Inspection installation and water tightness transducer of echo sounder on berth.测深仪换能器船台安装和水密性检查。

24.Function test and adjust error for log on sea trial.航行试验中计程仪效用试验及误差调整。

25.Function test and calibration self-heterodyne curve for direction finder on sea trial.航行试验中测向仪效用试验及自差曲线校正。

26.Inspection installation for antenna of radio console and measuring its insulation resistance.组装报务台天线安装检查和绝缘测量。

27.Function test of radio console on sea trial.航行试验中组装报务台效用试验。

船舶制造英语日常用语

28.Calibration constant error and function for gyro-compass on sea trial.航行试验中电罗经固定误差校正和效用试验。

29.Function test of radar on sea trial(mooring test).航行试验(系泊试验)中雷达效用试验。

30.Simulating(Automatic)alarm test for fire detector.火警检测器模拟(自动)报警试验。

31.The items are tested according to mooring test program as following : 下列项目按系泊试验大纲进行系泊试验:

32.Function test of engineer calling device(call device in hospital).轮机员呼叫(病室呼叫)装置试验。

33.Function test of ultra-short wave radio telephone.超短波对讲机。

34.Function test of remote control system of main engine.主机遥控系统性能试验。

35.UMS(unattended machinery space)sea trial continue 4~6 hours.无人机舱作4~6小时航行试验。

36.Measuring insulation resistance for circuit.电路绝缘电阻测量。

37.Function test for weather facsimile receive.气象传真机效用试验。四.

上层建筑

1.A/C duct and vent duct structure of W/H Deck.驾驶甲板空调、机械风管结构。

2.Inspection the structure and loading test of the lifeboat(Rescue boat)davit.救生(助)艇吊架结构和压重试验。

3.Ref.Freon piping to be done air-tightness test and vacuum test.冷藏氟利昂管系密性试验和真空试验。

4.Ref.Plant to be done protection device test and cooling-down test.冷藏机组保护装置试验及打冷试验。

5.Accommodation air-condition Freon piping to be done air-tightness and vacuum test.房舱空调氟利昂管系密性试验和真空试验。

6.Accommodation to be done air flowing adjustment test.房舱风量调整试验。

7.E/C room Package A-C to be done function test.集控室单位式空调效用试验。

8.E/R air drier to be done function test and alarm test.机舱空气干燥器效用试验及报警试验。

9.Superstructure water-tightness doors and windows to be done hosing test.上层建筑水密门窗冲水试验。

10.Cabin supply fan to be done function test.房舱风机效用试验。

11.Superstructure lifesaving and fire fighting equipment to be done inspection.上层建筑救生、消防设备交验。

船舶制造英语日常用语

12.Galley and laundry equipment to be done function.厨房、洗衣间设备交验。

13.Refrigerator to be done function test.冰箱效用试验。

14.Rescue boat davit(life raft davit)to be done static(dynamic)loading test.救助艇架(救生筏吊架)静(动)负荷试验。

15.Mushroom outlet closing and opening by hand to be inspected.菌形风帽手动启闭试验。

16.Superstructure compressed air(water supply、fire fighting、smoke detection)piping to be done air-tightness test.上层建筑压缩空气管系(供水管、消防管、烟雾探测管)密性试验。17.

Cabin condensation piping to be done free-flowing test.房舱凝水、落水管系畅通试验。

18.Deck flushing piping system to be done air-tightness test.甲板冲洗管系密性试验。

19.Painting RM.Fire fighting pipe to be done air-tightness test.油漆间消防管系密性试验。

20.W/H water spray pipe to be done function test.驾驶室水喷淋管系效用试验。

21.Insulation of A-deck(including A60 insulation).A甲板绝缘(包括A甲板A60绝缘)。22.

Floating floor of E/C RM.集控室浮动地板。

23.Insulation of emergency generator room(including A60 insulation).应急发电机室绝缘(包括应急发电机室A60绝缘)。24.

Insulation of escape in E/R.(including A60 insulation).机舱逃口绝缘(包括机舱逃口A60绝缘)。

25.Insulation of F11# bulkhead in E/R.(including A60 insulation).F11#舱壁绝缘(包括F11#舱壁A60绝缘)。26.

Completeness of all cabins to be inspection.全船房舱完整性提交。

27.Inspection insulation installation for master room, Chief engineer room,electrical engineer room before install panel.船长室、轮机长室、电机员室上板前检查隔热安装。

28.Completeness delivery of accommodation(joiner work and interior decoration of accommodation)for master room(chief engineer room).船长室(轮机长室)舱室完整性(木工和内部装饰)提交。

船检业务用英语

1、船体

1.56分段完工后结构完整性和焊缝检查

Inspection structure integrity and welding seam on completing No.56 block.船舶制造英语日常用语

2.上层建筑完后结构完整性检查

Inspection structure integrity after completing the superstructure.3.No.8 与No9分段合拢后大接头装配精确性和结构完整性检查

Checking the joint accuracy and structure integrity between No.8 and No.9 block after closed.4.上层建筑合拢后结构完整性检查

Checking structure integrity of superstructure(deckhouse)after closed.5.货舱口围板船上安装精度检查

Inspecting fitting accuracy of hatch coaming on berth.6.货舱口围板焊接后焊缝检查

Inspecting welding seam of hatch coaming after welding.7.No1压载水舱(No.15分段)气压试验(压头试验)检查

Inspection air pressure test(with water head)for No1.ballast water tank(No15 block).8.上甲板冲水试验检查 Inspection hosing test for upper deck.9.下水前测量船体主尺度、总长、两柱间长、型宽、型深、基线挠度

Measuring hull’s main dimensions:length overall(LOA.),length between perpendiculars(LPP.),breath molded(B.mld.),depth molded and deflection before launching.10.划线后检查吃水标尺至平板龙骨之间的距离

Inspection distance between draught marks and keel plate after marking out.11.吃水标志(载重线标志)安装后精确性检查 Inspecting fitting accuracy of draught mark(loadline mark).12.载重线标志划线后检查尺度

Inspection dimension of loadline after marking out.13.舵叶完工后检查

Checking rudder after completing(finished).14.货舱舱口盖焊缝和尺度检查

Inspection welding seam and dimension of cargo hatch cover.2、轮机内场

1.螺旋桨轴(中间轴)机加工尺寸检查

Inspection machining dimension of propeller shaft(intermediate shaft or counter shaft).2.检查螺旋桨轴与螺旋桨锥度接触面

Check for surface contact area(metallic contact)between stern shaft and propeller hub tapers.3.舵杆机加工尺寸检查

Inspection machining dimension of rudder stock.4.上舵承组装后检查

Inspection rudder carrier after assembly.5.舵销机加工尺寸检查

Inspection machining dimension of rudder pintle.6.舵杆、舵叶、舵销连接后中心线检查 Inspecting alignment of stock, rudder blade and pintle.7.锚投掷试验和拉力试验

船舶制造英语日常用语

Lowering test and tension test of anchor.8.轴系连接螺栓和孔尺寸测量

Measuring dimension of coupling bolts and reamer hole.3、轮机外场安装(钳工)1.防蚀板布置正确性检查

Inspection arrangement correctness of aluminium Anodes.2.船名牌(烟囱标志)安装正确性检查

Inspection installation correctness of ship’s name plate(funnel mark).3.水密小舱口盖(水密门、窗)启闭灵活性检查

Flexibility and hosing test for small water tight hatch cover(water tight door and window).4.货舱舱口盖密性试验(启闭试验、应急启闭试验)

Tightness test(opening and closing test,emergency opening and closing test)for cargo hatch cover.5.弃锚装置检查

Inspecting anchor throwing away appliance.6.轴、舵系镗孔前中心线定位检查

Inspecting centerline positioning for shaft system and rudder system before boring.7.轴系镗孔后光学校中检查

Optical aligned check for shaft system after boring.8.艉轴管滑油液压试验

Hydraulic test for L.O.pipe for stern tube.9.艉轴管前、后轴承与衬套直径测量

Measuring diameter of fore and aft stern tube bearing and bushes.10.艉轴管前、后衬套压入检查

Inspection push-up load for fore and aft stern tube bushes.11.螺旋桨轴与轴承间隙测量

Measuring clearance between propeller shaft & bearing.12.螺旋桨压入检查 Inspection wet fitting the propeller.13.艉轴密性装置的安装与密性试验

Fitting and tightness testing of propeller shaft before launching(after sea trial).14.艉轴管滑油系统的投油清洗 Flushing L.O.system of stern tube.15.舵叶0位检查

Inspecting zero(datum)position of rudder blade.16.舵装置完整性与轻便性检查

Inspecting integrity and flexibility of rudder appliance.17.舵止跳块的间隙测量

Measuring clearance of rudder jumping stopper.18.操舵装置完整性检查

船舶制造英语日常用语

Inspecting integrity of steering gear.19.舵轴承安装间隙测量

Measuring installation clearance of rudder bearing.20.舵机管路系统的投油清洗 Flushing of piping system for steering gear.21.舵机系泊试验 Mooring test of steering gear.22.舵机航行中操舵试验

Manoeuving test of steering gear during sea trial.23.舵机应急操舵试验

Emergency manoeuving test of steering gear.24.锚机管路系统的投油清洗 Flushing of piping system for windlass.25.锚机安装与校中检查

Installation and alignment inspection of windlass.26.锚机系泊试验 Mooring test of windlass.27.锚机航行中抛起锚试验

Anchoring and weighting test of windlass on sea trial.28.绞缆机完整性检查 Inspection integrity of mooring winch.29.绞缆机管路系统的投油清洗 Flushing of piping system for mooring winch.30.绞缆机系泊试验 Mooring test of mooring winch.31.舵机(锚机、绞缆机)液压系统安全装置调整

Adjusting safety device for hydraulic system of steering gear(windlass、mooring winch).32.4吨食物吊运转试验和吊重试验 Running test and hoisting test for 4t provision crane.33.救生艇收放试验

Lowering and hoisting test for life boat.34.救生艇航行试验 Sea trial for life boat.35.舷梯(引水员梯)压重试验

Loading test of accommodation ladder(pilot ladder).36.舷梯(引水员梯)和绞车收放试验

Lowering and hoisting test of accommodation ladder(pilot ladder).37.货舱舱口盖启闭试验

Opening and closing test for cargo hatch cover.38.货舱舱口盖应急启闭试验

Emergency opening and closing test for cargo hatch cover.39.水密小舱口盖(水密门、窗)启闭灵活性检查和冲水试验

Flexibility and hosing test for small water tight hatch cover(water tight door and window).船舶制造英语日常用语

40.主机垫片检查

Checking liner of main engine(M.E.).41.主机贯穿螺栓紧固度检查

Tightening inspection for through bolts of main engine(M.E.).42.下水后主机曲轴和中间轴连接后校中

Aligning main engine’s crank shaft and intermediate shaft after launching.43.下水后中间轴和螺旋桨连接后校中

Aligning intermediate shaft and propeller shaft after launching.44.主机动车前(航行试验后)曲轴甩档测量

Measuring deflection of crank shaft of M.E.before starting up(after sea trial).45.主机滑油(燃油)管路投油清洗 Flushing lubrication oil(fuel oil)system of M/E.46.轴带发电机及齿轮箱安装检查

Alignment inspection installation of shaft generator and gear box.47.主机报警和安全装置试验 Alarm testing and safety device testing of M/E.48.主机系泊(航行)试验并检查其附属泵与管路

Mooring test(sea trial)of M.E.and inspection attached pumps and piping system.49.轴带发电机运转试验及主机与轴带发电机之间的离合器的效用试验 Running test of shaft generator and clutching test between M.E.and shaft generator.50.航行试验中轴带发电机与柴油发电机之间的换车试验 Change over test between shaft generator and diesel generator on sea trial.51.主机航行试验后的拆检 Overhauling main engine after sea trial.52.主柴油发电机组安装检查 Installation inspection of main diesel generator.53.主柴油发电机动车前(系泊试验后)曲轴甩档测量

Measuring deflection of crank shaft of main diesel generator before running test(after sea trial).54.主柴油发电机的报警和安全装置试验 Alarm and safety device testing of main diesel generator.55.主柴油发电机运转试验 Running test of main diesel generator.56.应急柴油发电机运转试验

Running test of emergency main diesel generator.57.应急柴油发电机的安全装置试验 Safety device testing for emergency diesel generator.58.主(辅)空气压缩机的充气试验、安全阀和自动装置的调整

Charging test and safety valve and automatic device adjusting for main compressor(auxiliary compressor).59.应急空气压缩机的运转试验、安全阀和安全装置的调整

Running test and safety valve and safety device adjusting for emergency compressor.60.主空气瓶(控制空气瓶、汽笛空气瓶)装船后气密试验和安全阀的调整

船舶制造英语日常用语

Air tightness test and safety valve adjusting for main air receiver(control air receiver, air horn receiver)on board.61.辅锅炉(废气锅炉)装船后气密试验

Air tightness test for auxiliary boiler(economize boiler)on board.62.辅锅炉安全阀检验及蓄压试验

Safety valve adjusting and accumulating test for auxiliary boiler.63.辅锅炉自动控制装置试验 Automatic controller test for auxiliary boiler.64.废气锅炉效用试验 Function test for economizer.65.压载泵效用试验和自动控制装置试验 Function test and automatic controller test for ballast pump.66.舱底水油水分离器(污水处理装置、制淡装置、焚烧炉)效用试验

Function test of bilge oily water separator(sewage treatment plant, fresh water generator, incinerator).67.机舱行车吊重试验 Hoisting test of engine room crane.68.机修间设备运转试验 Running test of machines in repair room.无线电话

radio telephone 电视机和收音机

TV and radio set 电视机和收音机天线共用器

antenna multi coupler of TV and radio set 电罗经

gyro compass 磁罗经

magnetic compass 电脉冲

electrical impulse 应急电站

emergency power station 扬声器

loud speak 继电器

relay contact 配电板

switch board 配电箱

distribution box 变压器

transformer 保险丝

fuse 蜂鸣器

buzzer

69.敷板前驾驶室检查主干电缆安装

Inspection main cable installation for wheel house before paneling decoration.70.总配电板(应急配电板)绝缘电阻测量和保护装置可靠性试验

Measuring insulation resistance and reliability test protection device for main switchboard(emergency switchboard).71.主发电机(应急发电机)负荷及特性试验

Load and performance test for main generator(emergency generator).72.主发电机(应急发电机)电压、频率自动调节试验

船舶制造英语日常用语

Automatic governing test of voltage and frequency for main generator(emergency generator).73.主发电机并联运行试验 Parallel-running test for main generator.74.柴油发电机电压特性试验 Diesel generator voltage characteristic test.75.柴油发电机调速特性试验 Diesel generator governor sensitivity test.76.突加负荷试验

Test for taking on a full load suddenly.77.逆功率脱扣试验 Reverse power relay trip test.78.过电流脱扣试验 Over-current relay test.79.低压脱扣试验 Under voltage tripping test.80.联锁试验 Interlocking reliability test.81.二台主发电机负荷转移试验

Testing load charge-over between two main generator.82.轴带发电机负荷试验和航行时效用试验 Load test for shaft generator and its function test on sea trial.83.应急发电机自动供电试验 Automatic supply test of emergency generator.84.舵角指示器校准 Calibrating tudder angle indicator.85.舵角电动机遥控起动和报警试验 Remote starting and alarm test for steering gear motor.86.自动舵效用试验 Function test automatic pilot.87.锚机(舵机)电动机运转试验 Running test of motor for windless(steering gear).88.辅机和泵的电动机程序起动和自动转换

Sequence starting and automatic exchange of motors for auxiliary machine and pump.89.蓄电池和充电装置的充放电试验

Charge and discharge operation test for battery and charge equipment.90.机舱风、油(舱底泵)应急切断装置操作试验

Operation test of emergency switching-off device for oil pump and ventilator(bilge pump)in engine room.91.消防泵、应急消防泵遥控装置操作试验

Operation test of remote control device for fire pump and emergency fire pump.92.雾笛效用试验 Function test of fog horn.船舶制造英语日常用语

93.测深仪的换能器船台安装和水密性检查

Inspection installation and water tight transducer of echo sounder on berth.94.测深仪效用试验 Function test of echo sounder.95.计程仪水下部分船台安装和水密性检查

Inspection installation and water tight for log’s underwater parts on berth.96.航行试验中计程仪效用试验及误差调整 Function test and adjust error for log on sea trial.97.测向仪环状天线船台安装检查

Inspection installation for loop antenna of direction finder on berth.98.航行试验中测向仪效用试验及自差曲线校正

Function test and calibration self-heterodyne curve for direction finder on sea trial.99.组装报务台天线安装检查和绝缘测量

Inspection installation for antenna of radio console and measuring its insulation resistance.100.发讯机调谐表制表 Scheduling tuning chart of transmitter.101.航行试验中组装报务台效用试验 Function test of radio console on sea trial.102.航行试验中电罗经固定误差校正和效用试验 Calibration constant error and function for gyro compass on sea trial.103.航行试验(系泊试验)中雷达效用试验 Function test of radar on sea trial(mooring test).104.传感器报警设定值模拟试验 Simulating alarm test for fire detector.105.火警检测器自动报警试验 Automatic alarming test for fire detector.106.下列项目按系泊试验大纲进行系泊试验

The items are tested according to mooring test program as following as: 107.轮机员呼叫装置试验 Function test of engineer calling device.108.病室呼叫装置试验

Function test of calling device in hospital.109.超短波对讲机

Function test of ultra-short wave radio telephone.110.主机遥控系统性能试验

Function test of remote control system of main engine.111.无人机舱作4~6小时航行试验

UMS(unattended machinery space)sea trial continue 4~6 hours.112.电路绝缘电阻测量

Measuring installation resistance for circular.113.气象传真机效用试验

Function test for weather facsimile receive.船舶制造英语日常用语

6.内装

1.驾驶甲板空调、机械风管结构 A/C duct and vent duct structure of W/H Deck.2.A甲板空调、机械风管结构 A/C duct and vent duct structure of A-Deck.3.主甲板空调、机械风管结构 A/C duct and vent duct structure of Main Deck.4.救生(助)艇吊架结构和压重试验

Inspection the structure and loading test of the lifeboat(Rescue boat)davit.5.冷藏氟利昂管系密性试验 Ref.Freon piping to be done air-tightness test.6.冷藏氟利昂管系真空试验 Ref.Freon piping to be done vacuum test.7.冷藏机组保护装置试验及打冷试验

Ref.Plant to be done protection divice test and cooling-down test.8.机舱风管结构交验 E/R vent duct structure to be inspected.9.房舱空调氟利昂管系密性试验

Accommodation air-condition freon piping to be done air-tightness test.10.房舱空调氟利昂管系真空试验

Accommodation air-condition freon piping to be done vacuum test.11.房舱风量调整试验

Accommodation to be done air-flow adjustment test.12.房舱空调机组保护装置试验及冷/热效用试验 Accommodation A-C plant to be done protection device test.13.集控室单位式空调效用试验 E/C RM.Package A-C to be done function test.14.机舱空气干燥器效用试验及报警试验 E/R air drier to be done function test and alarm test.15.救生(助)艇收放试验

Lifeboat(rescue boat)to be done lowering and hoisting test.16.上层建筑水密门窗冲水试验

Superstructure water-tightness doors and windows to be done hosing test.17.房舱风机效用试验

Cabin supply fan to be done function test.18.上层建筑救生、消防设备交验

Superstructure life-saving and fire fighting equopment to be done inspection.19.厨房、洗衣间设备交验

Galley and laundry equopment to be done function.船舶制造英语日常用语

20.下甲板逃口――水密门冲水试验 Low deck escape-water-tightness doors to be hose test.21.上层建筑风雨密门窗安装后检查

Inspection water-tightness doors and windows of superstructure after fitting.22.上层建筑通风门门片安装后检查

Inspection air outlet grilles of superstructure after fitting.23.通道门操作和密性试验

Lobby doors to be done operation test and tightness test.24.冰箱效用试验

Refrigerator to be done function test.25.救助艇航行试验 Rescue boat to be done sea trial test.26.救助艇架结构完整性交验

Structure completeness of rescue boat davit to be inspected.27.救助艇架(救生筏吊架)静负荷试验

Rescue boat davit(life raft davit)to be done static loading test.28.救助艇架(救生筏吊架)动负荷试验 Rescue boat davit(life raft davit)to be done dynamic test.29.艏部舱室(舵机房)风管结构交验

Vent duct structure of bow cabin(steering gear RM.)to be inspection.30.菌形风头手动启闭试验

Mushroom outlet closing and opening by hand to be inspected.7、内装(铜工)

1.上层建筑压缩空气管系密性试验

Superstructure compressed air piping to be done air-tightness test.2.上层建筑控制空气管系密性试验

Superstructure compressed control air piping to be done air-tightness test.3.上层建筑供水管系密性试验

Superstructure water supply piping to be done air-tightness test.4.上层建筑消防管系(包括应急消防管系)密性试验

Superstructure fire fighting piping(including emergency fire fighting piping)to be done air-tightness test.5.上层建筑烟雾报警管系密性试验

Superstructure smoke detection piping to be done air-tightness test.6.厨房CO2管系密性试验

Galley CO2 piping to be done air-tightness test.7.上层建筑疏排水管系密性试验

Superstructure drainage air piping to be done air-tightness test.8.房舱凝水、落水管系畅通试验 Cabin condense piping to be done free-flowing test.9.房舱蒸汽管系密性试验

船舶制造英语日常用语

Cabin steam piping system to be done air-tightness test.10.甲板冲洗管系密性试验

Deck flushing piping system to be done air-tightness test.11.油漆间消防管系密性试验

Painting RM.Fire fighting pipe to be done air-tightness test.12.驾驶室喷淋管系效用试验 W/H jetting pipe to be done function test.8、内装(木工)13.集控室浮动地板 Floating floor of E/C RM.14.集控室绝缘 Insulation of E/C RM.15.冷库地板绝缘 Insulation of Ref.RM.floor.16.冷库围壁绝缘 Insulation of Ref.RM.wall.17.冷库平顶绝缘 Insulation of Ref.RM.ceiling.18.冷库隔墙及顶大梁处绝缘

Insulation of separate wall and beam in Ref.RM.19.驾驶室浮动地板 Floating floor of W/H.20.主甲板浮动地板 Floating floor of main deck.21.驾驶室绝缘 Insulation of W/H.22.A甲板绝缘(包括A甲板A60绝缘)Insulation of A-deck(including A60 insulation).23.主甲板绝缘

Insulation of main deck(including A60 insulation).24.应急发电机室绝缘(包括应急发电机室A60绝缘)Insulation of emergency generator room(including A60 insulation).25.CO2室绝缘 Insulation of CO2 room.26.机舱逃口绝缘(包括机舱逃口A60绝缘)Insulation of escape in E/R.(including A60 insulation).27.F11#舱壁绝缘(包括F11#舱壁A60绝缘)Insulation of F11# bulkhead in E/R.(including A60 insulation).28.应急消防泵室绝缘(包括应急消防泵室A60绝缘)Insulation of emergency fire fighting pump RM.(including A60 insulation).船舶制造英语日常用语

29.舵机房绝缘 Insulation of steering gear RM.30.A甲板流平层敷料 Something deck covering of A-deck.31.主甲板流平层敷料 Something deck covering of main deck.32.驾驶甲板流平层敷料 Something deck covering of W/H deck.33.……舱室-围壁绝缘 One wall insulation of…… 34.全船储藏室完整性提交 Completeness of all locker to be inspection.35.全船房舱完整性提交 Completeness of all cabin to be inspection.36.船长室、轮机长室(电机员室)敷板前检查隔热安装

Inspection insulation installation for master room, Chief engineer room(electrical engineer room)before panel.37.船长室(轮机长室)舱室完整性(木工和内部装饰)提交

Completeness delivery of accommodation(joiner work and interior decoration of accommodation)for master room(chief engineer room).

篇2:英语作文 日常活动范文

我国当代教育家叶圣陶说:“什么是教育?就简单的说,一句话,就是要养成良好的习惯。”播种好习惯,收获好品质。良好习惯的培养,会使日常行为中表现出的“德行”逐渐累积为思想品德。行为习惯一旦形成,就成为一种内在的自律需要,就会变为引导和激励我们需要的精神力量。本学期我从要求学生“学会关心、学会学习、学会生活、学会做人”的指导思想出发,以小学生日常行为规范的养成教育为基本线索,围绕学生身边发生和在日常生活中的问题,通过一学期的活动,把学生逐步培养成为“讲卫生,讲文明”的好学生。

一、培养良好习惯的具体措施

1、召开学生动员会。学习《中小学生守则》、《小学生日常行为规范》。通过学习,使学生悟出道理,达到晓之以理的目的。

2、每天安排学生值日,一天三检查,一周一总结。表现好的就在行为习惯评价表中加一颗红色标志,表现不好的,就加一颗蓝色标志。这样一来,班风、显著改善。每天坚持晨读、中午集体唱歌、每天坚持练字、写日记,一点带面,使每个学生形成静心学习的习惯,把班级真正建设成“书声琅琅、歌声琅琅、笑声琅琅”的乐园,形成了良好的学习氛围和文明的生活环境。

二、良好习惯养成的关键所在:

1、高度重视,常抓不懈。小学生日常行为规范养成教育不是靠某个人就能办好的,它需要学校上上下下共同努力,还需要家庭和社会的齐抓共管。它也不是在一朝一夕中就能完成的,需要长期不懈的努力。

2、目标要一致。行为规范养成教育是一项系统工程,要注意横向和纵向之间的联系,各方面要求要协调一致,班级的要求与学校的要求要一致;任课教师的要求与班主任的要求要一致;低年级与高年级的要求要一致;家庭的要求与学校的要求要一致。否则的话,学生就会无所适从。

3、行为引导,反复训练。任何一种良好习惯的形成与巩固都要经过一个相当复杂的发展过程,小学生自制力和持久性差,因此,教师在向学生讲清“是什么,为什么,怎么做”的同时,还应狠抓行为的训练过程,可以根据训练内容进行专项训练,做到整改一条,巩固一条;再训练一条,再巩固更多。通过反复抓,抓反复,真正实现学生错误认识向正确认识的转化,再由正确认识向正确行为、良好习惯的转化。

4、师生相互学习、共同成长。儿童的行为是从模仿开始的,教师和家长要以身作则,凡是要求学生做到的,自己首先做到,时时处处为学生做表率。作为教师都要反省自己,看自己有哪些好习惯值得保持?看自己有哪些坏习惯需要矫正?

5、注重体验,激励带动。养成教育贵在主动发展。通过引导学生开展“争当优秀三好生”、“争当优秀少先队员”、“告别零食”、“小手牵大手,共创清洁园”等活动,引导学生在活动中感受道德、选择行为、进行自我批评与合作竞争,从而自觉遵守规范。与此同时,组织开展“学、比、评、查、奖”活动,树立典型,激励全体学生赶超先进。

6、家校配合,形成合力。“家庭是习惯的学校,父母是习惯的教师。”将通过召开家长会,建立家校联系手册的方式,指导和督促家长从自身做起,配合学校共同抓好对孩子的教育,形成家校合力、齐抓共管的局面。

通过一学期的努力,学生在日常行为规范方面有了可喜的进步,但作为班主任,不能放松,要常抓不懈,让每个孩子都真正地成为一个讲文明,讲礼貌,讲卫生,守纪律的好孩子。

小学生日常行为规范养成教育活动总结

篇3:英语作文 日常活动范文

问题的现状:

尽管写作在我们英语教学中占有重要的地位, 在高考中也占据很大的分值比重。但是还没有足够引起师生的足够重视。大多数老师写作方面也没有一个完整的教学计划, 他们很少有计划的训练学生的写作能力;而学生则最怕写英语作文, 他们往往冥思苦想却写不出内容, 即使写出内容, 也是句型单一, 错误百出。有时会听老师反映学生书写如何的差, 几乎没有正确的句子, 更是举出一些典型的错句与同事分享, 在大笑中反映了他们的无奈。同时每年参加阅读的笔者也发出感慨, 怎么现在看到的好作文越来越少了!由此可见改变这种局面已经刻不容缓了, 那么怎样加强作文训练和教学呢?笔者在日常教学工作中采取化整为零的方法去加强学生写作能力的训练。下面笔者就以牛津高中英语课本各种课型为例, 谈谈自己在日常教学工作的一些做法。

一、Learning words:

在学习英语单词时, 我不光要求学生记住单词意思, 能够默写上来, 同时还要求学生记住其词性是vt, vi还是adj等。如果是vt, vi我让学生记住这样的句型结构:S+V+O, S+V, S+V+Prep+O等等, 如果是adj则仅需记住S+be+adj.等等;然后我要求同学按照这样简单的句型造句。这样学生不但掌握了单词的用法, 而且能够熟练的掌握英语作文的最基本组成结构句子的写法。这样在一定程度上减少有大量同学不会写一个完整句子的情况。

二、Welcome the unit&Project:

此板块主要功能是激活学生与单元话题的、有关的语言知识, 引导学生联系自己的亲身经历进行相关的话题的讨论。生动的画面为该板块的语言学生设置了生动的语言情景, 能有效的引起学生对话题的兴趣, 调动了学生的积极性。Project板块则是通过在“do to learn”English, 设置任务来培养学生合作探究能力, 发展学生思维, 为学生终身发展奠定基础。我要求同学们根据大家所讨论的相关方面和根据学生完成任务的情况来写一个report, 并在课堂上分组做报告。这样对学生的讨论内容的再复习, 同时又对其写作能力的一个训练。例如笔者在教授牛津高中英语M5 unit1.Welcome to the unit时, 在讨论完相关内容时, 我要求学生写一篇以“What is the best friend like in your heart?”为题的小短文。下堂课开始做一个report.这样不但锻炼了学生的写作能力, 而且培养了学生的发散思维, 还让学生接受了美育教育, 可谓一举三得啊!

三、Grammar and usage:

一般来说语法课老师是按learn—practice—consolidation流程去做的。学生往往能够会做选择题, 很少同学能够做到“用”语法到作文中去。笔者认为语法可是写好一篇好作文的关键。为什么了呢?通常来说, 我们老师在批阅作文时认定一篇优秀作文, 通常主要有以下几个方面:

1.书法好2.有正确的不同时态3.有几个高级的句型如名词性从句, 定语从句, 非谓语动词等等。笔者讲授完非谓语动词, 时态, 语态, 名词性从句等语法后, 特别注重学生对其运用能力的检查。

四、Reading:

英国著名作家斯蒂文森谈学习写作的经验时说过, 学习写作除多练以外, 还要多模仿。仿写既能反馈出学生对课文的体裁及重要句型的掌握程度, 又能促进学生对课文所用语言材料的系统掌握, 取得举一反三的效果。那么, 要求学生模仿什么呢?

1.仿写课文思路

仿写最重要的是模仿思路。比如, 记叙文要有贯穿全文的线索, 以使事件或故事发生、发展的脉络清楚;描写文要有合理的逻辑顺序, 其展开的顺序要符合认识规律, 反映由具体到抽象au、由浅到深的思维过程;说明文要选择合适的角度, 按照一定的时间或空间顺序来说明事物。只有掌握了各种文体的写作思路, 学生在写作时才能做到思路清晰, 层次分明。

2.仿写课文结构

高中英语写作的文体主要是记叙文、议论文等, 在仿写时, 要注意学习其结构特点。如记叙文, 多采用三段式的谋篇布局形式, 并采用顺叙的方法。第一段交代时间、地点和人物, 第二段交代事件发生的过程, 第三段叙述事件的结果。议论文也多采用三段式:第一段摆出论题, 第二段列出正方观点, 第三段列出反方观点。也可采用四段式:第一段摆出论题, 第二段列出正方观点, 第三段列出反方观点, 第四段展示作者自己的观点。了解了这些文体结构之后, 学生才有可能写出结构紧凑的文章来。

3.仿写课文句式

课文中常出现许多习惯表达方式和一些特殊句式, 还有一些适合某些特定情景、场合的常用句子, 教师要向学生多强调、示范。特别是一些常用于文章开头、结尾和中间起承接作用的惯用语, 要让学生多练习, 并能运用到写作中去。

篇4:描写日常生活的作文素材(范文)

奶奶虽然退休了,但并不寂寞,每天抱着小孙女,领着她捉迷藏,享尽了天伦之乐。

颠着小脚、拄着拐棍儿的老奶奶,悄悄地在我的包里放进几个鸡蛋,那是攒了好多天用来换盐的:“闺女,啥时候奶奶能看着你回来就好了……”

妈妈夹起一大块鱼肉,细心地摘掉上边的刺儿,恭敬地送到奶奶的碗里。郑州房产网,全家人众星捧月似的,把奶奶团团围住,高兴地拍手唱起“祝你生日快乐……”

雪地里,留下一串脚印,我蓦然转过身,爷爷、奶奶站在门前,向我依依不舍地挥着手。

奶奶戴着老花镜,絮絮叨叨,替我钉好纽扣,随手又在我的小屁股上不轻不重地拍了几下。

妈妈和奶奶正坐在客厅里谈话,说说笑笑,婆媳俩好不亲热。

在爸爸外出采访的日子里,全家人一直提心吊胆,妈妈、奶奶一直吃不好饭,睡不好觉。

别看“家庭晚会”只有我们一家三口,可节目却精彩纷呈,高潮迭起,比起中央电视台的春节晚会也毫不逊色。

“夫人,学习到此结束,请用餐!”爸爸替妈妈合上书,然后学着西方绅士的派头,潇洒地做了一个“请”的姿势。

爷爷在地里流着汗干活,我把水壶拎到田边,把水倒进碗里,端给爷爷喝,还为他擦去满头的汗。

我明白,这100元决不是普通的100元,它凝聚着爷爷多少个日日夜夜的辛劳,凝聚着爷爷对孙儿多少期盼!我捧着这沉甸甸的钱,在心里对爷爷说道:“我的好爷爷,我不会让你失望的!”

妈妈正在聚精会神地思考着,我伸了伸舌头,蹑手蹑脚地爬回到床上。

回到家以后,我就像老鼠见了猫一样,处处躲着爸爸,爸爸问我一句话,就把我吓一跳,总害怕爸爸提起这次考试的事。

爸爸愣了好半天,才明白过来。他一下子把我抱进怀里,我们两个都笑了。我笑得那么欢,爸爸笑得那么甜。

车快开了,当我向父亲告别时,我又看到了那双无语的凝眸在诉说着无尽的希望与期待,我的泪水又流出来了……

篇5:日常英语作文

I usually get up at six o’clock。 I have milk and bread for breakfast。 After breakfast, I take a shower and then I go to school by bus。 I get to school at half past seven。 I have five classes in the morning And then I have lunch at twelve。 In the afternoon I have two classes。 I go home at four o’clock。 I get home at half past four in the afternoon。 I eat dinner at about six o’clock。 After dinner, I do my homework。 I go to bed at ten o’clock。 My life isn’t exciting。

上一篇:2021年本科学年自我鉴定简述下一篇:让青春启航演讲稿